This is a solicitation notice for the Phoenix Indian Medical Center Elevator Modernization project in Phoenix, Arizona. The project involves modernizing four elevators in the main hospital building, including removing and disposing of outdated components, supplying and installing new components, refurbishing existing components, and performing electrical work, preventative maintenance, and other tasks to provide fully functional elevators in compliance with safety standards. The period of performance is 300 calendar days with a project magnitude between $1-5 million. A site visit is scheduled for May 14, 2021 and proposals are due by June 7, 2021. This will be procured as a 100% small business set-aside for NAICS code 238290 with a size standard of $16.5 million. The contract type will be firm fixed price awarded to the lowest price technically acceptable offeror. Registration in SAM is required to be considered for award.

View the file

Other files for this federal contract opportunity

Other files attached to PH21PH01H5 PIMC Elevator Modernization, newest first.
File Type Posted
Attachment J05 - Self Performed Calculation Sheet (Construction) 2021.06.03.docx DOCX document
B04 Pre-Proposal Inquiries (11-24) 21R00025.pdf PDF
Attachment J01 - Technical Specification 14 21 00 2021.06.03.pdf PDF
PIMC Occupancy Safety Evaluation 2011.pdf PDF
B05 75H70121R00025 Amendment A000004.pdf PDF
B04 Pre-Proposal Inquiries (1-10) 21R00025.pdf PDF
B05 75H70121R00025 Amendment A000003.pdf PDF
Attachment J03 - WD AZ20210031 Building Mod 2 05.21.2021.pdf PDF
Attachment J01 - Technical Specification 14 21 00 Rev 2021.05.24.pdf PDF
B05 75H70121R00025 Amendment A000002.pdf PDF
B05 75H70121R00025 Amendment A000001.pdf PDF
Attachment J01 - Technical Specification 14 21 00 2021.04.22.pdf PDF
Attachment J04 - Site Plan Meeting Location.pdf PDF
Attachment J06 - Financial Institution Reference Sheet.pdf PDF
Attachment J08 - Past Performance Questionnaire.docx DOCX document
Attachment J03 - WD AZ20210031 Building Mod 1 02.26.2021.pdf PDF
Attachment J02 - Infection Control Risk Assessment Permit.pdf PDF
Attachment J05 - Self Performed Calculation Sheet (Construction).docx DOCX document
Attachment J07 - Company Specialized Experience Form Construction.docx DOCX document
Attachment J09 - Key Personnel Resume Form.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDIAN HEALTH SERVICE

DIVISION OF ENGINEERING SERVICES

Solicitation Number: 75H701-21-R-00025 Phoenix Indian Medical Center Elevator Modernization (PH21PH01H5)

Phoenix Indian Medical Center (PIMC) 4212 North 16th Street

Phoenix, AZ, 85016 ISSUE DATE: May 6, 2021 SITE VISIT: May 14, 2021 @ 10:00 AM MST PROPOSAL DUE DATE: June 7, 2021, 2:00 PM MST

PROJECT TABLE OF CONTENTS:

Section Title Section A STANDARD FORM 1442, SOLICITATION, OFFER, AND AWARD (Construction, Alteration, Or Repair) Section B SUPPLIES OR SERVICES AND PRICES/COSTS Section C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK Section D PACKAGING AND MARKING Section E INSPECTION AND ACCEPTANCE Section F DELIVERIES OR PERFORMANCE Section G CONTRACT ADMINISTRATION DATA Section H SPECIAL CONTRACT REQUIREMENTS Section I CONTRACT CLAUSES Section J LIST OF ATTACHMENTS Section K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS Section L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS Section M EVALUATION FACTORS FOR AWARD

Proposals must set forth full, accurate, and complete information as required by this request for proposal (including attachments).

The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

CODE

6. PROJECT NUMBER

8. ADDRESS OFFER TO

4. CONTRACT NUMBER

7. ISSUED BY

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

75H70121R00025

Indian Health Service (IHS) Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Project: PH21PH01H5, Phoenix Indian Medical Center (PIMC) Elevator Modernization

The Contractor shall be responsible for all necessary work to achieve required outcomes, including materials, labor, supervision, equipment, tools, personal protective equipment (PPE), coordination with Authorities Having Jurisdiction (AHJ), travel, and other related expenses to modernize four (4) elevators and provide preventative maintenance in the main hospital building of the Phoenix Indian Medical Center (PIMC).

