This document is a set of Questions and Clarifications related to RFQ 449156 for the NSLS-II SMI Beamline Sample Motions Assembly. The key details are:
The RFQ requires the contractor to provide a new motion system that must mate to legacy electrical vacuum feedthroughs and air-side cabling for the customer's controls system. Specifically, the motor and encoder connectors must use the pinout and configuration defined in Section 7.5, Table 6 of the Specification document, rather than the contractor's standard 9-pin DSUB connectors. This is a mandatory requirement to ensure compatibility with the existing infrastructure. The proposal due date is August 14, 2024. The solicitation is being issued by the Department of Energy Office of Science for Brookhaven National Laboratory.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 449156
NSLS-II SMI Beamline Sample Motions Assembly
Questions and Clarifications
July 19, 2024
Question 1:
Attachment (B4)
• Motor connector is defined in 3.3.3.6 which has motor wires in its own connector.
o It does define a unique connector. Is that mandatory?
o We typically use 9-pin DSUBS. Would that be OK?
▪ This allows for direct connection with our standard Kapton cables.
• Absolute encoder connector is defined in 3.5.1.3 (Table 12) which as all encoder wires in its own 9-pin DSUB connector.
Attachment (B)
• Section 7.5, Table 6. Defines both motor and encoder wires into one 15-pin DSUB connector.
o This is typically not advised but can be done.
Response 1:
We do need the motor/encoder to have the connector and pinout specified in the Specification document (Section 7.5, Table 6). The new motion system needs to mate to legacy electrical vacuum feedthroughs and air-side cabling for our controls system.