This document contains a submittal list and federal contract opportunity for replacing shoreside floating docks at Pearl Harbor National Monument in Hawaii. The submittal list specifies technical documentation required for the dock replacement project, including construction schedules, safety plans, welding certifications, product data and test reports, shop drawings, and floating dock designs. The related federal contract opportunity from the National Park Service seeks to replace two concrete floating dock sections and gangways providing access to the USS Arizona Memorial. The new docks will be post-tensioned and prefabricated, equipped with skid resistant coatings, aluminum rails and gates, mooring systems, and a davit for lifting items to and from the water. A shoreside structural mooring system and stabilization of the dock and gangways are also included. The project aims to extend safe visitor access to over one million annual visitors at the memorial for 20-30 years.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal List

PMIS 264852: REPLACE SHORESIDE FLOATING DOCK
TECHNICAL SUBMITTALSREQUIREMENTS (indicate with an "X")
Spec. Sec.Par. No.DescriptionINFORMATIONALACTION
CERT./LAB TESTREPORT/CALC.
OR PLANMfg. DATA
& INSTRUCTIONSREFERENCE/INFOSHOP DRAWINGSAMPLEMfg. DATA
& INSTRUCTIONSINSPECTION
01 11 411.1STAGING AND LAYDOWN AREA PLANXX
01 32 161.3CONSTRUCTION SCHEDULEX
01 32 161.3SCHEDULE OF VALUESX
01 33 232.2WELDING CERTIFICATIONXX
01 33 232.2INSTALLER CERTIFICATESXX
01 33 232.2MANUFACTURER CERTIFICATESXX
01 33 232.2PRODUCT CERTIFICATESXX
01 33 232.2MATERIAL CERTIFICATESXX
01 33 232.2RESEARCH/EVALUATION REPORTSXX
01 33 232.2PRECONSTRUCTION TEST REPORTSXX
01 33 232.2COMPATIBILITY TEST REPORTSXX
01 33 232.2FIELD TEST REPORTSXX
01 33 232.2MAINTENANCE DATAXX
01 33 232.2DESIGN DATAXX
01 33 232.2MANUFACTURER'S INSTRUCTIONSXX
01 33 232.2MANUFACTURER'S FIELD REPORTSXX
01 35 231.2VISITOR ACCESS / SAFETY PLANXX
01 40 001.4QUALITY CONTROL PLANXX
01 40 001.4QUALIFICATION DATAX
01 40 001.4MATERIAL TEST REPORTSXX
01 40 001.4PRODUCT TEST REPORTSXX
01 40 001.4OFF-SITE INSPECTION REPORTXX
01 57 231.3UNDER ACRE POLLUTION PREVENTION PLANXX
01 73 401.2DOCK TEMPORARY STABILIZATION PLANXX
01 77 001.3CLOSEOUT SUBMITTALSXX
03 31 291.5CONCRETE REINFORCING STEELXXXX
03 31 291.5CONCRETE PRODUCT DATAXXX
03 31 291.5CONCRETE MIX DESIGNXXX
03 31 291.5CONCRETE TEST REPORTSXXX
03 31 291.5CONCRETE CERTIFICATESXX
03 38 001.4POST-TENSIONING SUBMITTAL REVIEWXXXXX
03 38 001.5POST-TENSIONING INSPECTIONX
05 50 001.4STRUT MOORING SYSTEMXXXXXX
05 50 003.2STRUT MOORING SYSTEM COATINGXXXX
05 52 001.5METAL RAILINGSXXXXXXX
09 90 001.5PAINTING AND COATINGSXXXXX
35 51 231.9FLOATING DOCK DESIGN SUBMITTALXXXXXX
35 59 941.5ALUMINUM GANGWAYSXXXXX