PEPCO_Approved_One_Line.pdf
PDF 2 MB Posted
- Attached to
- Anacostia II WWPS Electrical Updates
- Solicitation number
- 107592
- Issued by
- Prince George's County, Maryland
About this file
Summary
This document comprises engineering drawings and PEPCO approval correspondence for the Anacostia II Wastewater Pumping Station (WWPS) Electrical Upgrades project, a Washington Suburban Sanitary Commission (WSSC) initiative in Capitol Heights, Maryland. The primary deliverables include one-line electrical diagrams (E-101 and E-102) detailing the installation of new 13.8kV metal-clad switchgear with microprocessor-based SEL relays, outdoor pre-engineered electrical (PEE) weatherproof enclosures, dual bus configurations (1200A, 750 MVA capacity each), automatic source transfer controller systems with uninterruptible power supply (UPS) backup, PEPCO revenue metering infrastructure, and associated protection and control systems. The design incorporates connections to PEPCO feeders #15099R and #14102 from Blandensburg and Tuxedo substations respectively, with provisions for future feeder expansion. The sealed bid submission deadline is 2:00 p.m. on Wednesday, July 22, 2026, via the WSSC eProcurement Portal at https://procurement.opengov.com/portal/wsscwater. The project scope encompasses transformer replacement, dual switchgear line upgrades, SCADA system integration, backup battery systems, underground feeders and cables, new electrical structures and foundations, HVAC provisions, stormwater control measures, and temporary power provisions.
PEPCO Substation Engineering approved both one-line diagrams on April 3, 2026, contingent upon noted modifications, including specifications that three current-limiting fuses (rather than two) be furnished by PEPCO and installed by the contractor in the metering cubicle. The approval letter, dated April 22, 2026, from Roslyn Sturdivant (PEPCO Substation Engineering) to Brian Worthington (WSSC Facility Construction Manager), establishes that manufacturer drawings must be submitted for PEPCO review and approval prior to production, and that a Coordination Study and Check List (Appendix B) must be submitted for PEPCO protection review. The drawings reference PEPCO's General Specification for Customer-Owned Metal-Clad Switchgear for Customer Substations (S-MS-019, Revision 0.2) and incorporate coordination with PEPCO for installation and connections of current transformers, voltage transformers, metering cabinets, fuses, and required cables. All electrical symbols, abbreviations, general notes, construction sequence details, elevation specifications, and cable/conduit schedules are cross-referenced to additional engineering drawings (G-005 through G-021 and E-301 through E-613).
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
52 52
7B
N.C.
1200A
4B
52 52
7A4A
14.4kV
120V
SPARE
FROM BLANDENSBURG SUBSTATION
(PEPCO FEEDER #15099R, 3PH, 3W SERVICE)
52-PT12
13.8kV, 1200A, 750 MVA SERVICE ENTRANCE SWITCHGEAR
(3)
(3)
(3)
N.O.
1200A 52-P7
13.8kV OUTDOOR PEE ENCLOSURE
EMH-P1
PEPCO
EMH-P2
PEPCO
EMH-P3
PEPCO
EMH-P4
PEPCO
EMH-P5
PEPCO
EMH-P6
PEPCO
FROM TUXEDO SUBSTATION
(PEPCO FEEDER 14102, 3PH, 4W SERVICE)
EMH-P7
PEPCO
EMH-P8
PEPCO
EMH-P9
PEPCO
EMH-6
5B
14.4kV 120V
(3)
(3)
(3)
5A
PEPCO
METERING
CABINET
45kVA
CPT-1
150A
(3)
(3)
1A 120V
LINE VT-1
14.4kV
(3) (3)
(3) 10B
120V
LINE VT-2
14.4kV
(3)(3)
51N51
27 59
(3)
600/5 MR
86P1 86P2
TRIP AND LOCKOUT
FOR ALL FUNCTIONS
EXCEPT 27, 59
TRIP AND LOCKOUT
FOR ALL FUNCTIONS
EXCEPT 27, 59
TRIP
FUNCTIONS
27, 59
TRIP
FUNCTIONS
27, 59
(3)
TS TS TSTS
TS
5150 51N
86P5
TS
(3) 1200/5
(3) (3)
(3) 1200/5
1200/51200/5
1200/5 1200/5
(3) (3)
(3)
PEPCO
CUBICLE
14.4kV
5150 51N
86P6
51 51N
86P7
TS
E
TS
TS
PEPCO
METERING
CABINET
(3)600/5 MR
(3)600/5
MR
CHH-1
TS
TS
600/5
MR
(TYP.)
