SILT PUMPING PLANT MODERNIZATION
SOLICITATION No. R16PS00121
Amendment #002
The following changes are made:
1. The sign-in attendance list for the site visit held on June 29, 2016 is provided as an attachment #1.
2. The percentage value in section I.17, WBR clause 1452.232-81(d)(4) is changed from
2.5% to 5% and reads as follows:
When progress payments totaling _10_ percent of the total original contract amount have been made by the Government for all other work accomplished under the contract and upon approval of the detailed logic diagram(s) and baseline schedule, the balance of the amount for the mobilization and preparatory work contract line item or 5 percent of the total original contract amount (whichever is the lower) shall be paid to the contractor.
3. The pricing proposal breakdown requirements in section L.13, provision 1452.215- 83(c)(4) are revised. The last three sentences are removed as shown below via a strikethrough:
Pricing proposal breakdown. The offeror shall submit Section B of the contract Schedule with its proposed total prices/costs for each contract line item (including any options) and proposed unit price(s), if required.
In addition, a total proposed price consisting of the sum of all contract line items (excluding options) shall be submitted. The pricing proposal must include a breakdown of all costs associated with each line item in Section B. The cost breakdown must include all costs, such as labor, material, equipment, subcontractor costs, and indirect costs like overhead, general and administrative (G&A), and profit. The offeror shall also provide in the attachment any necessary cross references to assist in tracking the pricing proposal to applicable portions of its technical proposal.
4. The percentage value in section L.15, WBR provision 1452.236-85 is changed from 10% to 5% and reads as follows:
The Contracting Officer estimates that the Section B Mobilization and Preparatory Work schedule line item should not exceed 5 percent of the total bid price. Your attention is directed to contract clause WBR 1452.232-81 Payment for Mobilization and Preparatory Work, which reflects how the Government will pay for this line item, including how payment will be made when the price bid for this schedule line item is higher than the percentage stated herein.
5. Add missing Section 01 74 00 – Cleaning and Waste Management as an attachment #2.
6. Add missing Section 01 78 30 – Project Record Documents as an attachment #3.
7. Correct typing error in Section 01 33 00, article 1.06.B.1.a as an attachment #4
8. Revised date in Section 23 09 00, article 3.01.A as an attachment #5.