This solicitation notice is for the Phoenix Indian Medical Center Elevator Modernization project. The scope of work involves modernizing four passenger elevators in the main hospital building, including removing and disposing of outdated components, supplying and installing new components, refurbishing existing components, and recertifying the elevators in compliance with ASME A17.1 safety standards. The project location is the Phoenix Indian Medical Center located at 4212 North 16th Street in Phoenix, Arizona. The construction period is 300 calendar days with a project magnitude between $1,000,000 to $5,000,000. The proposal due date is June 17, 2021. This 100% small business set-aside solicitation issued by the Indian Health Service seeks proposals for a firm fixed price construction contract to complete the elevator modernization.

View the file

Other files for this federal contract opportunity

Other files attached to PH21PH01H5 PIMC Elevator Modernization, newest first.
File Type Posted
Attachment J05 - Self Performed Calculation Sheet (Construction) 2021.06.03.docx DOCX document
B04 Pre-Proposal Inquiries (11-24) 21R00025.pdf PDF
Attachment J01 - Technical Specification 14 21 00 2021.06.03.pdf PDF
PIMC Occupancy Safety Evaluation 2011.pdf PDF
B05 75H70121R00025 Amendment A000004.pdf PDF
B05 75H70121R00025 Amendment A000003.pdf PDF
Attachment J03 - WD AZ20210031 Building Mod 2 05.21.2021.pdf PDF
Attachment J01 - Technical Specification 14 21 00 Rev 2021.05.24.pdf PDF
B05 75H70121R00025 Amendment A000002.pdf PDF
B05 75H70121R00025 Amendment A000001.pdf PDF
Attachment J01 - Technical Specification 14 21 00 2021.04.22.pdf PDF
Attachment J04 - Site Plan Meeting Location.pdf PDF
Attachment J06 - Financial Institution Reference Sheet.pdf PDF
Attachment J08 - Past Performance Questionnaire.docx DOCX document
Attachment J03 - WD AZ20210031 Building Mod 1 02.26.2021.pdf PDF
Attachment J02 - Infection Control Risk Assessment Permit.pdf PDF
Attachment J05 - Self Performed Calculation Sheet (Construction).docx DOCX document
Attachment J07 - Company Specialized Experience Form Construction.docx DOCX document
Attachment J09 - Key Personnel Resume Form.docx DOCX document
B01 RFP 75H70121R00025.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment of Solicitation Amendment A00003 under Solicitation 75H701-21-R-00025 Project PH21PH01H5, Phoenix Indian Medical Center Elevator Modernization

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00025

PROJECT:

Phoenix Indian Medical Center Elevator Modernization

LOCATION:

Phoenix Indian Medical Center

(PIMC)

4212 North 16th Street Phoenix, AZ, 85016

PROJECT NO: PH21PH01H5

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:

DATE: 5/26/2021 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response

Amendment A00003 dated 5/25/2021

1. Clauses

This FAR regulation appears in the solicitation: 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises

Does this apply to the prime offeror? Will preference be given to the prime Indian offeror, under this regulation?

Kelly

FAR 52.226-1 states that “The Contractor shall use its best efforts to give Indian organizations and Indian-owned economic enterprises (25 U.S.C.1544) the maximum practicable opportunity to participate in the subcontracts it awards to the fullest extent consistent with efficient performance of its contract.” The Contractor in this usage is prime offeror.

There is no Indian Owned Preference provided in Section L and M of the solicitation.

2. Drawings

We do not see the drawings posted to the beta.sam.gov website, although there is a note for “Please Request Role”. However, when we click on the “Request Role” button, it leads us to our profile but does not connect to making a request for the subject solicitation. Can you please advise how we should properly request for the drawings for this solicitation?

Kelly All drawings available for this project are included in the solicitations. We do not have any as-built drawings for this project.

3. SF 1442 Can this bid be extended to June 23rd, 2021? Kelly The proposal due date will be extended from June 7, 2021 to June 17, 2021, 2:00 PM MST. Refer to Amendment A00003.

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3

Project PH21PH01H5, Phoenix Indian Medical Center Elevator Modernization

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00025

PROJECT:

Phoenix Indian Medical Center Elevator Modernization

LOCATION:

Phoenix Indian Medical Center

(PIMC)

4212 North 16th Street Phoenix, AZ, 85016

PROJECT NO: PH21PH01H5

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:

DATE: 5/26/2021 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference

4. SF 1442

Will the Notice to Proceed for the project be issued after all critical pre-construction submittals are approved by the owner, or on award of the contract?