Project Location: Phoenix Indian Medical Center, 4212 North 16th Street, Phoenix, Arizona, 85016

The full scope of work, technical specifications and photos can be found in Attachment J01 of this solicitation.

See Section L for Proposal Submittal Instructions and Site Visit Information

This project will be procured as a 100% Small Business set-aside solicitation under North American Industry Classification System (NAICS) code 238290 Other Building Equipment Contractors. The associated size standard for this procurement is $16.5 million.

CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $500,000 and $1,000,000, in accordance with FAR 36.204.

Indian Health Service, Phoenix Area OEHE Attn: Kelly Britton 40 N. Central Ave., Suite 720 Phoenix, AZ 85004-4424

Kelly Britton (602) 364-5081 or kelly.britton@ihs.gov

PH21PH01H5

1 6105/06/2021

06/07/2021

2:00pm MST

10 days after award

F.2 FAR 52.211-10

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

27. PAYMENT WILL BE MADE BY

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

B.3.

Indian Health Service (IHS), DES - Seattle 701 5th Ave, Suite 1600 Seattle, WA 98104

Indian Health Service Attn: Financial Management 40 N Central Avenue, Suite 512 Phoenix, AZ 85004

KELLY J. BRITTON

LUMP SUM BASE BID TOTAL - CLINs 0001 AND 0002 $________________

OPTION 1 TOTAL - CLIN 0003 $________________

Solicitation 75H701-21-R-00025 Project: PH21PH01H5, PIMC Elevator Modernization

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1. PRICE SCHEDULE

CLINs Item/Task Description Quantity Unit Unit Price Total

BASE BID ITEMS

0001 Elevator Modernization 0001AA Machine Room (labor & materials) 4 EA $ $ 0001AB Hoistway (labor & materials) 4 EA $ $ 0001AC Entrance (labor & materials) 1 LS $ $ 0001AD Pit (labor & materials) 4 EA $ $ 0001AE Car (labor & materials) 4 EA $ $ 0001AF Car Enclosure (labor & materials) 4 EA $ $ 0001AG Operating Signal (labor & materials) 1 LS $ $ 0001AH General Conditions 1 LS $ $ 0001AI Mobilization 1 LS $ $ 0001AJ Demobilization 1 LS $ $

SUBTOTAL CLIN 0001 (including 0001AA-0001AJ) $

Contractor shall provide Indian Health Service (IHS) with all supervision, labor, and materials to perform Preventative Maintenance of Elevators During Construction in accordance with the requirements of the scope of work, or other attachments and notes attached.

10 MO $ $

LUMP SUM BASE BID TOTAL - CLINs 0001 AND 0002 $

OPTION CLIN:

OPTION 1

Contractor shall provide Indian Health Service (IHS) with all supervision, labor, and materials to perform Preventative Maintenance of Elevators During Warranty Period in accordance with the requirements of the scope of work, or other attachments and notes attached.

Once exercised, adds 365 calendar days to the period of performance

12 MO $ $

TOTAL (BASE + OPTION) $

NOTES:

1. Line Items shall include all salaries, overhead, G&A, fringe benefits, insurance, bonding, profit, travel, materials to include all subcontracting costs, and any other costs detailed in the attached specifications, notes, details, and, plans necessary to perform the work herein. Offeror(s) must submit pricing for the line items in the above schedule.

2. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

As a reminder, all offerors are responsible for allowing for all applicable state, local and tribal (where applicable) taxes and fees within their bids and to perform their own due diligence in ascertaining them.

The Contractor is responsible to pay all applicable taxes, or applicable requirements that may be incurred as a result of this project. Failure on the part of the successful Offeror not to include these fees or the appropriate impacts will not constitute a request for an equitable adjustment to the contract price.

B.2. Incidental Payment Items: The intent of the contract is to provide for the complete work of the project described in the contract. Unless otherwise provided, the contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the project in accordance with the drawings, specifications, and provisions of the contract. Payment for contract work will be made for and under those pay items included in the Schedule of Items (which is one lump sum price for the contract). All other work and materials will be considered as incidental to and included in the payment for items shown.

B.3. SF1442, Block 24: Invoices for payment shall be reviewed and signed by the Contracting Officer’s Representative (COR) (signature) prior to submission to the Contracting Officer (CO). The signed payment invoice shall be sent via e-mail to Contracting Officer (Kelly.Britton@ihs.gov) and the Contracting Officer’s Representative (Bryan.Fischer@ihs.gov).