(TYP.)
BUS 1 - 1200A, 750MVA,
3Ø, 3W, 13.8kV
208/120V
MMMM
MM
MM MM
6 6
6 6
PB1
PB1
1A 6B
BUS 2 - 1200A, 750MVA,
3Ø, 3W, 13.8kV
PB2
PB2
PANEL
AC-CPT-P12
C E-103
TS
TS TS
D E-103
PARTITION
PULLBOX PB-1
ARMS ARMS
K1
K1
45kVA
CPT-2
150A (3)K2
K2
ARMS
(3) 1200/56
SPARE
ATS-CPT-P12
208V, 150A, 3P
FO
R
C O
N
TI
N U
AT
IO
N , S
EE
D
R
AW
IN
G
E -1
N.O.
1200A
52-PT23
10A
1200/5
(3)
5 1200/5
(3)
SEL 487B
14.4kV/120V VT
(3)(3) 14.4kV/120V VT
(2) (2)
8A
8 P-RTAC
PEPCO
CUBICLE
SEL 751 SEL 751
SEL 851 SEL 851 SEL 851
SEL 487B
(L-G)
9B
6D5D
(L-G)
(L-G)
2A 3A
TRANSITION
83 8383
UPS
1B
K5 9
9 9
50N50
51N51
27 59
50N50
TS TS
52-P1 1200A, N.O.
TS
14.4kV 208/120V
TS
52-P2 1200A N.C.
52-P5 1200A
N.O.
52-P6 1200A
N.C.
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TO S-RTAC IN 4.16kV OUTDOOR PEE
ENCLOSURE, SEE DWGS E-103 AND EC-101
P002 P058
P051 P052
P001
TO HMI IN P-RBCC
P004
TO HMI IN P-RBCC
10 P005
P008
(3)600/5
ARMS
(3) 600/5 MR
CT-P1
BUS
VT-1
BUS
VT-2
CT-P2
27X 59X 27X59X
11 11
P117
86/P6 86/T5
L N1 N2
C010
C009
11A
(2)
(3)
SPLICE EX 13.8kV PEPCO FEEDERS WITH NEW FEEDERS TO ENERGIZE NEW SWGR FROM 13.8 kV
FEEDERS #15099R AND #14102 IN MANHOLES
EMH-P5 AND EMH-P6 RESPECTIVELY.
PROVIDE OUTDOOR PRE-ENGINEERED
ELECTRICAL (PEE) WEATHERPROOF ENCLOSURE
WITH SINGLE AISLE WALK-IN TYPE 13.8kV
METAL-CLAD SWITCHGEAR IN TWO HIGH
ARRANGEMENT AND MICROPROCESSOR BASED
SEL RELAYS.
PROVIDE 15kV STATION CLASS POLYMER
LIGHTNING ARRESTERS.
PROVIDE DETECT GLOW TUBE TYPE "RS", 1 PER
PHASE.
DRAWING NOTES:
CONTRACT:
DATE REVISIONS
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IN
G
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
PA
TH
C
:\U se rs \A lk a\
Sh ah a nd a ss oc ia te s\
M
AR
S Pr oj ec ts
D oc um en ts \W
SS
C
_A N
AC
O
ST
IA
II
_T
.O
#6 -J
1F
\D R
AW
IN
G S\
E-
1.
dw g
DRAWN:
CHECKED:
DESIGN:
NO
OF 148
WASHINGTON SUBURBAN SANITARY COMMISSION
THESE DOCUMENTS CONTAIN PRIVILEGED
AND CONFIDENTIAL INFORMATION WHICH
SHALL NOT BE REDISTRIBUTED WITHOUT
PRIOR WSSC APPROVAL
PROFESSIONAL
CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE
STATE OF MARYLAND.
