Amendment_000005_P16PS00037.pdf

PDF 135 KB Posted

Attached to
GATE 201069C - Building 102 Repairs Federal contract opportunity
Solicitation number
P16PS00037
Issued by
Department of the Interior National Park Service National Office

About this file

Amendment 000005 P16PS00037.pdf

View the file

Other files for this federal contract opportunity

Other files attached to GATE 201069C - Building 102 Repairs, newest first.
File Type Posted
Att._6_General_Decision_Number_NJ150037_11062015__NJ37.pdf PDF
Att._5_B102-Existing_Pressed_Tin_Ceiling-2.JPG JPG image
Att._4_B102-Existing_Pressed_Tin_Ceiling-1.JPG JPG image
Att._3_2015-0528_FINAL_Building_102_HFS.pdf PDF
P16PS00037_Amendment_000004.pdf PDF
Att._2_01_27_00_DEFINITION_OF_CONTRACT_LINE_ITEMS_Revised_.pdf PDF
Att._1_Compiled_Bid_Questions_Complete_11.25.15.pdf PDF
P16PS00037_Amendment_000003.pdf PDF
Amendment_000002_P16PS00037.pdf PDF
Amendment_000001_P16PS00037.pdf PDF
Att._2_GATE201069C_Final_CD-SPECIFCIATIONS-DIV_02-12_VL02_1509021.pdf PDF
Att._9_Proposal_Submission_Package.docx DOCX document
102615_RFP_P16PS00037.pdf PDF
Att._7_GATE201069C_Final_CD-ContractPriceSchedule-Blank_151019.xls XLS spreadsheet
Att._3_GATE201069C_Final_CD-SPECIFCIATIONS-DIV_21-33_VL03_1509021.pdf PDF
Att._4_Combined_Set_-GATE_646_124865_A.pdf PDF
Att._5_Combined_Set_-_GATE_646_41068.pdf PDF
Att._6_General_Decision_Number_NJ150037_10092015__NJ37.pdf PDF
Att._1_GATE201069C_Final_CD-SPECIFICATIONS-DIV_01_VL01_1509021_rev.pdf PDF
Att._8_Map _GATE-SAHO _Fort_Hancock.pdf PDF
P16PS00037_Presolicitation_Notice.pdf PDF
Amended_Presolicitation_P15PS01047.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

P16PS00037

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

201069C12/02/2015000005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/26/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

GATE 201069C - Building 102 Repairs

The subject Solicitation Number: P16PS00037 is hereby AMENDED as follows:

1. Responses to Outstanding Requests for Information reference attached Continuation

Pages; and

2. Attachment 6, Construction Wage Decision October 2015 is revised and replaced in its entirety. Reference new Att._6_General_Decision_Number_NJ150037_11062015__NJ37.pdf

November 2015.

Offerors are responsible for submitting timely proposals. Review the due date and time

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

John Chaney

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

P16PS00037/000005

published on https://www.fbo.gov/ for this Solicitation. The Government is not responsible for an Offeror's rejected bid for email size limitations and/or their technical glitches.

Offerors are reminded that it is an Offeror's responsibility to deliver its proposal to the place designated in the solicitation by the time specified.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

1. The specification calls for service weight pipe and fittings with gaskets above the ground.

Can cast iron, no hub pipe and fittings be used on the waste & vent AFF. It's been the industry standard for 35 years?

Yes, cast iron no-hub pipe and fittings can be used on the waste and vent pipe above finished floor. All sanitary and vent piping below finished floor should remain cast iron hub-and-spigot.

2. Drawing PO.I general note #9 what does this mean?

The following note is required by NPS for any exterior site work that involves ground disturbing activities: “Prior to construction, the Contractor shall provide survey, monitoring, exposure and anomaly avoidance services for Munitions and Explosives of Concern (MEC) in conjunction with planned ground disturbing activities in the SAHO Building 102 project area.” The building is located on the site of a former active fort and thus survey precautions are stipulated for the avoidance of any possible MEC during ground disturbing activities. This note is relevant to work including, but not limited to, the exterior site work required for the LP UST and piping.

3. Is the underground storage tank UST supplied and installed by the plumber?

The UST shall be installed by qualified persons in accordance with all State and Federal requirements.

4. Is a State of New Jersey DPMC classification required for this project?

Contractor shall comply with all relevant State and Federal Requirements.

5. Is the removal of all pressed tin ceilings required or does it only pertain to Bid Additive Item F?

Refer to the demolition RCP drawings on A1.3, A1.4, and A1.5 and the associated keynotes. These drawings show there are areas of pressed tin ceiling removal and salvage. Unless an item is designated as an “Option”, it is base contract work.

6. Sheet A1.2 Keyed Note 02-71 refers to Bid Option I. The note is referring to salvaging plumbing fixtures. Bid Option I is referring to doors. Please clarify.

Reference to Bid Option I is incorrect. Disregard.

7. Sheet A1.3 General Note 6. If structural deficiencies are found will a modification to the contract be awarded for additional work?

The contractor is required to complete all work included in the contract documents.

Any unforeseen site conditions will be handled in accordance with the appropriate contract clauses.

8. Sheets A 1.3 – A 1.5 Keyed Note 02-64 and Section 02 83 13 Table 1. Per the Keyed Note we are to salvage the historic tin ceiling tiles for reinstallation. Per Table 1 they are contaminated with lead paint. Typically items removed for lead abatement are discarded off-site. Bid Option F calls for reinstallation of the tin ceiling tiles. These would have to have the lead paint removed carefully to not damage the tiles. Should the base bid treat the tiles as being disposed off-site and Option F to carefully remove the lead from the tiles for reinstallation?

Refer to definitions in specification section 01 3591 “Historic Preservation Treatment Procedures”. Remove and Salvage is defined as “To detach items from existing construction and deliver them to the NPS ready for reuse.” Careful removal of lead paint is required as base contract work as it is required to make the tiles “ready for reuse”.

9. A2.0, A7.1, S2 & S9. Concrete ramp. Is any preparation of or doweling into the existing concrete slab required?

Doweling is not required. ½” compressible filler against existing masonry wall is shown on S9.

10. S2. What is the spacing for the new concrete footing in the East Wing?

New footings are to be located at the same locations as the existing footings to be removed.

11. S9 detail 2 indicates stair nosing and refers to the architectural drawings. The architectural drawings do not indicate stair nosing nor is there a specification for stair nosing. Please clarify.

Stair nosing note on S9 will be removed.

12. S5 detail 4. How does the lentil terminate and bear on the ends?

Lintel terminates and bears 6” at each end.

13. S5 detail 5. Where does this occur?

At masonry wall openings up to 4’-0” wide (lintels are not required for openings 16 inches or less).

14. S6 detail 4. Where does this occur?

See drawing S3 where W8x28 is shown in plan.

15. A7.1 All the details include Keyed Note 05-06. The Keyed Note says it is not used.

Please clarify.

Revise Keyed Note 05-06 to read “Provide metal tube handrail – paint.”

16. S2 has a notation on the East Wing calling for pipe columns, see S6. S6 shows the base detail. Where is the cap detail?

See drawing S3 where W8x28 is shown in plan.

17. A7.1 Keynote 04-41 does not have a description. Please provide.

Delete keynote 04-41 from detail 1 on drawing A7.8