B.4. Pricing Data Submission: In accordance with FAR 15.403-3(a)(ii), Requiring Data Other Than Certified Cost or Pricing Data, it is requested that pricing data be submitted to show the breakdown of costs for the above CLIN. This is requested so that the determination of a fair and reasonable price can be made by the Contracting Officer. For example, the price breakdown shall have the direct labor cost and the direct material cost broken out.

B.5. Option: The Government will evaluate the Option 1 CLIN 0003 in accordance with FAR Clause 52.217-5, Evaluation of Options (July 1990). Option 1 - CLIN 0003 shall include all applicable OH/profit/taxes/fees/bonding.

IMPORTANT INFORMATION:

Under no circumstances will any oral statements made be binding upon the Government unless such statements or agreements are issued in writing by the Contracting Officer.

Only a warranted Contracting Officer acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed within the change and shall immediately notify the Contracting Officer.

mailto:Kelly.Britton@ihs.gov mailto:Bryan.Fischer@ihs.gov

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

The Contractor shall be responsible for all necessary work to achieve required outcomes, including materials, labor, supervision, equipment, tools, personal protective equipment (PPE), coordination with Authorities Having Jurisdiction (AHJ), travel, and other related expenses to modernize four (4) elevators in the main hospital building of the Phoenix Indian Medical Center (PIMC). The elevators are 1979 Dover passenger elevators that serve six (6) floors at PIMC. The work includes the removal and disposal of elevator components not being used in the modernization, the supply and installation of new components, refurbishment of components, cab interior refurbishment, electrical work, preventative maintenance during construction and warranty period, minimum one year warranty, and all other work necessary to provide fully functional elevators in compliance with the latest Edition of ASME A17.1 Safety Code for Elevators and Escalators. The successful Contractor shall coordinate with PIMC’s access control vendor for access controls on designated elevators and PIMC’s fire alarm vendor for any required fire alarm initiating devices per NFPA 72 standards.

LOCATION OF PROJECT: PIMC

4212 North 16th Street Phoenix, AZ 85016.

The technical specifications and photos applicable to Project No. PH21PH01H5, PIMC Elevator Modernization are provided as an attachment, see Section J – Attachment J01 Technical Specification 14 21 00.

If discrepancies are found between the attached plans/specifications and codes or standards as referenced, the codes or standards shall govern, unless noted otherwise.

END OF SECTION

SECTION D – PACKAGING AND MARKING

D.1. PACKAGING AND MARKING

(a) All shipments of materials, equipment and/or supplies to the project site shall be addressed to the Contractor and not the Indian Health Service. Preservation, packaging and packing shall be in accordance with industry standard packaging appropriate for the item(s) involved. The Indian Health Service is not responsible in any manner for deliveries intended for the project that are not generated by the Indian Health Service.

(b) Equipment and materials provided by the Contractor shall be new and, where appropriate, shall arrive on-site sealed in original manufacturer’s containers. The Government reserves the right to refuse any items deemed to not meet this requirement.

(c) Material shall be stored in an enclosed and dry area protected from damage and soiling. The contractor shall coordinate a suitable storage area with the Facility Manager.

END OF SECTION

SECTION E – INSPECTION AND ACCEPTANCE

E.1. FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these two web addresses - This for FAR:

https://www.acquisition.gov/far/ and this for HHSAR: http://www.hhs.gov/policies/hhsar/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

Number Title Date 52.246-4 Inspection of Services – Fixed Price Aug 1996 52.246-12 Inspection of Construction Aug 1996

E.2. INSPECTION OF SITE

(a) The Contractor shall be responsible for the complete coordination and proper relation of the work of all trades on each contract.

(b) No allowances or extra construction on behalf of any Contractor will be permitted subsequently by reason of error or oversight on the part of any sub-contractor at any tier, or on account of interferences by the activities of the owner or others unless permissible in accordance with FAR 52.246-12, Inspection of Construction.

(c) All dimensions shown on government provided drawings are based on “as-built” record drawings and, to the extent possible, accurately represent existing conditions; however, there may be some variance between existing conditions and contract drawings. The Contractor is responsible for verifying all dimensions and for reporting to the CO any discrepancies that may affect performance of the work represented by contract drawings and specifications.

