This solicitation notice is for the PH21PH01H5 PIMC Elevator Modernization project, a construction project for the modernization of four elevators at the Phoenix Indian Medical Center located in Phoenix, Arizona. The scope of work includes the removal and disposal of existing elevator components, supply and installation of new components, cab interior refurbishment, electrical work, preventative maintenance during construction and a minimum one-year warranty period. The period of performance is 300 calendar days from notice to proceed. This is a 100% small business set-aside procurement with a NAICS code of 238290 and size standard of $16.5 million. The contract type is firm-fixed price. The proposal due date is June 7, 2021. The solicitation will be procured using FAR Part 15 procedures with lowest price technically acceptable evaluation criteria.

View the file

Other files for this federal contract opportunity

Other files attached to PH21PH01H5 PIMC Elevator Modernization, newest first.
File Type Posted
B05 75H70121R00025 Amendment A000004.pdf PDF
Attachment J05 - Self Performed Calculation Sheet (Construction) 2021.06.03.docx DOCX document
B04 Pre-Proposal Inquiries (11-24) 21R00025.pdf PDF
Attachment J01 - Technical Specification 14 21 00 2021.06.03.pdf PDF
PIMC Occupancy Safety Evaluation 2011.pdf PDF
B05 75H70121R00025 Amendment A000003.pdf PDF
B04 Pre-Proposal Inquiries (1-10) 21R00025.pdf PDF
Attachment J01 - Technical Specification 14 21 00 Rev 2021.05.24.pdf PDF
B05 75H70121R00025 Amendment A000002.pdf PDF
Attachment J03 - WD AZ20210031 Building Mod 2 05.21.2021.pdf PDF
B05 75H70121R00025 Amendment A000001.pdf PDF
Attachment J01 - Technical Specification 14 21 00 2021.04.22.pdf PDF
Attachment J04 - Site Plan Meeting Location.pdf PDF
Attachment J06 - Financial Institution Reference Sheet.pdf PDF
Attachment J08 - Past Performance Questionnaire.docx DOCX document
Attachment J05 - Self Performed Calculation Sheet (Construction).docx DOCX document
Attachment J07 - Company Specialized Experience Form Construction.docx DOCX document
Attachment J09 - Key Personnel Resume Form.docx DOCX document
B01 RFP 75H70121R00025.pdf PDF
Attachment J03 - WD AZ20210031 Building Mod 1 02.26.2021.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Infection Control Risk Assessment Permit

Work Location/Description:

Start Date End Date:

Project Manager Name / Phone Number :

� TYPE A:

� TYPE B:

� TYPE C:

� TYPE D:

� Low Risk � Medium Risk � High Risk � Highest Risk

Identify Any Adjacent High Risk Areas:

�Above � Below � Front � Behind � Lateral � NA

CLASS 1 1 Minimize raising dust from construction operations 2 Immediately replace any ceiling tile displaced for visual inspection.

1 Minor demolition for remodeling.

CLASS II 1 Minimize raising dust by water misting work surfaces to control dust while cutting.

2 Seal unused doors with duct tape.

3 Block off and seal air vents with plastic or impervious material.

4 Wipe surfaces with cleaner/disinfectant.

5 Isolate HVAC system in areas where work is being performed

1 Contain construction waste prior to transport in tightly covered containers.

2 Wet mop and/or vacuum with HEPA-filtered vacuum prior to leaving area.

3 Remove critical barrier(s) carefully to minimize spread of dirt/debris.

4 Use hospital-approved disinfectant 5 Place dust mat at entrance and exit of work area.

7 Restore HVAC when work completed.

CLASS III 1 Infection control permit prior to construction.

2 Isolate HVAC system in area of work to prevent contamination of the duct system.

3 Complete all critical barriers or implement control cube or other method prior to work.

4 Maintain negative air pressure within work environment with HEPA-equipment.

5 Do not remove barriers from site until completed project is checked by infection Control.

6 Environmental Services thoroughly cleans.

1 Vacuum work with HEPA-filtered vacuum.

2 Wet mop with hospital approved cleaner/disinfectant.

3 Remove barrier materials carefully to minimize spread of dirt/debris.

4 Contain construction waste prior to transport in tightly covered containers.

5 Cover transport receptacles or carts.

6 Tape coverings.

7 When complete, restore HVAC system where work was performed.

CLASS IV 1 Obtain Infection Control permit prior to start of construction.

2 Isolate HVAC system in work area to prevent contamination of duct system.

3 Complete all critical barriers or use control cube method prior to start of construction.

4 Maintain negative air pressure within work site – utilizing HEPA-equipped air filtration units.

5 Seal holes, pipes, conduits, and punctures.

6 Construct anteroom and require all personnel to pass through this room so they can be vacuumed off using a HEPA vacuum cleaner before leaving work site, or wear protective paper coveralls (bunny suit) that is removed each time leaving the work site.

7 Require all personnel entering work site to wear shoe covers.

1 Do not remove barriers from work site until project is checked by Infection Control; and is thoroughly cleaned by environmental services.

2 Vacuum work area with HEPA-filtered vacuums.

3 Wet mop with hospital–approved disinfectant.

4 Remove barrier(s) carefully to minimize spread of dirt/debris associated with construction.

5 Contain construction waste prior to transport in tightly covered containers.

6 Cover transport receptacles or cart.

7 Tape coverings.

8 At completion, restore HVAC system where work was performed.

Permit Requested By Signature / Date Infection Control Signature / Date

Project: PH21PH01H5, PIMC Elevator Modernization

Attachment J02

2 | P a g e

Class Determination

RISK GROUP TYPE A TYPE B TYPE C TYPE D

LOW Risk Class 1 Class II Class II Class III/IV MEDIUM Risk Class 1 Class II Class III Class IV HIGH Risk Class 1 Class II Class III/IV Class IV HIGHEST Risk Class II Class III/IV Class III/IV Class IV

Risk Groups Low Risk

Office areas, Maintenance, Housekeeping, Storage Areas, Stairwells, Storage buildings, Warehouse, Library, Meeting Rooms, Staff Lounges, Empty Patient Rooms

Medium Risk Clinical areas, Physical Therapy, Radiology, Dental, Behavioral Health, Same Day Surgery, Outpatient Services, Cafeteria, Snack Bar

High Risk Emergency Room, Laboratories, Pharmacy, Occupied Patient Rooms, Inpatient Departments, Food Preparation Areas, Nursery, PACU, Above Ceiling Work in Open Interstitial Space within 100 Linear Feet of Group III/IV, Labor and Delivery, Medication Rooms.

Highest Risk Sterile Areas, Segregated Compound Area (IV Room), Containment Segregated Compounding Area (Chemo), Airborne Isolation, Positive Pressure Rooms, Sterile Supply, Operating Rooms, C-Section Operating Rooms, Endoscopy, Intensive Care, Oncology Infusion.

Project Type TYPE A Inspection and non-invasive activities

Removal of ceiling tiles for visual inspection only ( limited to one tile per 50 square feet) Painting, not sanding Wallcovering, electrical trim work, minor plumbing, and activities that do not general dust or require cutting of walls or access to ceiling other than for visual inspection

TYPE B Small-scale, short duration activities that create minimal dust

Installation of telephone and computer cabling Access to chase spaces Cutting of walls or ceiling where dust migration can be controlled

TYPE C Work that generates moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Sanding of walls for painting or wall coverings Removal of floor covering, ceiling tiles, and case work New wall construction Minor duct work or electrical work above ceiling Major cabling activities Activities that cannot be completed in a single work shift

TYPE D Major demolition and construction projects

Activities that require consecutive work shifts Required heavy demolition or removal of a complete cabling system New Construction