Attachment_3_-_Continuation_of_Section_B.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- SILT PUMPING PLANT MODERNIZATION Federal contract opportunity
- Solicitation number
- R16PS00121
About this file
Attachment 3 - Continuation of Section B
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Continuation of Section B in Excel Format | |||||
| Construction Pricing | |||||
| B.1 Price Schedule | |||||
| (a) Offers will be considered for award on the following pricing schedule, but no offer will be considered for award on only a part of the price schedule. | |||||
| (b) Offers are subject to the terms and conditions of this solicitation. | |||||
| (c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1. | |||||
| (d) Definitions: (1) CLIN - Contract Line Item Number | |||||
| PRICE SCHEDULE | |||||
| CLIN | Section | Supplies or Services | Quantity and Unit | Unit Price | Amount |
| 1 | WBR 1452.232-81 | Mobilization and Preparatory Work | For the lump sum of | $ | |
| 2 | 01 33 26 | Electrical Drawings and Data | For the lump sum of | $ | |
| 3 | 03 01 31 | Concrete Removal for New Pumps | For the lump sum of | $ | |
| 4 | 03 30 00 | Cast-in-Place Concrete | For the lump sum of | $ | |
| 5 | 03 48 00 | Precast Concrete Structures | For the lump sum of | $ | |
| 6 | 05 50 00 | Guard Posts | For the lump sum of | $ | |
| 7 | 05 50 00 | Metal Fabrications | For the lump sum of | $ | |
| 8 | 22 11 19 | Remove, Dispose of Existing Equipment, Provide Automatic Vacuum Priming System | For the lump sum of | $ | |
| 9 | 22 11 19 | Stainless Steel Piping, Fittings, Valves, and Appurtenances | For the lump sum of | $ | |
| 10 | 23 00 00 | Heating Ventilating and Air-Conditioning (HVAC) System | For the lump sum of | $ | |
| 11 | 25 01 01 | System Monitoring | For the lump sum of | $ | |
| 12 | 26 05 04 | Remove Existing Electrical Equipment and Cable | For the lump sum of | $ | |
| 13 | 26 05 10 | 600-Volt Insulated Single Conductor, No. 12 AWG | 9,000 lin ft | $ | $ |
| 14 | 26 05 10 | 600-Volt Insulated Single Conductor, No. 10 AWG | 500 lin ft | $ | $ |
| 15 | 26 05 10 | 600-Volt Insulated Single Conductor, No. 4/0 AWG | 30 lin ft | $ | $ |
| 16 | 26 05 10 | 600-Volt Insulated Multi-Conductor Control Cable 12 Conductor, No. 12 AWG | 1,100 lin ft | $ | $ |
| 17 | 26 05 10 | 2,000-Volt DC Locomotive Cable, Single Conductor, No. 10 AWG | 400 lin ft | $ | $ |
| 18 | 26 05 10 | Communication Cable, Shielded, Twisted Pair - 1 Pair, No. 16 AWG | 65 lin ft | $ | $ |
| 19 | 26 05 13 | 5 kV, Shielded, Insulated Single Conductor, 350 MCM Power Cable | 350 lin ft | $ | $ |
| 20 | 26 05 13 | 5 kV, Shielded, Insulated Single Conductor, No 4 AWG Power Cable | 1,000 lin ft | $ | $ |
| 21 | 26 05 33 | 3/4 inch Rigid Steel Conduit | 1,500 lin ft | $ | $ |
| 22 | 26 05 33 | 1-inch Rigid Steel Conduit | 1,000 lin ft | $ | $ |
| 23 | 26 05 33 | 1-1/2-inch Rigid Steel Conduit | 1,100 lin ft | $ | $ |
| 24 | 26 05 33 | 2-inch Rigid Steel Conduit | 350 lin ft | $ | $ |
| 25 | 26 05 33 | 2-inch PVC Schedule 80 Conduit | 100 lin ft | $ | $ |
| 26 | 26 05 33 | 4-inch PVC Schedule 80 Conduit | 100 lin ft | $ | $ |
| 27 | 26 05 33 | 3/4 inch Plastic Coated Rigid Steel Conduit | 100 lin ft | $ | $ |
| 28 | 26 05 36 | Cable Tray System | For the lump sum of | $ | |
| 29 | 26 09 10 | Water Level Switch Assembly | For the lump sum of | $ | |
| 30 | 26 13 15 | Outdoor Medium-Voltage Metal-Clad Switchgear | For the lump sum of | $ | |
| 31 | 26 18 42 | 5 - KV Motor Control Equipment | For the lump sum of | $ | |
| 32 | 26 22 20 | Distribution Transformer | For the lump sum of | $ | |
| 33 | 26 24 30 | Pushbutton Station | For the lump sum of | $ | |
| 34 | 26 24 42 | Distribution Panelboard | For the lump sum of | $ | |
| 35 | 26 25 10 | Metal Enclosed Bus | For the lump sum of | $ | |
| 36 | 26 27 40 | Wiring Devices | For the lump sum of | $ | |
| 37 | 26 40 40 | Refurbishment of Existing Motors | For the lump sum of | $ | |
| 38 | 31 23 11 | Excavation, Backfill and Compaction for Structures and Conduit Trenches | For the lump sum of | $ | |
| 39 | 33 09 10 | Propeller Meter | For the lump sum of | $ | |
| 40 | 33 12 73 | Pumping Unit No. 1 | For the lump sum of | $ | |
| 41 | 33 12 73 | Pumping Unit No. 2 | For the lump sum of | $ | |
| 42 | 33 12 73 | Pumping Unit No. 3 | For the lump sum of | $ | |
| 43 | 33 12 73 | Pumping Unit No. 4 | For the lump sum of | $ | |
| 44 | 33 12 73 | Pump Units Removal | For the lump sum of | $ | |
| 45 | 35 21 94 | Remove, Dispose and Provide Steel Pipe and Appurtenances | For the lump sum of | $ | |
| 46 | 35 22 14 | 14-inch Hydraulically-Operated Ball Valve | 2 each | $ | $ |
| 47 | 35 22 14 | 10-inch Hydraulically-Operated Ball Valve | 1 each | $ | $ |
| 48 | 35 22 14 | 8-inch Hydraulically-Operated Ball Valve | 1 each | $ | $ |
| 49 | 35 22 14 | 8-inch Manually-Operated Butterfly Valve | 2 each | $ | $ |
| 50 | 35 22 14 | 8-inch Pilot-Operated Pressure Sustaining Check Valve | 1 each | $ | $ |
| 51 | 35 22 14 | 4-inch Buried Gate Valve and Valve Box | 1 each | $ | $ |
| 52 | 35 22 14 | Pressure Gauge and Switch Assemblies | For the lump sum of | $ | |
| 53 | 35 22 14 | Removal and Disposal of Existing Valves | For the lump sum of | $ | |
| 54 | 35 22 15 | Remove and Dispose of Existing Equipment | For the lump sum of | $ | |
| 55 | 35 22 15 | Hydraulic Power Unit for Valves | For the lump sum of | $ | |
| TOTAL FOR PRICE SCHEDULE | $ |