LICENSE NO.: 36677
EXPIRATION DATE: 01-02-2028
April 3, 2026 - PLOT DATE
CP6901A20
BID READY DESIGN SUBMISSION
WSSC
DELIVERING THE ESSENTIAL
ANACOSTIA II WWPS
ELECTRICAL UPGRADES
416 NORTH FREDERICK AVENUE, GAITHERSBURG, MARYLAND 20877 (301) 926-2797
SHAH & ASSOCIATES
POWERING INNOVATIVE SOLUTIONS
02/09/2026
HFM 12/31/2025
DMG 12/31/2025
VGS 12/31/2025
MAIN SUBSTATION
PRIMARY 13.8kV SWITCHGEAR
ONE-LINE DIAGRAM I
E-101
SCALE: NOT TO SCALE
FOR ELECTRICAL SYMBOLS AND
ABBREVIATIONS, SEE DWGS G-005 AND G-006.
FOR ELECTRICAL GENERAL NOTES, SEE DWG
E-001.
FOR SEQUENCE OF CONSTRUCTION, SEE
DWGS G-008 THRU G-021.
FOR 13.8kV SWITCHGEAR ELEVATIONS, SEE
DWGS E-301 AND E-302.
FOR CABLE AND CONDUIT SCHEDULE, SEE
DWGS E-607 THRU E-613.
1.
NOTES:
2.
3.
4.
MAIN SUBSTATION PRIMARY 13.8kV SWITCHGEAR ONE-LINE DIAGRAM I
ELECTRICALLY OPERATED INTERLOCK SHALL PREVENT
PARALLELING OF UTILITY FEEDERS.
EACH CT SHALL BE WIRED INDIVIDUALLY TO 87 RELAY.
PARALLEL CONNECTIONS ARE NOT PERMITTED.
PROVIDE AUTOMATIC SOURCE TRANSFER CONTROLLER
SYSTEM WITH UPS CONTROL POWER BACKUP TO OPERATE
THE PRIMARY 13.8kV SWITCHGEAR MAIN AND TIE BREAKERS.
PROVIDE ATS AND ASSOCIATED AC PANEL IN THE PRIMARY
13.8kV SWITCHGEAR PEE ENCLOSURE AS SHOWN.
PROVIDE KIRK KEY INTERLOCK AS SHOWN. SEE DWG E-105
FOR DETAILS.
DRAWING NOTES (CONTINUED):
PEPCO REVENUE METERING. PEPCO IS RESPONSIBLE FOR
SUPPLYING VTS, CTS AND METERING CABINET. CONTRACTOR IS
RESPONSIBLE FOR COORDINATING WITH PEPCO FOR
INSTALLATION AND CONNECTIONS OF THE CTS AND VTS AND
METERING CABINET INCLUDING FUSES AND CABLES REQUIRED
FOR CONNECTIONS TO THE PEPCO METERING CABINET.
CONFIGURATION OF VTS AS PER PEPCO STANDARDS:
ON 3-PHASE, 3-WIRE, 60HZ SYSTEM, PEPCO WILL FURNISH TWO
GE-TYPE JMV VOLTAGE TRANSFORMERS OR EQUIVALENT RATED
14,400/120V, 60HZ WITHOUT FUSES. ON 3-PHASE, 4-WIRE, 60HZ
SYSTEM, PEPCO WILL FURNISH THREE GE-TYPE JMV VOLTAGE
TRANSFORMERS OR EQUIVALENT RATED 14,400/120VOLTS, 60HZ
WITHOUT FUSES.
DRAWING NOTES (CONTINUED):
5.
