Plumbing and Sewer Scope Description
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 2016 Alcatraz Quartermaster Warehouse Rehabilitation Plumbing and Sewer Scope Description
Provide and install a sewer and plumbing system based on Civil Engineering drawings dated 1/19/16 including the materials and labor for the following:
Drawings: C1.0, C2.0 dated 1/19/16 Specification Section: On Plans for C1.0, C2.0
Plumbing portion includes:
1. Furnish and install 1 (one) E/ONE DH152 ejector system as shown on C1.0.
2. Furnish and install the following utilities shown on C1.0:
a. 600’ +/- (Contractor to verify length of run in field) 1-1/4” HDPE SS pipe from ejector system to POC at existing ejector located near the water tower. Include 1 capped T connector for future tie in of treated wastewater line.
b. 600’ +/- (Contractor to verify length of run in field) 1-1/2” PVC Water pipe from the POC at the existing Main Prison Building to the new bathroom at the Quartermaster Warehouse.
3. Type L copper will be used in exposed locations.
Also include the following:
1. Provide and install plumbing systems to sewage ejector pump in basement of Quartermaster Warehouse
2. Fire stopping for plumbing penetrations
3. 1 year warranty unless extended for specific specified items
4. Rigging
5. Layout/supervision
6. Testing/labels
7. Coring
8. Trenching from the site utility chase
9. Work inside the roadway utility trenches including removal and resetting of existing concrete chase covers
10. Plumbing work inside the hillside utility tunnel [Route is from Water Tower to Powerhouse]
11. Piping work shown on C1.0, C2.0
12. Meet prevailing wage labor requirements
13. All necessary installation materials as required by provided drawings, specifications, and/or addenda.
Not to be included in scope:
1. Design on C1.0, C2.0 plans [By Owner’s civil engineer]
2. Fire sprinkler riser drain
3. Fire proofing patch or repair
4. Permits, or fees for permits
5. Hazardous materials abatement
6. Fuel Piping