General Requirements for Contractors on Alcatraz Island

View the file

Other files for this federal contract opportunity

Other files attached to ALCA Install Plumbing and Fire Sprinkler Qtr Maste, newest first.
File Type Posted
Sol_P16PS00600_Amd_000004.pdf PDF
GOGA_173769_Contractor_Bidwalk_RFIs_Final.pdf PDF
GOGA_173769_Appendix_-_Alca_Roadway_Chase_Cover_Dwg.pdf PDF
Footing_Sleeve_Photos.pdf PDF
GOGA_173769_Contractor_Bidwalk_RFIs.pdf PDF
Sol_P16PS00600_Amd_000003.pdf PDF
2014_07_03_Alcatraz_Quartermaster_Drawings_100__CDs 1 .pdf PDF
Fire_Life_Safety_Contractor_List_Addendum.pdf PDF
Existing_condition_photos_in_chase_from_WT_to_QMW.pdf PDF
Sol_P16PS00600_Amd_000002.pdf PDF
2016_04_07_Prebid_Walkthrough_Summary.pdf PDF
2016_04_07_Attendee_Sign_In_Sheet.pdf PDF
List_of_Fire_Life_Safety_Contractors.pdf PDF
Relevant_Prior_Experience.docx DOCX document
Sol_P16PS00600_Amd_000001.pdf PDF
Key_Personnel_Qualifications.docx DOCX document
Subcontractor_Reference.docx DOCX document
Key_Personnel_Qualifications.docx DOCX document
er_Taxi_Schedule_Entry_Instructions_2015_12_04.pdf PDF
Subcontractor_Reference.docx DOCX document
SOP_609_Vehicle_Use_on_Alcatraz.pdf PDF
AQMW_Fire_Suppression_0515_3_Full_Set_FINAL.pdf PDF
Relevant_Prior_Experience.docx DOCX document
SF_24_Bid_Bond.pdf PDF
MW_Fire_Suppression_0515_2_Specification_FINAL.pdf PDF
Fire_Supply_Line_Existing_Conditions_Background.pdf PDF
DB_WD_CA160029_3-18-2016_CA29.pdf PDF
P16PS00600_Price_Schedule.xls XLS spreadsheet
AQMW_Plumbing_160117_Alcatraz_Civil_FINAL.pdf PDF
MATERIALS_TRANSPORATION_AGREEMENT_(REV_1.1.16_OTHER).pdf PDF
Sol_P16PS00600.pdf PDF
Original_FP_Dwgs_2000.pdf PDF
General_References.docx DOCX document
P16PS00600_Clause_Document.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Plumbing_and_Fire_Suppression_Division_1_Specifications.pdf PDF
2015_Low_Season_Schedule-FINAL.pdf PDF
AQMW_FireSuppressionNarrative_IL_R1.pdf PDF
AQMW_Plumbing_Scope_Description_FINAL_1.pdf PDF
P15PS01955_Pre-sol.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL REQUIREMENTS FOR CONTRACTORS ON ALCATRAZ ISLAND, NATIONAL HISTORIC

LANDMARK DISTRICT

• Parking at Alcatraz Landing o Contractor parking at Pier 33½ is not permitted. Parking areas nearby the Pier can be found on the concession website: http://www.alcatrazcruises.com/website/pyt-parking.aspx o For bringing supplies and equipment/crew to Alcatraz, the contractor should arrive early at Pier 33½, drive in and unload supplies and equipment, move the vehicle to a nearby parking lot, park there and walk back to the Pier to load the boat.

o Photo identification and “contractor badge” is required for passage on any ferry/barge/water taxi.

• Equipment/Supply Transport via the LCM- 8 (Landing Craft Medium Version 8) - “Solitary” o All cargo loads must be arranged directly with Paul Bishop (cell #415.559.3101, pbishop@alcatrazcruises.com) and Aaron Warren (Cell #415.559.3126, awarren@alcatrazcruises.com) from Alcatraz Island Service (AIS) by email at least 48 hours in advance. No exceptions.

o The LCM-8 leaves pier 33 at 0700 daily. There is usually a second run to Alcatraz in the afternoon and at the scheduling discretion of the port captain and NPS Project Manager.

o There is no contractor passenger service on the LCM 8.

o There is a 6000lb limit to the crane on the LCM 8. Pallets or self supporting loads

(i.e. tanks) only.

o There is a minimum $50 charge per crane pick. Extra charge for rigging or crew time is at the discretion of the port captain.

o Flammables and haz mats are allowed on the LCM-8 only with the expressed permission of the port captain and must be accompanied at all times.

o All loads must be delivered to Pier 33 on the day of delivery to Alcatraz and picked up immediately at Pier 33 after delivery from Alcatraz- there are no dockside storage facilities.

• By the Staff and Public Ferries (large capacity, passenger carrying boat) o “Staff Ferry” leaves Pier 33 ½ at 0820daily. Arrive at 0800 to load. Wheel barrow sized loads maximum on this boat. Care will be taken to prevent spilling or marking of the floor covering of the newly refurbished boats. All cargo will be placed either on a designated tarp, on a non-carpeted area or in improved containers/bins designated as appropriate for loose material.

o “Public Ferries” have a seasonal schedule that may be accessed on the AIS website, www.alcatrazcruises.com o Hand carried loads only on public ferries.

GOLDEN GATE

NATIONAL RECREATION AREA

Fort Mason, Bldg 201 San Francisco, CA 94123

National Park Service U.S. Department of the Interior http://www.alcatrazcruises.com/website/pyt-parking.aspx http://www.alcatrazcruises.com/website/pyt-parking.aspx o There are no flammables or haz mats allowed on the staff or public ferries under any circumstances.

o Ferries can be chartered for off-hour runs at a minimum of $300 per run. All charters must be arranged directly with Paul Bishop or Aaron Warren from Alcatraz Island Service (AIS) by email at least a week in advance. No exceptions.

• Parks Conservancy Barge:

o Rather than use the concession for supplies and equipment, the contractor may use the regularly scheduled Parks Conservancy barge. Crew may not travel to Alcatraz by barge. For use of the Parks Conservancy barge for equipment and supplies, the contractor shall provide a schedule of delivery, installation dates and a manifest of delivery items to the NPS Project Manager for the purposes of coordinating the transportation and staging of contractor supplies and equipment at least one (1) week in advance to any barge departure date.

o Please note that space on the barge is limited and use of the barge is at the discretion of Patrick McAllister of the Parks Conservancy at 415-561-4923.

Scheduled departure times and dates cannot be manipulated by the contractor. The contractor will be charged for their individual lifts and are responsible for coordinating directly with for Rich Smith at Westar Marine Services, 415-495-3191 regarding billing and payment for services rendered.

• Contractor hired barge and water taxis/Misc:

o Westar Marine has dock and barge crane authorization for Alcatraz Island. Off Hour water taxi service and barge deliveries are available. Information at http://westarmarineservices.com/ o Use of Alcatraz roadways by contractors is regulated. Contractors must use their own forklift or vehicles for transportation. Fueling for vehicles brought to Alcatraz is regulated. The government has gasoline and propane suppliers that the Contractor may contact for project related supplies.

o All unused materials and supplies must be taken off the island, no exceptions.

o Any deliveries to Alcatraz must be moved directly to staging areas. Alcatraz dock does not have storage areas.

o Any unauthorized deliveries to Alcatraz will be removed immediately and resulting costs will be charged to the responsible party.