ARMS FUNCTIONALITY IS DESIGNED BASED ON NORMAL SYSTEM
CONFIGURATION.
ARMS IN MAIN BREAKERS ACTIVATED BY DOWNSTREAM.
PROVIDE 10KV STATION CLASS POLYMER LIGHTING ARRESTERS.
DRAWING NOTES (CONTINUED):
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text G
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
E989011 Line
E989011 Text Box
E989011 Image
EMH-5 CHH-2
FO
R
C O
N
TI
N U
AT
IO
N , S
EE
D
R
AW
IN
G
E -1
N.C.
1200A
16B
14A
16A
14.4kV 120V
SPARE
52-P3
52-PT34
13.8kV, 1200A, 750 MVA SERVICE ENTRANCE SWITCHGEAR
(3)
(3)
(3)
BUS 4 - 750 MVA,
3Ø, 3W, 13.8kV
BUS 3 - 750 MVA,
3Ø, 3W, 13.8kV
13.8kV OUTDOOR PEE ENCLOSURE
FROM BLADENSBURG SUBSTATION (PEPCO
FEEDER #15098R, 3PH, 3W SERVICE)
FUTURE PEPCO
FEEDER, 3PH, 3W SERVICE
VA
C
U U
M V
ER
IF
IC
AT
IO
N
C U
BI
C
LE
G R
O U
N D
T
ES
TI
N G
D
EV
IC
E
(U
PP
ER
G R
O U
N D
T
ES
TI
N G
D
EV
IC
E
(L O
W
ER
21A20A
20B
19A
15A
SPARE
225A (3)
19A 120V
LINE VT-4
14.4kV
(3) (3)
(3)14B 120V
LINE
VT-3
14.4kV
(3) (3)
(3)
(3)
600/5 MR
600/5 MR
86P486P3
TRIP AND
LOCKOUT FOR
ALL FUNCTIONS
EXCEPT 27, 59
TRIP AND
LOCKOUT FOR
ALL FUNCTIONS
EXCEPT 27, 59
TRIP
FUNCTIONS
27, 59
TRIP
FUNCTIONS
27, 59
TSTS
TS TS
51N 51
51 5051N
86P9
(3)1200/5
(3) 1200/5
1200/51200/5
86P10
TS
TS
PEPCO
METERING
CABINET
TS
600/5
MR
EMH-P1
PEPCO
EMH-P2
PEPCO
EMH-P3
PEPCO
EMH-P4
PEPCO
EMH-P5
PEPCO
(TYP.)
(TYP.)
45kVA CPT-4 14.4kV
208/120V
MM MM1200A
N.O.
MM
51 5051N
600/5
MR
MM
TS
PB3
PB3
15B
PB4
PB4
TS
B E-103
A E-103
PARTITION
PULLBOX PB-2
TS
ARMSARMS
(3)K4
K4225A (3)
45kVA CPT-3 14.4kV
208/120V
(3)K3
K3
ATS-CPT-P34
208V, 150A, 3P6
PANEL
AC-CPT-P346
SEL 751
SEL 751
SEL 851 SEL 851
14.4kV/120V VT
(3)(2)
12A
PEPCO
CUBICLE
14.4kV/120V VT
(3) (2)
18A
PEPCO
CUBICLE
SEL 487B SEL 487B
(3)(3)
(3)
(3)
19B
15D
13B
17A
TRANSITION
11B
14.4kV 120V
(3)
(3)
(3)
TS
1200/5
51 51N50
86P8
600/5
MR
MM
10B
TS
ARMS
SEL 851
(3)
(3)
83 83
K7
8 8
50N 50
51N 51
50N 50
TS
TS TS
TS
52-P4 1200A, N.C.
52-P8 1200A N.O.
TS
TS
52-P9 1200A
N.C.
52-P10 1200A
N.O.
