MATERIALS_TRANSPORATION_AGREEMENT_(REV_1.1.16_OTHER).pdf

PDF 105 KB Posted

Attached to
ALCA Install Plumbing and Fire Sprinkler Qtr Maste Federal contract opportunity
Solicitation number
P16PS00600
Issued by
Department of the Interior National Park Service

About this file

Materials Transportation Agreement

View the file

Other files for this federal contract opportunity

Other files attached to ALCA Install Plumbing and Fire Sprinkler Qtr Maste, newest first.
File Type Posted
Sol_P16PS00600_Amd_000004.pdf PDF
GOGA_173769_Contractor_Bidwalk_RFIs_Final.pdf PDF
GOGA_173769_Appendix_-_Alca_Roadway_Chase_Cover_Dwg.pdf PDF
Footing_Sleeve_Photos.pdf PDF
GOGA_173769_Contractor_Bidwalk_RFIs.pdf PDF
Sol_P16PS00600_Amd_000003.pdf PDF
2014_07_03_Alcatraz_Quartermaster_Drawings_100__CDs 1 .pdf PDF
Fire_Life_Safety_Contractor_List_Addendum.pdf PDF
Existing_condition_photos_in_chase_from_WT_to_QMW.pdf PDF
Sol_P16PS00600_Amd_000002.pdf PDF
2016_04_07_Prebid_Walkthrough_Summary.pdf PDF
2016_04_07_Attendee_Sign_In_Sheet.pdf PDF
List_of_Fire_Life_Safety_Contractors.pdf PDF
Relevant_Prior_Experience.docx DOCX document
Sol_P16PS00600_Amd_000001.pdf PDF
Key_Personnel_Qualifications.docx DOCX document
Subcontractor_Reference.docx DOCX document
Key_Personnel_Qualifications.docx DOCX document
er_Taxi_Schedule_Entry_Instructions_2015_12_04.pdf PDF
Subcontractor_Reference.docx DOCX document
SOP_609_Vehicle_Use_on_Alcatraz.pdf PDF
AQMW_Fire_Suppression_0515_3_Full_Set_FINAL.pdf PDF
Relevant_Prior_Experience.docx DOCX document
SF_24_Bid_Bond.pdf PDF
MW_Fire_Suppression_0515_2_Specification_FINAL.pdf PDF
Fire_Supply_Line_Existing_Conditions_Background.pdf PDF
DB_WD_CA160029_3-18-2016_CA29.pdf PDF
P16PS00600_Price_Schedule.xls XLS spreadsheet
AQMW_Plumbing_160117_Alcatraz_Civil_FINAL.pdf PDF
Sol_P16PS00600.pdf PDF
Original_FP_Dwgs_2000.pdf PDF
General_References.docx DOCX document
P16PS00600_Clause_Document.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Plumbing_and_Fire_Suppression_Division_1_Specifications.pdf PDF
2015_Low_Season_Schedule-FINAL.pdf PDF
AQMW_FireSuppressionNarrative_IL_R1.pdf PDF
AQMW_Plumbing_Scope_Description_FINAL_1.pdf PDF
tractors_on_Alcatraz_Island _March_2014_Update.pdf PDF
P15PS01955_Pre-sol.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIALS TRANSPORTATION AGREEMENT

Pier 33, Alcatraz Landing No.:

San Francisco, CA 94111

415.559.3126 Date: _______________________________

Fax: 415.986.1721 Email: ac_ops@alcatrazcruises.com AIS Representative: ___________________________________________

ALL INFORMATION REGARDING DELIVERIES AND OTHER REQUESTS MUST BE MADE BY EMAIL IN A

TIMELY MANNER.

Contractor Company Name: ______________________________________ Contractor Contact Name: _________________________________________________

Destination of Material: From ________________________________ To _______________________________________ Time of Delivery: ____________________

Transportation costs from Pier 33 San Francisco to Alcatraz Island.

MV Solitary can carry fewer than 6 passengers. Alcatraz Cruises Ferries are rated up to 700 passengers.

Passenger services: Non-scheduled passenger service for hours outside of regular service. This must be scheduled one day in advance. Hand carried items and hand truck items are allowed. *

*After hours services are subject to double time between 2300-0500. Holiday services are subject to double time.

VESSEL PRICE MINIMUM

MV SOLITARY 62’

3 TON CRANE

WATER AND DIESEL SERVICE

$423.50 PER HOUR

$55.00 per crane pick

Water: $.55 per gallon Diesel: $7.15 per gallon Gasoline: $8.25 per gallon

1 Hour

ALCATRAZ CRUISES FERRY

6 PASSENGERS OF MORE

ROLL ON ROLL OFF SERVICES

$533.50 PER HOUR 1 Hour

Forklift picks when on-loading or off-loading at Pier 33 are subject to a rate of $27.50 per pick.

** After two hours of crane operation an additional cost of $55.00 per quarter hour will be charged

Portable Restrooms and Hand Washing Station: $250 a week plus $75 a week for pumping, cleaning, and maintaining of facilities provided by AIS staff.

SERVICE QUANTITY UNIT PRICE TOTAL COST

TOTAL $

Notes: ________________________________________________________________________________________________________________________________

Contractor Signature: ____________________________________________________________ Date: ___________________________________________

FOR MGMT USE ONLY: Approval Signature: ______________________________________________________________

Revised: 1.1.16 Rates Effective: 2.1.2016

File details come from the government source that posted it. Updated .