Kelly

The contractor will be provided 30 calendar days to submit and obtain approval by the COR for all critical pre-construction submittals.

The 30 calendar days will begin after bonds are received but no later than 10 days after award. Refer to SF1442, Block 11

5. SF 1442

Can the total project duration from notice of award to substantial completion be extended to 500 calendar days? Kelly

We believe the 300 day project duration is long enough to complete the project. However, if delays occur during the execution of work from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, the Contract Officer may extend the project duration.

6. SF 1442

The project budget is listed as $500,000 - $1,000,000. Can this be updated to the $1,000,000 - $5,000,000 category? Kelly

SF1442, Block 10, Magnitude of construction was corrected to read “$1,000,000 to 5,000,000.00.” Refer to Amendment A00002.

7.

Spec 14 21 paragraph 3.6

The GC is required to provide a QEI for pretest for the completion of the elevator. Will the owner retain the services of a final inspection company for the Certificate of Use?

Bryan

No, the owner will not retain such services.

This section applies to Pre-Test and Testing of the elevators. See Bold text at the end of this section, GC to provide “Upon successful completion of inspection and testing, the GC’s QEI will complete, sign, and provide a Certificate of Compliance/Certificate of Use”.

Refer to Amendment A00002 for revisions to Attachment J01, paragraph 3.6.

Project PH21PH01H5, Phoenix Indian Medical Center Elevator Modernization

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00025

PROJECT:

Phoenix Indian Medical Center Elevator Modernization

LOCATION:

Phoenix Indian Medical Center

(PIMC)

4212 North 16th Street Phoenix, AZ, 85016

PROJECT NO: PH21PH01H5

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:

DATE: 5/26/2021 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference

8.

Spec 14 21 paragraph

1.5 C

Can any drawings for siesmic loading upgrades for this project? Bryan We do not have information regarding prior seismic design.

9.

RFP Section H.17 Submittals

Will the contractor be required to provide a set of as built drawings, documenting the existing conditions as part of the pre-construction phase of the project?

Bryan No. Contractor will be required to provide a set of as-built drawings, documenting post-construction equipment/work installed per section H.42.

10.

Spec 14 21 paragraph

3.1 E

Has the electrical system been inspected for sizing of the feeders and verified it is adequate for the new equipment? Can this verification be provided by the owner? Can the existing feeders be re-used?

Bryan No. Contractor shall determine that existing feeders are code compliant.

Amendment A000XX dated X/XX/2021

11. rfp, Section E E.1 ©

Can the building's general layout drawings be provided to determine distances of the elevator to panels and other critical building utilities? Bryan (Response will be provided in next Amendment)

12. General Question

The Invitation to Bid and Specification does not identify the protocol to obtain permits or designation for the Authority Having Jurisdiction (AHJ). Does there need to be design drawings prepared for the Elevator and Electrical to submit for plan review to obtain a permit with inspections to follow?

Bryan (Response will be provided in next Amendment)

Project PH21PH01H5, Phoenix Indian Medical Center Elevator Modernization

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING

SERVICE

PRE-PROPOSAL INQUIRIES

Solicitation 75H701-21-R-00025

PROJECT:

Phoenix Indian Medical Center Elevator Modernization

LOCATION:

Phoenix Indian Medical Center

(PIMC)

4212 North 16th Street Phoenix, AZ, 85016

PROJECT NO: PH21PH01H5

DOCUMENT

OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:

DATE: 5/26/2021 DEPARTMENT: IHS/PAO/DFE

Item No.

Reference

13.

Technical Specification Section 14 21 10 Part 1

– General;

1.1 Description A

The specification says to provide fully functional elevators in compliance with the latest Edition of ASME A17.1. There are significant changes to the 2019 Edition regarding video communication. Please confirm what Edition is to be used.

Bryan (Response will be provided in next Amendment)

14.

Technical Specification Section 14 21 10 Part 1

– General;

2.46 Car

Enclosure:

Passenger Elevators And 2.48

2.46 says to provide new passenger and service car doors and 2.48 says to retain existing. Please clarify.

Bryan (Response will be provided in next Amendment)

15. Electrical There are four existing disconnects that are providing power to the elevator equipment in the Machine Rooms. Can someone confirm there are existing ground wires with the feeders?

Bryan (Response will be provided in next Amendment)