AQMW_FireSuppressionNarrative_IL_R1.pdf

PDF 438 KB Posted

Attached to
ALCA Install Plumbing and Fire Sprinkler Qtr Maste Federal contract opportunity
Solicitation number
P16PS00600
Issued by
Department of the Interior National Park Service

About this file

Auto. Fire Sprinkler Sys. for QM Warehouse Bldg. at Alcatraz

View the file

Other files for this federal contract opportunity

Other files attached to ALCA Install Plumbing and Fire Sprinkler Qtr Maste, newest first.
File Type Posted
Sol_P16PS00600_Amd_000004.pdf PDF
GOGA_173769_Contractor_Bidwalk_RFIs_Final.pdf PDF
GOGA_173769_Appendix_-_Alca_Roadway_Chase_Cover_Dwg.pdf PDF
Footing_Sleeve_Photos.pdf PDF
GOGA_173769_Contractor_Bidwalk_RFIs.pdf PDF
Sol_P16PS00600_Amd_000003.pdf PDF
2014_07_03_Alcatraz_Quartermaster_Drawings_100__CDs 1 .pdf PDF
Fire_Life_Safety_Contractor_List_Addendum.pdf PDF
Existing_condition_photos_in_chase_from_WT_to_QMW.pdf PDF
Sol_P16PS00600_Amd_000002.pdf PDF
2016_04_07_Prebid_Walkthrough_Summary.pdf PDF
2016_04_07_Attendee_Sign_In_Sheet.pdf PDF
List_of_Fire_Life_Safety_Contractors.pdf PDF
Relevant_Prior_Experience.docx DOCX document
Sol_P16PS00600_Amd_000001.pdf PDF
Key_Personnel_Qualifications.docx DOCX document
Subcontractor_Reference.docx DOCX document
Key_Personnel_Qualifications.docx DOCX document
er_Taxi_Schedule_Entry_Instructions_2015_12_04.pdf PDF
Subcontractor_Reference.docx DOCX document
SOP_609_Vehicle_Use_on_Alcatraz.pdf PDF
AQMW_Fire_Suppression_0515_3_Full_Set_FINAL.pdf PDF
Relevant_Prior_Experience.docx DOCX document
SF_24_Bid_Bond.pdf PDF
MW_Fire_Suppression_0515_2_Specification_FINAL.pdf PDF
Fire_Supply_Line_Existing_Conditions_Background.pdf PDF
DB_WD_CA160029_3-18-2016_CA29.pdf PDF
P16PS00600_Price_Schedule.xls XLS spreadsheet
AQMW_Plumbing_160117_Alcatraz_Civil_FINAL.pdf PDF
MATERIALS_TRANSPORATION_AGREEMENT_(REV_1.1.16_OTHER).pdf PDF
Sol_P16PS00600.pdf PDF
Original_FP_Dwgs_2000.pdf PDF
General_References.docx DOCX document
P16PS00600_Clause_Document.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Plumbing_and_Fire_Suppression_Division_1_Specifications.pdf PDF
2015_Low_Season_Schedule-FINAL.pdf PDF
AQMW_Plumbing_Scope_Description_FINAL_1.pdf PDF
tractors_on_Alcatraz_Island _March_2014_Update.pdf PDF
P15PS01955_Pre-sol.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Automatic Fire Sprinkler System for the Quartermaster Warehouse Building at Alcatraz Island

Automatic Fire Sprinkler Requirements

The Quartermaster Warehouse Building at Alcatraz is proposed to be renovated.

The uses will remain approximately the same and will include storage, maintenance shop area, vehicle parking for the historic fire truck, and vehicle maintenance area.

The preliminary code analysis, based on the applicable 2012 International Building, Fire, Existing Building Codes and the 2013 California Historical Building Code concludes that an automatic fire sprinkler system is necessary based on the following code sections:

California Historical Building Code Chapter 8-1

CHBC 8-102.1.6 Additional work. Qualified historical buildings or properties shall not be subject to additional work required by the regular code, regulation or ordinance beyond that required to complete the work undertaken. Certain exceptions for accessibility and for distinct hazards exist by mandate and may require specific action, within the parameters of the CHBC.

Based on this code section, several distinct hazards are present that would imply that an automatic fire sprinkler system is necessary for the building:

1. Lack of on island fire station at Alcatraz. The lack of a local responding, professional fire department and the resulting delays associated with fire fighting establishes a distinct hazard for the building. In particular, the building houses batteries as part of the electrical supply for the island operations. An uncontrolled fire, with associated fire department delays could impact the battery room and result in an interruption in power for the island. A sprinkler system can protect the battery room from building collapse due to fire or from fire spreading from the storage areas affecting the battery room.