E.3. INSPECTIONS

The Government reserves the right to inspect all aspects of work performed, including hiring a third party inspector to verify proper installation and operation. Contractor is required to demonstrate full and complete operation of all work performed. Final acceptance will be based on an acceptable final inspection.

(a) Substantial Completion Inspection

(1) Substantial completion is the date when the work is sufficiently complete, in accordance with the contract documents, ready for beneficial occupancy or the designated portion thereof, for the use for which it is intended.

(2) The Government at this point will conduct an inspection for the development of punch list items in preparation for final inspection.

(3) The substantial completion inspection should be at least 15 days prior to the contractual completion date and the date of final inspection. The Contractor is to notify the CO at least 10 days in advance to schedule the substantial completion inspection.

(4) If at the time of the substantial completion inspection the Government finds that the Contractor will not have the project complete at the contract completion date, the CO will withhold 10% of any progress payment due the Contractor. These funds will be used to off-set any liquidated or https://www.acquisition.gov/far/ http://www.hhs.gov/policies/hhsar/ actual damages assessed against the Contractor. Remaining funds will be released upon final inspection, and completion of the contract.

(b) Final Inspection

(1) Final Inspection completion date is the date established in the contract when the project is to be fully complete and is ready to turn over to the Government. When the Contractor is ready for final inspection, he shall request so in writing to the Contracting Officer and his duly authorized representative (COR) at least 5 days prior to the desired date.

(2) This includes final clean-up of the site, removal of all trailers, construction signs and debris removed, all punch list items resolved, Government’s manuals turned over, all as built drawings completed and turned over to the Government.

(3) All contract items, including any punch-list items, and final clean-up of the project site shall be totally complete on the day and at the time the final inspection is scheduled. Any discrepancies noted at the final inspection shall be corrected by the Contractor within the time specified by the Contracting Officer.

(4) Failure on the part of the Contractor to have the project ready for final inspection may result in assessment of damages as specified in the contract.

(5) Final inspection and acceptance of the work will be by the CO or an authorized representative appointed in writing.

END OF SECTION

SECTION F – DELIVERIES OR PERFORMANCE

F.1. 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(s):

https://www.acquisition.gov/far/ (End of clause)

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

Number Title Date 52.242-14 Suspension of Work Apr 1984

F.2. SOLICITATION CLAUSES INCORPORATED BY FULL TEXT

FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 300 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

FAR 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)

(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(End of clause)

F.3. CONTRACTOR PERFORMANCE INFORMATION

(1) Evaluating Contractor Performance: The Indian Health Service is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process. CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is Contractor Performance Assessment.

Completed CPARS evaluations are sent to the Past Performance Information Retrieval System (PPIRS) which may then be used by Federal acquisition community for use in making source selection decisions.

PPIRS assists acquisition officials by serving as the single source for contractor past performance data.

(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS. The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.

(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (CPARS Training) and updated as needed.

(4) Contractor Representative (CR) Role: All evaluations will be sent the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation.

https://www.cpars.gov/ https://www.cpars.gov/ https://www.cpars.gov/lc.htm

If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.

Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.

IHS shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between IHS and the contractor regarding IHS’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.

Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.

END OF SECTION

SECTION G – CONTRACT ADMINISTRATION DATA

G.1. CONTRACTING OFFICER

The Contracting Officer (CO) is the individual appointed with the authority to enter into, obligate funds, administer and make related determinations pertaining to the contract on behalf of the federal Government. The Contracting Officer must sign all contractual documents, including contract modifications, and approve payment requests. The Contracting Officer is the only individual authorized to make changes to the contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract, you shall not proceed with the unauthorized direction and shall immediately notify the Contracting Officer.

G.2. CONTRACTING OFFICER’S REPRESENTATIVE (COR)

(a) Contracting Officer's Representatives (COR), may be appointed for the purpose of representing the Contracting Officer and assuring compliance with the contract requirements.

(b) The COR does NOT have the authority to alter the Contractor’s obligations under the contract; direct changes that fall within the purview of the “Changes” clause of the contract; or modify any of the terms, conditions, specifications, or cost of the contract.

(c) The COR may approve minor field changes which do not affect the scope, period of performance and/or price of the contract. The COR is authorized to issue notices regarding noncompliance of contract requirements, and to stop work on any portion of the job if the Contractor's methods cause unsafe conditions or will result in noncompliant work which would be impracticable to correct or to replace while permitting other (conforming) portions of the work to continue. Issuance of a Notice of Noncompliance as described herein does not constitute a suspension of work as described in FAR Clause 52.242-14, Suspension of Work (April 1984).