TS
TS TS
TS
TS TS
TS TS
TS
TS
TO HMI IN P-RBCCTO HMI IN P-RBCC
P053 P054
P003
P057
P006
50N
50N 50N
P009
P007
(3) 600/5
P118
CT-P3
BUS
VT-3 BUS
VT-4
CT-P4 L-G
PEPCO
METERING
CABINET
(FUTURE FDR)
27X 59X 27X 59X
ARMS
1200/5
(3) 5
1200/5 (3)
86/P9 86/T8
L N2N1
(2)(2)
SPLICE EX 13.8kV PEPCO FEEDERS WITH NEW
FEEDERS TO ENERGIZE NEW SWGR FROM
13.8kV FEEDERS #15098R IN MANHOLE EMH-P5.
PROVIDE 15kV STATION CLASS POLYMER
LIGHTNING ARRESTERS.
PROVIDE DETECT GLOW TUBE TYPE "RS", 1 PER
PHASE.
ELECTRICALLY OPERATED INTERLOCK SHALL
PREVENT PARALLELING OF UTILITY FEEDERS.
EACH CT SHALL BE WIRED INDIVIDUALLY TO 87
RELAY. PARALLEL CONNECTIONS ARE NOT
PERMITTED.
PROVIDE ATS AND ASSOCIATED AC PANEL IN
THE PRIMARY 13.8kV PEE ENCLOSURE AS
SHOWN.
MOUNTING PROVISIONS FOR UTILITY CTs AND
FIXED MOUNTED VT.
DRAWING NOTES:
HFM 12/31/2025
DMG 12/31/2025
VGS 12/31/2025
MAIN SUBSTATION
PRIMARY 13.8kV SWITCHGEAR
ONE-LINE DIAGRAM II
E-102
1. FOR ELECTRICAL SYMBOLS AND ABBREVIATIONS,
SEE DWGS G-005 AND G-006.
2. FOR ELECTRICAL GENERAL NOTES, SEE DWG
E-001.
3. FOR SEQUENCE OF CONSTRUCTION, SEE DWGS
G-008 THRU G-021.
4. FOR 13.8kV SWITCHGEAR ELEVATION, SEE DWGS
E-301 AND E-302.
5. FOR CABLE AND CONDUIT SCHEDULE, SEE DWGS
E-607 THRU E-613.
NOTES:
CONTRACT:
DATE REVISIONS
VE
R
IF
Y
SC
AL
E
- B
AR
IS
O N
E
IN
C H
O N
O R
IG
IN
AL
D
R
AW
IN
G
IF
N
O T
O N
E
IN
C H
O N
T H
IS
S
H
EE
T, A
D
JU
ST
S
C
AL
ES
A
C C
O R
D
IN
G
LY
PA
TH
C
:\U se rs \A lk a\
Sh ah a nd a ss oc ia te s\
M
AR
S Pr oj ec ts
D oc um en ts \W
SS
C
_A N
AC
O
ST
IA
II
_T
.O
#6 -J
1F
\D R
AW
IN
G S\
E-
2.
dw g
DRAWN:
CHECKED:
DESIGN:
NO
OF 148
WASHINGTON SUBURBAN SANITARY COMMISSION
THESE DOCUMENTS CONTAIN PRIVILEGED
AND CONFIDENTIAL INFORMATION WHICH
SHALL NOT BE REDISTRIBUTED WITHOUT
PRIOR WSSC APPROVAL
PROFESSIONAL
CERTIFICATION
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM A
DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE
STATE OF MARYLAND.
LICENSE NO.: 36677
EXPIRATION DATE: 01-02-2028
April 3, 2026 - PLOT DATE
CP6901A20
BID READY DESIGN SUBMISSION
WSSC
DELIVERING THE ESSENTIAL
ANACOSTIA II WWPS
ELECTRICAL UPGRADES
416 NORTH FREDERICK AVENUE, GAITHERSBURG, MARYLAND 20877 (301) 926-2797
SHAH & ASSOCIATES
POWERING INNOVATIVE SOLUTIONS
02/09/2026
SCALE: NOT TO SCALE
MAIN SUBSTATION PRIMARY 13.8kV SWITCHGEAR ONE-LINE DIAGRAM II
PROVIDE KIRK KEY INTERLOCK AS SHOWN. SEE DWG E-104 FOR
DETAILS.