2. The battery room. The battery room is a distinct hazard. If a fire were to start in any portion of the building, it can grow to a significant size before the fire department arrives. In turn, if fire were to spread to the battery room, the chemicals associated with the batteries may create an environmental concern.

2012 International Existing Building Code

703.2.1 Existing Vertical Openings. All existing interior vertical openings connecting two or more floors shall be enclosed with approved assemblies having a fire-resistance rating of not less than 1 hour with approved opening protectives.*

Exceptions:

7. In Group F occupancies, the enclosure shall not be required in the following locations:

7.1 Vertical openings not exceeding three stories

13. Group S occupancies where connecting not more than two floor levels or where connecting not more than three floor levels and the structure is equipped throughout with an approved automatic sprinkler system.

Based on the preceding code section, the proposed unenclosed elevator/lift in the QM

Warehouse creates a need for a fire sprinkler system.

2012 International Building Code, Chapter 9 – Fire Protection Systems

IBC 903.2.9 Group S-1. An automatic sprinkler system shall be provided throughout all buildings containing a Group S-1 occupancy where one of the following conditions exists:

1. A Group S-1 fire area is located more than three stories above grade plane.

Based on the preceding code section, the introduction of storage at the 2 nd floor (which is three stories above grade), could be interpreted to necessitate an automatic fire sprinkler system.

In summary, there is substantial code basis for providing an automatic fire sprinkler system for the Quartermaster Warehouse Project. Moreover, the lack of fire department or professional fire fighting staffing on the island, and the associated potential delays upwards of 20 to 30 minutes for fire fighting operations is a major concern, particularly for a storage and maintenance building. Without early intervention and without a fire sprinkler system, it can be expected that a fire in the Quartermaster Warehouse could overwhelm the responding fire department, resulting in complete loss of the contents and possibility of building collapse. With collapse, the battery room may be lost which would also create significant business and tourist interruption. These additional factors support the need for a wet pipe automatic fire sprinkler system for the structure.

Automatic Fire Sprinkler System: Basis of Design

The proposed wet pipe automatic fire sprinkler system design (system) has been developed in collaboration with the presiding Fire Marshal in accordance with the intent of the codes. The system is designed to protect Ordinary Hazard Group 2 (OH2) occupancies – and is therefore appropriate for office spaces, vehicle storage, rack storage up to 8 feet, and maintenance shops. OH2 systems are typically designed to include sprinklers spaced every 130 square feet. It is expected that the system, designed in accordance with the code, will provide appropriate and effective suppression of a fire with the potential for extinguishment. Automatically activated suppression keeps the fire from growing and spreading and provides time necessary for the fire department to respond to perform final extinguishment if necessary.

The system is designed to draw water from the two existing on-island water tanks. The water tanks, located at higher elevations, have a total volumetric capacity of 21,800 gallons. The code requires that the sprinkler system be fed for a minimum of 60 minutes.

Consequently, flow calculations estimate that a minimum of 18,000 gallons are necessary. Therefore, the two tanks are deemed to provide adequate water supply.

The tanks will feed new underground piping that will be routed in an existing utility trench towards the QM Warehouse building. Some additional trenching will be necessary to reach the building; however, it is reported that such trenching will be provided as part of the current project for other utilities.

The new underground piping will feed a new fire pump proposed at the lowest level of the project inside a new fire pump room. The fire pump is necessary to feed the system such that adequate pressure and flow is provided at the furthest hydraulically demanding area in the system, most likely at the ceiling of Level 2. Suggested locations and arrangement of fire pump room piping including a system riser is shown on the drawings, however these may be modified upon approval for coordination during bid and construction. The fire pump will be provided with a fire pump controller system and a test header for testing and maintenance.

The Fire Marshal indicated that no fire department connection for pumper truck connection is necessary because pumper trucks are not available or expected during fire fighting operations. The lack of a fire department connection is not expected to affect basic sprinkler system effectiveness.

In collaboration with the Fire Marshal the design team has decided to include a hose valve connection for responding fire fighters on the discharge side of the fire pump. This is useful for first responders who may be carrying 1-1/2 hose lines for the purposes of final extinguishment. Because it is not required for the project, a standpipe serving outlets on other floors will not be provided.

Sprinklers will not be provided for the battery room; the code permits certain rooms to omit sprinklers if separated from all other areas by 2-hour fire resistive construction.

Such omissions are restricted to certain types of rooms and must be approved by the authority having jurisdiction. Electrical rooms, such as the battery room, are one of the types of rooms that may omit sprinklers. Therefore, the battery room will not be directly protected by the system; however the system, provided throughout all other areas of the building, will indirectly protect the room by suppressing any fire elsewhere from impacting the building’s structural integrity or spreading to the battery room.