(d) The COR is appointed in writing and the contractor will receive a copy of the appointment letter.

G.3. CONTRACT ADMINISTRATION DATA

Administration of this contract is under the cognizance of the Indian Health Service, Office of Environmental Health and Engineering, Division of Engineering Services.

(a) The Contracting Officer (CO) for this procurement is:

Kelly Britton Indian Health Service (IHS)/Phoenix Area OEHE 40 N. Central Avenue, Suite 720 Phoenix, AZ 85004-4424 Telephone Number: (602) 364-5081 Kelly.britton@ihs.gov

(b) The Contracting Officer’s Representative (COR) for this procurement is:

Bryan Fischer Indian Health Service (IHS)/Phoenix Area OEHE 40 N. Central Avenue, Suite 720 Phoenix, AZ 85004-4424 Telephone Number: (602) 364-5063 Bryan.Fischer@ihs.gov

G.4. ADDRESS FOR CORRESPONDENCE

(a) It is the intent of the Government to use electronic means as much as possible while administering this contract.

(b) Most correspondence should be sent via e-mail directly to the Contracting Officer (Kelly.Britton@ihs.gov) and Contracting Officer Representative (Bryan.Fischer@ihs.gov). Include the Contract Number on all correspondence. Any overnight Mail and U.S. Mail shall be sent to the Contracting Officer, unless otherwise specified, at the following address:

Indian Health Service (IHS)/Phoenix Area OEHE Attn: Kelly Britton 40 N. Central Avenue, Suite 720 Phoenix, AZ 85004-4424

G.5 PAYMENT PROCESS

(a) FAR 52.232-5, Payments Under Fixed -Price Construction Contracts, requires that before the first progress payment under the contract is submitted, the contractor shall prepare a Schedule of Values including each principal category of the work which when added together equal the total contract price. A sample format is available from the Contracting Officer. The following is the detail required by the Contracting Officer:

(1) The principle categories of work shall be broken into line items of sufficient detail to allow meaningful measurement of the work on a monthly basis as determined by the COR. Units of measure appropriate to the type of work shall be used. “Lump sum” pricing of line items shall be avoided except where payment for that line item is to be requested based on 100% completion of that line item or where there is no other practical unit of measure.

(2) The cost of preparatory work (e.g., shop drawings or product submittals), field and home office overhead, profit, insurance, taxes, warranties, as-built drawings, etc., shall be pro-rated into items of physical work and not listed as separate line items. Cost of Performance and Payment Bonds may be listed as a single line item and not pro-rated. Also, cost of mobilization mailto:Kelly.britton@ihs.gov mailto:Bryan.Fischer@ihs.gov mailto:Kelly.Britton@ihs.gov mailto:Bryan.Fischer@ihs.gov and demobilization relating to transportation or installation costs associated with such items as site trailers, heavy equipment, temporary batch plants, temporary on-site manufacturing and assembly facilities, temporary on-site quarter’s facilities, temporary sanitation facilities, temporary utility connections, and/or temporary secured storage facilities may be listed as line items and not pro-rated. If mobilization is listed separately, a line item for demobilization must be listed separately. A detailed listing of the items included and the individual cost for each item shall be provided in support of proposed amounts for mobilization and demobilization.

(b) Material stored on site may be included in earned progress if the Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform in contract.

(c) The following are instructions for submitting pay requests:

(1) Requests are to be submitted with signature for the Contractor certification statement (scanned signature okay) to the Designated Billing Office. Use of a format that complies with all of the requirements of the “Payments” clause of the contract is mandatory. The “Contractor Payment Application” form will be provided at the Pre-Construction meeting.

(2) The Contractor is responsible for delivery of each request for payment to the billing office.

Hand delivery to the COR in the field does not constitute delivery to the billing office.

(3) If the contractor wishes to inquire concerning the status of any pay request, the contractor should contact the Contracting Officer.

(4) A completed Release of Claims that complies with the requirements of the “Payments” clause must be submitted with the request for final payment. A sample format is available from the Contracting Officer.

(d) The final payment request will be rejected and returned to the contractor if all items required under the contract have not been completed, submitted, approved, and accepted prior to the receipt of the request; e.g., deficient work items, as-built, payrolls, reports, O&M manuals, warranties, delivery of extra stock material, etc.

