PERL High tide 10.20.20_0001.pdf
PDF 163 KB Posted
- Attached to
- PERL 264852 Pearl Harbor National Monument Repla
- Solicitation number
- 140P2021R0016
About this file
This federal contract opportunity solicitation seeks to replace two floating dock sections and pedestrian gangways at the Pearl Harbor Visitor Center shoreside dock area. The purpose is to extend the life cycle of the dock to 20-30 years and ensure continued safe and stable visitor access to the USS Arizona Memorial, a major destination for over one million annual visitors to Hawaii. The scope of work includes removing two existing concrete dock sections and replacing them with new post-tensioned pre-fabricated sections of approximately the same dimensions, installing new skid resistant and anodized aluminum railings and equipment. Additional requirements are replacing two pedestrian gangways, removing existing guide piles, and installing a new shoreside structural mooring system. The solicitation was issued by the National Park Service National Office within the Department of the Interior.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .