Pace Analytical Responsibility Documentation.pdf

PDF 2 MB Posted

Attached to
Master Agreement AZ|CTR061676
Contract number
CTR061676
Issued by
Arizona

About this file

This document is a Request for Proposals (RFP) #BPM004422 for Statewide Environmental Laboratory Services issued by the Arizona Department of Environmental Quality (ADEQ). The RFP includes multiple Past Performance Questionnaires for Environmental Science Corporation, doing business as Pace Analytical National. The reference checks were completed by three different professionals: Jeremy Gniffke from Matrix New World Engineering, Lori Zito from APS, and Gary A. Bender from Bender Environmental Consulting, Inc.

The questionnaires evaluate Pace Analytical's performance across multiple criteria including quality of work, project completion time, budget adherence, and responsiveness. Across all three reference checks, the company received consistently high ratings, with most scores ranging between 5-6 on a 0-6 scale. All references indicated they would be willing to contract with the company again and praised their work quality, data delivery, and problem-solving capabilities. The RFP appears to be part of a competitive solicitation process for environmental laboratory services, with the goal of selecting a contractor to provide comprehensive scientific testing and analysis services for the state of Arizona.

View the file

Other files

File Type Posted
Attachment_-_ADEQ_Audit_Report.docx DOCX document
Attachment_-_AZ_Certification-PACE.pdf PDF
Attachment_-_Organizational_Chart.pdf PDF
BPM004422 Solicitation Attachments - REQUIRED OFFEROR FORMS.docx DOCX document
BPM004422 Solicitation Scope of Work Exhibits.pdf PDF
BPM004422_-_Environmental_Laboratory_Services_Desk_Aid.pdf PDF
CTR061676_Pace_Pricing_Sheet_Rev_05-08-2024.xls XLS spreadsheet
Eurofins Responsibility Documentation.pdf PDF
2023-08-23 Pace Analytical Services GAUWP End.pdf PDF
2023-08-23 Pace Analytical Services GAUWP.pdf PDF
2024-08-01 Pace GAUWP.pdf PDF
2025-08-01 Pace Analytical GAUWP.pdf PDF
Attachment_-_Company_Profile.pdf PDF
BPM004422 Consensus Evaluation Report.pdf PDF
BPM004422 Solicitation Requirements.pdf PDF
BPM004422_Pricing_Sheet Initial.xlsx XLSX spreadsheet
CTR061676_Amendment_1_Signed.pdf PDF
CTR061676_Pace_Pricing_Sheet_BAFO_7-14-2022.xls XLS spreadsheet
CTR061676__Amendment_3_-_Contract_Extension.pdf PDF
Pace Clarification Response Pace Cont 1.pdf PDF
Pace Clarification Response.pdf PDF
Attachments_for_Submittal.pdf PDF
BPM004422 Determination of Award.pdf PDF
BPM004422 Pricing Sheet.xlsx XLSX spreadsheet
CTR061676 Pace Offer and Acceptance Page.pdf PDF
Attachment_-_PT_Studies-PACE.pdf PDF
Attachment_-_Supplement_Insurance.PDF PDF
BPM004422 Solicitation Instructions.pdf PDF
CTR061676 Pace Pricing_Sheet BAFO 7-14-2022.xls XLS spreadsheet
CTR061676__Amendment_2_-_Contract_Extension.pdf PDF
Legend Responsibility Documentation.pdf PDF
Pace Clarification Response Cont 2.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS (RFP) # BPM004422

ADEQ Project: Statewide Environmental Laboratory Services

Past Performance Questionnaire Offeror: Environmental Science Corp DBA Pace Analytical National

Please email the completed Past Performance Questionnaire to:

Machiche.Ana@azdeq.gov

Reference Check provided by (Insert Company Name, Individual, Title): Jeremy Gniffke, Matrix New World Engineering, Senior Project Hydrogeologist

On a scale of 0 to 6 (0 being the lowest & 6 being the highest) how would you rate this Contractor’s performance on the following areas. Please provide comments as well.

How would you describe and rate the quality of work performed by this Contractor on your project?

Please provide rating from 0 to 6: 6

Was the project performed by this Contractor completed on time?

Was the project completed within budget?

Please describe the quality of deliverable(s) submitted:

Pease provide rating from 0 to 6: 6 mailto:Machiche.Ana@azdeq.gov

Did the Contractor provide adequate training and documentation so that what they implemented was sustainable?

Was Contractor’s staff responsive to solving any problems that may have occurred on your project?

Would you be willing to contract with this Contractor again? yes

To the Arizona Department of Environmental Quality: The undersigned has certified all information contained in the Past Performance Questionnaire is current and factual.

Jeremy Gniffke Name

Senior Project Hydrogeologist Title

Signature

6/22/22 Date

Past Performance Questionnaire Offeror: Environmental Science Corp DBA Pace Analytical National

Reference Check provided by (Insert Company Name, Individual, Title): Lori Zito, APS

No issues with quality.

Please provide rating from 0 to 6: 5-6

Was the project performed by this Contractor completed on time? There have been some minor issues with COVID, but we need to plan our work. Historically, when there has been a need, PACE has performed.

Please provide rating from 0 to 6: 5- 6

Please describe the quality of deliverable(s) submitted: They deliver the data packages we request.

sustainable? NA

Pease provide rating from 0 to 6:

Our project manager has been responsive to our needs.

Would you be willing to contract with this Contractor again? Yes

Lori Zito

Consultant Title

LZ

Signature

6/28/22

Past Performance Questionnaire Offeror: Environmental Science Corp DBA Pace Analytical National

Reference Check provided by (Insert Company Name, Individual, Title):

Gary A. Bender, R.G.

BEC VP, Sr. Geologist

Bender Environmental Consulting, Inc.

1929 E. Myrna Lane Tempe, AZ 85284 480 345-2448 602 329-8154 (cell)

Was the project performed by this Contractor completed on time?

Please provide rating from 0 to 6: 5

Please describe the quality of deliverable(s) submitted:

sustainable?

Pease provide rating from 0 to 6: NA

Would you be willing to contract with this Contractor again? 6

Gary A. Bender, R.G.

V.P.

Title

Gary Bender Signature

6/29/22

File details come from the government source that posted it. Updated .