G.6. PAYMENT FOR MATERIALS STORED ON SITE

(a) This clause supplements, but does not replace, FAR 52.232-5 Payments Under Fixed-Price Construction Contracts, with regard to material payments.

(b) Consideration for payment under this contract for materials stored on site is subject to the following conditions:

(1) The contractor shall furnish the contracting officer a list of the major high-cost items to be incorporated into the contract and for which payment, prior to installation, will be requested. Those items approved by the contracting officer will be entered on the Schedule of Values, as a percentage factor, or factors if items are listed individually.

(2) Payment is limited to major high-cost items. Payment of major high-cost items does not include contractor overhead and profit. Costs such as sales tax, freight, handling, pallets, etc., are excluded.

(3) Payment requests shall be consistent with approved material submittals and shall be supported by the following documents:

(i) Certified paid vendor invoices

(ii) Inventory checklists, jointly validated by the contractor, contracting personnel, and/or construction inspector.

(iii) Accepted delivery tickets, if applicable.

(4) All material for which payment is requested shall be delivered to an approved location on-site, and certified that none will be removed without written permission of the contracting officer. Materials may also be stored in a bonded warehouse offsite if no adequate storage space is available on base.

(5) Payments will be made monthly, or at more frequent intervals as determined by the contracting officer.

(6) The contractor shall remain responsible and retain title to the materials until incorporated into the work.

G.7. INVOICE REQUIREMENTS

(a) Invoices shall be prepared, submitted and paid in accordance with the following FAR clauses specified in Section I:

(1) 52.232-5, Payments Under Fixed -Price Construction Contracts (May 2014)

(2) 52.232-27, Prompt Payment for Construction Contracts (Jan 2017)

(3) 52.232-33, Payment by Electronic Funds Transfer-- System for Award Management (Oct

2018)

(4) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)

(DEVIATION APR 2020)

(b) The Designated Billing Office for this contract is the same as the address for correspondence, sent to the attention of the CO. Invoices that have been verified as correct by the COR and shall be emailed to the CO, unless otherwise instructed by the CO. The signed payment invoice shall be sent via e-mail to the IHS Contracting Officer.

(c) Progress payments WILL be authorized for this project.

(d) The final invoice must be marked “Final” and be accompanied by a Release of Claims form, which lists the final payment as outstanding, in the Remarks field. The Release of Claims form is available from the CO. Final payment will be made within 30 Calendar days upon receipt of a properly executed invoice.

(e) The contractor will contact the Designated Billing Office with any payment issues or concerns.

Note: In accordance with FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec 2013) (Dec 2013) (DEVIATION APR 2020) -- Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor. This applies to all small business subcontractors at all tier levels.

G.8. INVOICE REQUIREMENTS FOR PREVENTATIVE MAINTENANCE (CLINs 0002 and Option CLIN 0003, if exercised)

(a) Invoices shall be prepared, submitted and paid in accordance with FAR 52.232-25 Prompt Payment and Section B, paragraph B.3. SF1442, Block 24.

(b) Payment for recurring monthly services will be made on the basis of a monthly invoice, in arrears. A copy of the work ticket containing a complete description of the work performed shall be provided to the PIMC Facility Manager and included with the monthly invoice. Monthly invoices must be submitted after all required paperwork has been sent to the COR. Invoices received prior to the Government’s receipt of the required work ticket(s) will be rejected.

G.9. CERTIFICATION OF PAYMENTS - RELEASE OF CLAIM

The Contractor, when submitting final payment under this contract, shall submit to the Contracting Officer:

(a) A certification that the Contractor has made payment from proceeds of prior payments, or that he will make timely payment from the proceeds of the progress or final payment then due him, to any subcontractors and suppliers in accordance with established contractual arrangements; and

(b) A properly executed Contractor's Release. The Release of Claims form is available from the Contracting Officer. Failure to submit this completed release will result in a delay of final payment.