PROVIDE OUTDOOR PRE-ENGINEERED ELECTRICAL PEE
WEATHERPROOF ENCLOSURE WITH SINGLE AISLE WALK-IN
TYPE 13.8kV METAL-CLAD SWITCHGEAR IN TWO HIGH
ARRANGEMENT AND MICROPROCESSOR BASED SEL RELAYS.
DRAWING NOTES (CONTINUED):
PEPCO REVENUE METERING. PEPCO IS RESPONSIBLE FOR SUPPLYING VTS, CTS AND
METERING CABINET. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH PEPCO
FOR INSTALLATION AND CONNECTIONS OF THE CTS AND VTS AND METERING CABINET
INCLUDING FUSES AND CABLES REQUIRED FOR CONNECTIONS TO THE PEPCO
METERING CABINET. CONFIGURATION OF VTS AS PER PEPCO STANDARDS:
ON 3-PHASE, 3-WIRE, 60HZ SYSTEM, PEPCO WILL FURNISH TWO GE-TYPE JMV VOLTAGE
TRANSFORMERS OR EQUIVALENT RATED 14,400/120V, 60HZ WITHOUT FUSES. ON
3-PHASE, 4-WIRE, 60HZ SYSTEM, PEPCO WILL FURNISH THREE GE-TYPE JMV VOLTAGE
TRANSFORMERS OR EQUIVALENT RATED 14,400/120VOLTS, 60HZ WITHOUT FUSES.
DRAWING NOTES (CONTINUED):
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text Y
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text B
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text G
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text V
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
E989011 Image
Apil 22, 2026
BRIAN WORTHINGTON
Facility Construction Manager
Facility Design and Construction Division
Subject: CVC-620 - WSSC Anacostia II Wastewater Pumping Station (WWPS)
2100 Kenilworth Avenue, Capitol Heights, MD 20743
Substation Engineering has reviewed the electrical drawings submitted for new switchgear installation. The drawings were submitted to us for our review and approval. Reference where appropriate is made to Pepco’s General Specification for Customer-Owned Metal-Clad Switchgear for Customer Substations", S-MS-019, Revision 0.2. Substation Engineering offers the following comments.
Drawing MAIN SUBSTATION PRIMARY 13.8kV SWITCHGEAR ONE-LINE DIAGRAM I
1. In the metering cubicle, three (not two) current limiting fuses shall be furnished by Pepco and installed by the
Customer.
Drawing MAIN SUBSTATION PRIMARY 13.8kV SWITCHGEAR ONE-LINE DIAGRAM II
2. No comments.
General Note to Reference:
These comments are based on all preliminary information available at this submittal. Further comments may be warranted when additional details are provided.
3. Manufacturer drawings shall be submitted for Pepco review and approval. It is recommended that the Customer waits until they have approved manufacturer drawings from Pepco before proceeding with production.
4. Coordination Study and Check List (Appendix B) shall be submitted for Pepco Protection review and approval.
The following drawings are stamped “Approved – Except as Noted”:
Drawing MAIN SUBSTATION PRIMARY 13.8kV SWITCHGEAR ONE-LINE DIAGRAM I Drawing MAIN SUBSTATION PRIMARY 13.8kV SWITCHGEAR ONE-LINE DIAGRAM II
If you need further assistance or have any questions. Please feel free to contact me. I am happy to assist.
Thank you, Roslyn Sturdivant
3400 Benning Rd NE | Washington, DC 20019
O: 202-428-1233 rsturdivant@pepco.com | www.pepco.com
Roslyn Sturdivant
| ANACOSTIA II WWPS ELECTRICAL UPGRADES _ ONE-LINE DIAGRAMS 04.03.26. |
| CVC-620 - WSSC Anacostia II Wastewater Pumping Station One-Line Memo Approved |
File details come from the government source that posted it. Updated .