Att._7_GATE201069C_Final_CD-ContractPriceSchedule-Blank_151019.xls
XLS spreadsheet 33 KB Posted
- Attached to
- GATE 201069C - Building 102 Repairs Federal contract opportunity
- Solicitation number
- P16PS00037
About this file
Attachment 7
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| CONTRACT PRICE SCHEDULE | |||||
| SOLICITATION NUMBER: | |||||
| PARK - PMIS: GATE 201069C | |||||
| DEVELOPED AREA: Sandy Hook | |||||
| PROJECT TITLE: Rehabilitate Building 102 at Sandy Hoook to Seasonal Employee Housing | |||||
| Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government. | |||||
| In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation. | |||||
| CONTRACT LINE ITEM NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE | QUANTITY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 1 | Rehabilitate Building 102 at Sandy Hook to Seasonal Employee Housing | 1 | LS | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 1) ------------------------------------ | $0.00 | ||||
| 2 | ADDITIVE BID OPTION A, Repair Exterior Masonry for Aesthetics | 11700 | SF | $0.00 | |
| 3 | ADDITIVE BID OPTION B, Removal of Miscellaneous Unused Metal Fasteners | 1287 | SF | $0.00 | |
| 4 | ADDITIVE BID OPTION C, Additional Brick Masonry Repointing | 2340 | SF | $0.00 | |
| 5 | ADDITIVE BID OPTION D, Provide Residential Appliances | 1 | LS | $0.00 | |
| 6 | ADDITIVE BID OPTION E, Trash Enclosure Repair | 1 | LS | $0.00 | |
| 7 | ADDITIVE BID OPTION F, Reinstall Historic pressed tin ceilings panels and provide crown moldings in dormitory rooms | 1 | LS | $0.00 | |
| 8 | ADDITIVE BID OPTION G, Lightning Protection | 1 | LS | $0.00 | |
| 9 | ADDITIVE BID OPTION H, Full Roof Replacement (Main Roof and Dormers) | 1 | LS | $0.00 | |
| 10 | ADDITIVE BID OPTION I, Provide Doors at Dormitory Closets | 1 | LS | $0.00 | |
| 11 | BID OPTION J, Not Used | $0.00 | |||
| 12 | ADDITIVE BID OPTION K, Replace Existing Louvers at Chimneys and Dormers | 1 | LS | $0.00 | |
| 13 | ADDITIVE BID OPTION L, Provide insulated flood vents at basement level exterior walls in East Wing | 1 | LS | $0.00 | |
| 14 | ADDITIVE BID OPTION M, Provide Interior Finishes and Standard Light Fixtures | 1 | LS | $0.00 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 2 through 14) ------------------------------------ | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 14) ----------- | $0.00 | ||||
| All measurement and payment information is included in the project specifications, Section 012700. |
&RGATE - 201069C