P16PS00600_Price_Schedule.xls

XLS spreadsheet 36 KB Posted

Attached to
ALCA Install Plumbing and Fire Sprinkler Qtr Maste Federal contract opportunity
Solicitation number
P16PS00600
Issued by
Department of the Interior National Park Service

About this file

Contract Price Schedule

View the file

Other files for this federal contract opportunity

Other files attached to ALCA Install Plumbing and Fire Sprinkler Qtr Maste, newest first.
File Type Posted
Sol_P16PS00600_Amd_000004.pdf PDF
GOGA_173769_Contractor_Bidwalk_RFIs_Final.pdf PDF
GOGA_173769_Appendix_-_Alca_Roadway_Chase_Cover_Dwg.pdf PDF
Sol_P16PS00600_Amd_000003.pdf PDF
Footing_Sleeve_Photos.pdf PDF
GOGA_173769_Contractor_Bidwalk_RFIs.pdf PDF
2014_07_03_Alcatraz_Quartermaster_Drawings_100__CDs 1 .pdf PDF
Fire_Life_Safety_Contractor_List_Addendum.pdf PDF
2016_04_07_Prebid_Walkthrough_Summary.pdf PDF
Existing_condition_photos_in_chase_from_WT_to_QMW.pdf PDF
Sol_P16PS00600_Amd_000002.pdf PDF
2016_04_07_Attendee_Sign_In_Sheet.pdf PDF
List_of_Fire_Life_Safety_Contractors.pdf PDF
Relevant_Prior_Experience.docx DOCX document
Sol_P16PS00600_Amd_000001.pdf PDF
Key_Personnel_Qualifications.docx DOCX document
Subcontractor_Reference.docx DOCX document
Key_Personnel_Qualifications.docx DOCX document
er_Taxi_Schedule_Entry_Instructions_2015_12_04.pdf PDF
Subcontractor_Reference.docx DOCX document
SOP_609_Vehicle_Use_on_Alcatraz.pdf PDF
AQMW_Fire_Suppression_0515_3_Full_Set_FINAL.pdf PDF
DB_WD_CA160029_3-18-2016_CA29.pdf PDF
AQMW_Plumbing_160117_Alcatraz_Civil_FINAL.pdf PDF
MATERIALS_TRANSPORATION_AGREEMENT_(REV_1.1.16_OTHER).pdf PDF
Sol_P16PS00600.pdf PDF
Original_FP_Dwgs_2000.pdf PDF
General_References.docx DOCX document
Relevant_Prior_Experience.docx DOCX document
SF_24_Bid_Bond.pdf PDF
MW_Fire_Suppression_0515_2_Specification_FINAL.pdf PDF
Fire_Supply_Line_Existing_Conditions_Background.pdf PDF
P16PS00600_Clause_Document.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
Plumbing_and_Fire_Suppression_Division_1_Specifications.pdf PDF
2015_Low_Season_Schedule-FINAL.pdf PDF
AQMW_FireSuppressionNarrative_IL_R1.pdf PDF
AQMW_Plumbing_Scope_Description_FINAL_1.pdf PDF
tractors_on_Alcatraz_Island _March_2014_Update.pdf PDF
P15PS01955_Pre-sol.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Summary

Solicitation No. P16PS00600
Project: FA-905 Balloon Hangar Hazmat Abatement and Structural StablizationInstall Fire Suppression Sys. and Plumbing Improv. at Quartermaster Warehouse, Alcatraz Island
Park: GOGA
PMIS: 173769
Notice: Refer to FAR clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Submit pricing for base price and any options. Failure to do so may render the proposal unacceptable. On lump sum items, provide total price only; on unit price items, provide the unit price and the extended amount. If no item exists for a portion of the work, include the costs in a related item. In case of error in extension prices, unit governs. In case of errors in summations, the total of the corrected amounts govern. Limit amounts to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the Notice to Proceed. Pricing will be evaluated based on best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgement of the Contracting Officer to offer the best advantage (value) in goods and services for the dollar. Award will be made to one offerer in accordance with the Evaluation Factors for Award, Section M.
Line ItemDescriptionQty/Est. QtyUnitCost/UnitTotal
Base CLINS
Fire Supression System
10Engineering services (shop drawings, cut sheets, flow calcs)1LS
20FW pipe connection from electric shop area to fire pump in QMW400LF
30Fire pump and appurtences1LS
40Interior system build out from fire pump1LS
50Inspections/Commissioning4EA
subtotal
Plumbing Improvements
60Engineering services1LS
70Water line to interior550LF
80Waste line to interior550LF
90Provide and install macerator incl electrical connections1LS
100Inspections4EA
subtotal
Total Cost of Construction

&C&20CONTRACT PRICE SCHEDULE