END OF SECTION

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1. ORDER OF PRECEDENCE - REQUIREMENTS, SPECIFICATIONS, DRAWINGS

Resolve any inconsistencies in the Specifications of this solicitation and any resultant contract by giving precedence in the following order:

(a) The Schedule Section B

(b) Section I – Terms & Conditions

(c) Section H – Special Contract Requirements

(d) Section C – Statement of Work

(e) Specifications

(f) Drawings

1. Drawings, figured dimensions over scaled dimensions

2. Drawings, large scale contract drawings over small scale contract drawings

3. Schedules on contract drawings over any conflicting notations on contract drawings.

4. Shop Drawings – (The term "Shop Drawings", includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract.)

H.2. APPLICABLE WAGE RATES

Applicable Construction Wage Decision for this contract is for Maricopa County in California:

Attachment J03, Wage Determination: General Decision Number AZ20210031, Building

H.3. APPROVED EQUIVALENTS (OR EQUALS)

Contractor proposed equivalents shall be submitted for review after award as a Request for Information (RFI). Proposed equivalents will not be reviewed during the solicitation period.

H.4. WORK HOURS

The Phoenix Indian Medical Center’s normal business hours are 7:00 AM – 5:00 PM, Monday through Friday (excluding Federal holidays). Work at other times must be approved by the COR. Requests to work outside normal business hours shall be submitted in writing to the COR not less than 48 hours in advance of the proposed modified schedule. This requirement is due to the need for security of patients, government personnel and property. There must be a 'responsible government agent' on site when any contractor is present on IHS property.

Note: Four (4) day work weeks will be considered upon written request and must be clearly identified in the project schedule.

H.5. FEDERAL HOLIDAYS

(a) The Government only recognizes the following legal holidays established by federal statue:

New Year's Day January 1 Birthday of Martin Luther King, Jr. Third Monday in January Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25

(b) Any of the legal holidays falling on Saturday will be observed on the preceding Friday; legal holidays falling on Sunday will be observed on the following Monday.

(c) The contractor should not perform work on observed legal holidays unless authorized by the Contracting Officer. In the event work is authorized on observed legal holidays, the contractor shall pay all applicable overtime and/or holiday pay rates required by law.

H.6. SUBCONTRACTS

(a) Nothing contained in the contract shall be construed as creating any contractual relationship between any subcontractor and the Government. The divisions or sections of the specifications are not intended to control the contractor in dividing the work among subcontractors, or to limit the work performed by any trade.

(b) The contractor shall be responsible to the Government for acts and omissions of his own employees, and of subcontractors and their employees. He shall also be responsible for the coordination of the work of the trades, subcontractors, and suppliers.

(c) The Government will not undertake to settle any differences between or among the contractor and his subcontractors or suppliers.

(d) The contractor shall, without additional expense to the Government employ specialty subcontractors where required by the specifications. "Specialty Subcontractors," when specified as a requirement, means a subcontractor regularly engaged in the manufacture or installation of the contract items. The specialty subcontractor shall select and combine the materials involved, maintain and have available for the purpose, workmen skilled in the specified work. The specialty subcontractor shall be the manufacturer, be licensed by the manufacturer as an installer, or work under direct supervision of the manufacturer.

(e) In accordance with FAR 52.222-11 Subcontracts (Labor Standards) within 14 days after award of the contract, the Contractor shall deliver to the Contracting Officer a completed Standard Form (SF)

1413, Statement and Acknowledgment, for each subcontract for construction within the United States, including the subcontractor’s signed and dated acknowledgment that the clauses set forth in paragraph (b) of this clause have been included in the subcontract.

(f) Within 14 days after the award of any subsequently awarded subcontract the Contractor shall deliver to the Contracting Officer an updated completed SF 1413 for such additional subcontract.

H.7. SUBCONTRACTING

(a) The contractor shall be responsible for the management and performance of all subcontracts. The contractor shall ensure subcontractors are competent and capable of handling all assigned work.

The contractor shall ensure contract is completed within the stated requirements.

(b) In connection with the performance of work under this contract, the contractor shall not subcontract with any subcontractor who, at the time of subcontract award, is listed on the current GSA's Lists of Parties Excluded from Procurement and Non-procurement Programs, unless otherwise authorized by the Government in accordance with Subpart 9.4 of the Federal Acquisition Regulations. Refeernce FAR 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment

(c) The List of Parties Excluded from Procurement and Non-procurement Programs is available at https://www.sam.gov.

(d) In the event of the contractor's noncompliance with the foregoing requirements, the Government may terminate this contract for default or take other appropriate action, including, but not limited to, requiring the contractor to terminate any such subcontract and substitute an eligible subcontractor in lieu thereof, at no increase in the contract price or time for performance.

(e) The term "subcontractor," as used in this clause, shall mean the individual or firm with whom the contractor proposes to enter into a subcontract for manufacturing, fabricating, installing, or otherwise performing work under this contract.

(f) The contractor shall include the provisions of paragraphs a., b., and d. of this clause in every subcontract hereunder.

H.8. INSURANCE

FAR 52.228-5, Insurance Work on a Government Installation, states that "The contractor shall, at its own expense, provide and maintain during the entire performance period of this contract, at least the kinds and minimum amounts of insurance required in the schedule or elsewhere in the contract." The following is the minimum insurance required by the Contracting Officer:

(a) Workers' Compensation and Employer's Liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so comingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

(b) General Liability: Bodily injury liability insurance coverage written on the comprehensive form of a policy of at least $500,000 per occurrence.

https://www.sam.gov/

(c) Automobile Liability: Automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

H.9. KEY PERSONNEL

(a) Certain experienced professional and/or technical personnel are essential for successful accomplishment of the work to be performed under this contract. Such personnel are defined as "Key Personnel" and are those persons whose resumes were submitted for evaluation of the proposal. The contractor agrees that such personnel shall not be removed from the contract work or replaced without compliance with the following:

(1) If one or more of the key personnel, for any reason, becomes or is expected to become unavailable for work under this contract for a continuous period exceeding 30 calendar days, or is expected to devote substantially less effort to the work than indicated in the proposal or initially anticipated, the contractor shall, subject to the concurrence of the Contracting Officer promptly replace personnel with personnel of equal or greater ability and qualifications.

(2) All requests for approval of substitutions hereunder must be in writing at least 15 calendar days prior to the substitution, circumstances permitting, and provide a detailed explanation of the circumstances necessitating the proposed substitutions. The request must contain a resume for the proposed substitute with equal to or greater qualifications, and any other information requested by the Contracting Officer. The Contracting Officer shall promptly notify the contractor of approval or disapproval in writing.

(b) The following positions are identified as Key Personnel: (1) Project Manager, (2) Superintendent and the (3) Safety Officer.

H.10. PROJECT MANAGEMENT

(a) Contractor shall meet with the Facility Manager prior to beginning on-site work to discuss general security and operations requirements.

(b) Refer to Technical Specification, Paragraph 1.7 PROJECT SCHEDULE/SEQUENCING for notification requirements prior to starting work on elevators.

(c) Construction activities shall be coordinated with Facility Manager to ensure that there are no detrimental impacts on the day to day operations of the hospital or on patient safety.

(d) The project shall be completed while the Phoenix Indian Medical Center remains operational. The Contactor shall work closely with Facility Manager to schedule work, but any variances from the approved Project Schedule must be coordinated with the COR first and approved by the CO before becoming effective.

H.11. SUPERINTENDENT ON SITE

(a) Reference FAR 52.236-6 Superintendence by the Contractor. The contractor will ensure that the Project Superintendent is on site at all times work is being performed by the contractor or subcontractor(s). They shall directly oversee all apprentice and subcontractor work. The Project Superintendent is also responsible to ensure all labor and safety requirements are complied with;

and ensure that the worksite is cleaned up at the end of each work day.

(b) All communications between the IHS and contractor concerning the day-to-day workmanship on the project will be handled through the Project Superintendent and they MUST have the authority to act on behalf of the Contractor in all contractual matters.

H.12. IDENTIFICATION OF CONTRACTOR EMPLOYEES

(a) Identification (ID) Badges. The Contractor shall provide each employee that will be onsite with an ID badge on contract start date or on employment start date. The ID badge shall be made of non-metallic material. The badge shall be easily readable and include the employee's name, the Contractor's name, functional area of assignment, and a color photograph. The Contracting Officer or their designee shall approve the ID badge template before the contract start date.

(b) Display of ID Badges. Contractor personnel shall wear the ID badge at all times when performing work under this contract onsite or to attend Government meetings and conferences related to the contract. Unless otherwise specified in the contract, each Contractor employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement. Contractor visitor badges may be issued by the facility in addition to Contractor badges.

(c) Utilizing Electronic Mail (e-mail). When prime Contractor or Subcontractor personnel send e-mail messages as part of contract performance or otherwise relating to contract matters, each sender shall include his/her name (both first and last names), e-mail address and the name of the individual’s employer.

H.13 EMPLOYEE APPEARANCE

The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The Contracting Officer reserves the right to determine the acceptability of any clothing worn.

H.14.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .