Osceola Avenue Corridor Improvements
Solicitation number
22-0017-EN
Issued by
Pinellas County, Florida

About this file

This document is the Supplemental General Conditions (Section IIIA) for the Osceola Avenue Corridor Improvements project issued by the City of Clearwater, Florida Public Works Department. The project encompasses roadway reconstruction, stormwater improvements, potable water, reclaimed water and sanitary sewer infrastructure, pedestrian and signal improvements, intelligent transportation systems, and landscaping along the Osceola Avenue corridor in downtown Clearwater. The work is being executed as a lump sum contract with a contract time of 365 days. The project requires coordination with multiple adjacent developments including the Ballad Hotel (KAST), Bluffs Apartments (Gotham and Moss Construction), and the Osceola Parking Garage (Creative Contractors), as well as accommodation of City-approved special events. The contractor must submit a Coordination Matrix and Project Coordination Plan within 14 days of Notice to Proceed and participate in mandatory weekly coordination meetings throughout the project duration. The project schedule incorporates milestones for adjacent development projects and maintains strict requirements for traffic control, utility operations, and pedestrian access, particularly to the Clearwater Main Library.

The contractor is responsible for all costs associated with coordination with adjacent projects, other contractors, utility operations, and public events, with such impacts accounted for within the lump sum contract price and 365-day schedule. The owner retains sole authority to prohibit or order work stopped and may cancel scheduled shutdowns without providing additional compensation, though delays from such cancellations may be considered for time extensions at the city's discretion. No monetary compensation is due for delays or disruptions arising from adjacent construction activities, utility operations, or coordination requirements consistent with contract documents; however, if delays result from material deviations from documented coordination and could not have been reasonably anticipated or were not caused by the contractor, equitable adjustment in contract time and potential additional compensation may be considered. The contractor must maintain traffic per FDOT standards, develop a dynamic maintenance of traffic approach accommodating adjacent construction and special events, provide minimum 10 days' notice for utility shutdowns, and maintain adequate labor, supervision, and equipment to ensure project completion in accordance with all milestones and schedule requirements. Failure to maintain adequate progress or comply with coordination requirements may result in the owner supplementing the work at the contractor's expense.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION IIIA – SUPPLEMENTAL GENERAL CONDITIONS

SECTION IIIA Page 1 of 6

SECTION IIIA

CITY OF CLEARWATER, FLORIDA

PUBLIC WORKS DEPARTMENT

SUPPLEMENTAL GENERAL CONDITIONS – SUMMARY (SECTION IIIA)

GENERAL

This document summarizes Section IIIA – Supplemental General Conditions for the Osceola Corridor Improvements Project. These provisions modify and supplement the General Conditions and establish coordination-driven requirements for project execution.

1. PHASING AND COORDINATION

Phasing is conceptual and not fixed. The Contractor shall perform the Work in a flexible and adaptive manner to accommodate adjacent developments, including the Ballad Hotel (KAST), Bluffs Apartments (Gotham), and the Osceola Parking Garage (Creative Contractors), as well as City-approved events. Concurrent operations within and adjacent to the corridor shall be considered normal and anticipated conditions of the Work.

2. NO EXCLUSIVE ACCESS

The City retains control of the public right-of-way. The Contractor is not guaranteed exclusive use of the project corridor and shall plan for shared access with developers and other parties. The Contractor shall make a good faith effort to coordinate with adjacent projects, including the Ballad Hotel (KAST), Bluffs Apartments (Gotham), and the Osceola Parking Garage (Creative Contractors); however, such coordination shall not relieve the Contractor of its obligation to maintain progress of the Work in accordance with the Contract Documents. Coordination with all stakeholders is essential to the successful execution of the Work.

3. NO DAMAGES FOR DELAY

The Contractor acknowledges that the Project requires ongoing coordination with adjacent construction activities, utility operations, other contractors, and public events within and adjacent to the Project corridor.

The Contractor further acknowledges that allowances for coordination-related impacts with adjacent property owners and contractors along the corridor are included in the Lump Sum Contract Price and accounted for under the Contract Time (365 days), and that such allowances account for reasonably anticipated impacts associated with adjacent projects, utilities, and City requirements. No coordination-related allowance or contingency work shall proceed without prior written authorization from the Owner.

The Contractor agrees that no monetary compensation shall be due for delays, disruptions, or inefficiencies arising from:

• Activities of adjacent or nearby construction projects

• Operations of other contractors, utility companies, or developers

SECTION IIIA Page 2 of 6

• Coordination requirements imposed by the Owner provided that such impacts are consistent with the Contract Documents, including the Project Coordination Matrix, the Project Schedule, and associated milestones, and coordination requirements documented in project meetings.

For impacts meeting the above conditions, the Contractor’s sole remedy shall be an extension of Contract Time, if justified.

If the Contractor demonstrates that delays or disruptions result from a material deviation from documented coordination, and such impacts could not have been reasonably anticipated and were not caused by the Contractor, the Contractor may be entitled to an equitable adjustment in Contract Time and consideration of additional compensation, subject to proper documentation and notice in accordance with the Contract.

This provision shall not apply in cases of the Owner’s active interference or bad faith actions.

4. COORDINATION MATRIX

Within fourteen (14) days of Notice to Proceed, the Contractor shall submit a Coordination Matrix identifying all stakeholders, including KAST, Moss Construction, Creative Contractors, and City of Clearwater Special Events, and defining associated conflicts, interfaces, and coordination responsibilities.

In addition, the Contractor shall prepare and submit a Project Coordination Plan within the same timeframe. The Coordination Plan shall include, at a minimum:

• Strategies for coordinating with adjacent developments, including sequencing and interface management

• Procedures to avoid and mitigate conflicts with private construction activities

• Methods to maintain access and safety during special events, including concerts, festivals, and public gatherings

• Communication protocols with developers, utility providers, businesses, and City staff

• Procedures for identifying, escalating, and resolving coordination conflicts in a timely manner

The Coordination Matrix and Coordination Plan shall be integrated with the CPM schedule and used together as the primary coordination and documentation tools for the Project.

The Coordination Matrix shall be updated monthly, and the Coordination Plan shall be updated as necessary throughout the duration of the Work.

Acceptance of the Coordination Matrix or Coordination Plan by the Owner does not relieve the Contractor of its obligations under the Contract Documents.

SECTION IIIA Page 3 of 6

5. SCHEDULE AND MILESTONES

The Contractor shall incorporate adjacent project milestones, including those associated with the Ballad Hotel (KAST), Bluffs Apartments (Moss Construction), and the Osceola Parking Garage (Creative Contractors), as well as event readiness requirements and coordination activities, into the CPM schedule.

6. WEEKLY COORDINATION MEETINGS

The Contractor shall attend mandatory weekly coordination meetings and provide a two-week lookahead schedule, updated Coordination Matrix, and identification of potential conflicts, including those associated with adjacent projects such as the Ballad Hotel (KAST), Bluffs Apartments (Moss Construction), and the Osceola Parking Garage (Creative Contractors), and shall proactively coordinate with all stakeholders to mitigate such conflicts.

7. SCHEDULE CONTROL AND FLOAT

The city shall have the sole authority to prohibit or order work stopped. The city reserves the right to cancel scheduled shutdowns if conditions warrant. Delays to the Contractor caused by cancellations will be considered in evaluating requests for a time extension. They will not be considered an entitlement to additional compensation. However, compensation may be considered at city’s sole discretion

8. TRAFFIC AND UTILITY RESPONSIBILITIES

The Contractor shall maintain traffic in accordance with FDOT standards and ensure access at all times. Construction activities shall not interrupt water, wastewater, or reclaimed water service except for shutdowns or services interruptions approved in advance by the City and coordinated in accordance with Section IV, Section 209-2, Maintenance of Operations, and other applicable Contract Documents.

The Contractor shall develop, implement, and maintain a dynamic and adaptive Maintenance of Traffic (MOT) approach that accommodates adjacent construction activities, special events, peak traffic conditions, pedestrian access, and downtown operations.

The Contractor shall adjust MOT operations as necessary and as directed by Public Works, Transportation Division to minimize impacts to the public, businesses, and adjacent developments.

All modifications to MOT shall be performed in accordance with FDOT standards and approved traffic control plans. Pedestrian access to the Clearwater Main Library shall be maintained at all times during the Project. Access to the library parking lot shall also be maintained except where temporary closure is specifically approved by the Owner to facilitate construction activities. The Contractor shall minimize the duration and extent of any parking lot closure to the greatest extent practicable and shall coordinate all closures in advance with the Owner.

Intermittent reopening of eastbound Cleveland Street shall be permitted only when approved in writing by the Owner on a case-by-case basis, for limited durations, and solely as necessary to facilitate traffic detours or maintain traffic operations.

SECTION IIIA Page 4 of 6

Failure to adequately maintain or adapt traffic operations in accordance with this Section may be considered a failure to properly prosecute the Work.

The Contractor shall keep existing utilities in service during all phases of construction and coordinate any system shutdowns with the city sufficiently in advance to provide alternative service. The Contractor shall provide a minimum of 10 days’ notice. The Contractor shall protect the city’s utility system for any spills or overflows during construction. The city’s Project Manager and Dispatch (727-462-6633) shall be notified of any spills or overflows immediately.

9. PERFORMANCE REQUIREMENTS

The Contractor shall prosecute the Work with sufficient forces, equipment, and supervision to ensure completion in accordance with the Contract Documents, including all milestones and schedule requirements.

If, in the opinion of the Owner or Engineer, the Contractor fails to maintain adequate progress, properly staff the Project, or comply with coordination, schedule, or performance requirements, the Owner may, without additional cost to the Owner, require the Contractor to:

• Increase labor, supervision, equipment, or working hours

• Take any other action necessary to restore acceptable progress

If the Contractor fails to take corrective action promptly, the Owner reserves the right to supplement the Work with additional forces or contractors. All costs incurred by the Owner in supplementing the Work shall be the Contractor's responsibility and may be deducted from amounts due under the Contract.

The Contractor shall ensure that all personnel, including key staff and subcontractors, meet the qualification requirements specified in the Contract Documents. The Owner reserves the right to review, approve, and reject personnel or subcontractors that do not meet these requirements or fail to perform satisfactorily.

Failure to comply with this Section may constitute grounds for further contractual remedies, including withholding payment, assessment of damages, or termination in accordance with the Contract Documents.

10. STAKEHOLDER COMMUNICATION REQUIREMENTS

The Contractor shall maintain proactive and continuous communication with all project stakeholders, including adjacent developers, businesses, residents, utility providers, and event coordinators.

The Contractor shall:

• Designate a single point of contact responsible for coordination and communication

• Provide advance notice of construction activities that may impact access, traffic operations, or adjacent development activities

SECTION IIIA Page 5 of 6

• Participate in coordination meetings with stakeholders as required by the Owner

• Respond promptly to coordination issues, conflicts, and public concerns

Failure to maintain effective communication and coordination with stakeholders may be considered a failure to properly prosecute the Work.

11. IMPACT MINIMIZATION REQUIREMENT

The Contractor shall plan and execute the Work in a manner that minimizes disruption to adjacent construction activities, downtown businesses, residents, and special events.

Cleveland Street is permanently closed for traffic, but eastbound Cleveland Street shall be re-opened for short durations, should MOT Phasing require. Advance coordination and prior written approval from the City shall be required.

Construction sequencing, scheduling, and operations shall be developed and adjusted as necessary to maintain access, support adjacent project activities, and reduce impacts to the public and surrounding properties. This may include the temporary opening of eastbound traffic on Cleveland Street to facilitate construction, Advanced coordination and prior written approval from the City shall be required.

The Contractor acknowledges that impact minimization is a material requirement of the Work and shall incorporate such considerations into all planning and execution activities.

12. PRECONSTRUCTION COORDINATION WORKSHOP

Prior to commencement of Work, the Contractor shall participate in a mandatory coordination workshop with the Owner, Engineer, adjacent developers, utility providers, and key stakeholders.

The purpose of the workshop shall be to:

• Review coordination requirements and project constraints

• Establish communication protocols and points of contact

• Identify critical conflicts, interfaces, and access limitations

• Align sequencing, phasing, and milestone expectations

The Contractor shall incorporate outcomes of the workshop into the Project Schedule, Coordination Matrix, and Coordination Plan.

The Contractor shall incorporate the outcomes of the workshop into the Project Schedule, Coordination Matrix, including milestones for project activities that are substantially complete, such as Bluffs, Ballad Hotel, and Osceola Parking Garage, including milestones for project activities that are substantially complete, such as Bluffs, Ballard Hotel, and Osceola Parking Garage, and the Coordination Plan.

SECTION IIIA Page 6 of 6

END OF DOCUMENT

Osceola Avenue Corridor Improvements
22-0017-EN
CONTRACT DOCUMENTS & SPECIFICATIONS
Prepared for
Final Design
JUNE/2026 City of Clearwater, Florida
Osceola Avenue Corridor Improvements
(22-0017-EN)
TABLE OF CONTENTS
SECTION I ADVERTISEMENT OF BIDS & NOTICE TO CONTRACTORS
SECTION II INSTRUCTIONS TO BIDDERS
SECTION IIA SUPPLEMENTAL INSTRUCTIONS TO BIDDERS
SECTION III GENERAL CONDITIONS
SECTION IIIA SUPPLEMENTAL GENERAL CONDITIONS
SECTION IV TECHNICAL SPECIFICATIONS
SECTION IVA SUPPLEMENTAL TECHNICAL SPECIFICATIONS
SECTION V CONTRACT DOCUMENTS
APPENDIX ODP DOCUMENTS AND OTHER PROJECT DOCUMENTATION
SectionI - 2025_0709.pdf
INVITATION TO BID NOTICE TO CONTRACTORS
SectionII - 2025_0709.pdf
SECTION II
INSTRUCTIONS TO BIDDERS
1. COPIES OF BIDDING DOCUMENTS
2. QUALIFICATION OF BIDDERS
3. EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4. INTERPRETATIONS AND ADDENDA
5. BID SECURITY OR BID BOND
6. CONTRACT TIME
7. LIQUIDATED DAMAGES
8. SUBSTITUTE MATERIAL AND EQUIPMENT
9. SUBCONTRACTORS
10. BID/PROPOSAL FORM
11. SUBMISSION OF BIDS
12. MODIFICATION AND WITHDRAWAL OF BIDS
13. REJECTION OF BIDS
14. DISQUALIFICATION OF BIDDER
15. OPENING OF BIDS
16. LICENSES, PERMITS, ROYALTY FEES AND TAXES
17. IDENTICAL TIE BIDS/VENDOR DRUG FREE WORKPLACE
18. AWARD OF CONTRACT
19. BID PROTEST
20. TRENCH SAFETY ACT
21. CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL MANAGEMENT MEASURES
SectionIII - 2025_0709.pdf
1. DEFINITIONS
2. PRELIMINARY MATTERS
2.1. DELIVERY OF BONDS AND CERTIFICATES OF INSURANCE
2.2. COPIES OF DOCUMENTS
2.3. COMMENCEMENT OF CONTRACT TIME/NOTICE TO PROCEED, STARTING THE PROJECT
2.4. BEFORE STARTING CONSTRUCTION
2.5. PRECONSTRUCTION CONFERENCE
2.6. PROGRESS MEETINGS
3. CONTRACT DOCUMENTS, INTENT
3.1. INTENT
3.2. REPORTING AND RESOLVING DISCREPANCIES
4. AVAILABILITY OF LANDS, SUBSURFACE AND PHYSICAL CONDITIONS, REFERENCE POINTS
4.1. AVAILABILITY OF LANDS
4.2. INVESTIGATIONS AND REPORTS
4.3. PHYSICAL CONDITIONS, UNDERGROUND FACILITIES
4.4. REFERENCE POINTS
5. BONDS AND INSURANCE
5.1. PERFORMANCE AND PAYMENT BOND/CONTRACT BOND
5.2. INSURANCE REQUIREMENTS
5.2.1. COMMERCIAL GENERAL LIABILITY INSURANCE
5.2.2. COMMERCIAL AUTOMOBILE LIABILITY INSURANCE
5.2.3. WORKERS’ COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
5.2.4. PROFESSIONAL LIABILITY/MALPRACTICE/ERRORS OR OMISSIONS INSURANCE
5.2.5. CONTRACTOR’S EQUIPMENT/INLAND MARINE/PROPERTY INSURANCE
5.2.6. BUILDER’S RISK INSURANCE
5.3. OTHER INSURANCE PROVISIONS
5.4. WAIVER OF RIGHTS
6. CONTRACTOR’S RESPONSIBILITIES
6.1. SUPERVISION AND SUPERINTENDENCE
6.2. LABOR, MATERIALS AND EQUIPMENT
6.3. SUBSTITUTES AND "OR EQUAL" ITEMS
6.4. SUBCONTRACTORS, SUPPLIERS AND OTHERS
6.5. USE OF PREMISES
6.5.1. STAGING AREAS
6.5.2. RESTORATION TIME LIMITS
6.6. LICENSE AND PATENT FEES, ROYALTIES AND TAXES
6.7. LAWS AND REGULATIONS
6.7.1. E-VERIFY
6.8. PERMITS
6.9. SAFETY AND PROTECTION
6.10. EMERGENCIES
6.11. DRAWINGS
6.11.1. SHOP DRAWINGS, SAMPLES, RFIs, AND SUBMITTAL REVIEW
6.11.2. AS-BUILT DRAWINGS
6.11.2.1. General
6.11.2.2. Sanitary and Storm Sewer Piping Systems
6.11.2.3. Pressure Pipe construction (Water, Reclaimed Water, Force Main)
6.11.2.4. Electrical and Control Wiring
6.11.2.5. Horizontal and Vertical Control
6.11.2.6. Standards
6.11.2.7. Other
6.11.3. CAD STANDARDS
6.11.3.1. Layer Naming
6.11.3.1.1. Prefixes and Suffixes
6.11.3.1.2. Layer Naming Definitions:
6.11.3.2. Layer Properties
6.11.3.3. Text Styles

6.11.4. DELIVERABLES

6.12. CONTRACTOR'S GENERAL WARRANTY AND GUARANTEE
6.13. CONTINUING THE WORK
6.14. INDEMNIFICATION
6.15. CHANGES IN COMPANY CONTACT INFORMATION
6.16. PUBLIC RECORDS
7. OTHER WORK
7.1. RELATED WORK AT SITE
7.2. COORDINATION
8. OWNER’S RESPONSIBILITY
9. OWNER REPRESENTATIVE’S STATUS DURING CONSTRUCTION
9.1. OWNER’S REPRESENTATIVE
9.2. CLARIFICATIONS AND INTERPRETATIONS
9.3. REJECTING OF DEFECTIVE WORK
9.4. SHOP DRAWINGS, CHANGE ORDERS, AND PAYMENTS
9.5. DECISIONS ON DISPUTES
9.6. LIMITATIONS ON OWNER REPRESENTATIVE'S RESPONSIBILITIES
10. CHANGES IN THE WORK
11. CHANGES IN THE CONTRACT PRICE
11.1. CHANGES IN THE CONTRACT PRICE
11.2. ALLOWANCES AND FINAL CONTRACT PRICE ADJUSTMENT
11.3. UNIT PRICE WORK
12. CHANGES IN CONTRACT TIME
13. TESTS AND INSPECTIONS, CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK
13.1. TESTS AND INSPECTION
13.2. UNCOVERING THE WORK
13.3. OWNER’S REPRESENTATIVE MAY STOP THE WORK
13.4. CORRECTION OR REMOVAL OF DEFECTIVE WORK
13.5. WARRANTY/CORRECTION PERIOD
13.6. ACCEPTANCE OF DEFECTIVE WORK
13.7. OWNER MAY CORRECT DEFECTIVE WORK
14. PAYMENTS TO CONTRACTOR AND COMPLETION
14.1. APPLICATION FOR PROGRESS PAYMENT
14.2. CONTRACTOR'S WARRANTY OF TITLE
14.3. REVIEW OF APPLICATIONS FOR PROGRESS PAYMENTS
14.4. PARTIAL UTILIZATION
14.5. FINAL INSPECTION
14.6. FINAL APPLICATION FOR PAYMENT
14.7. FINAL PAYMENT AND ACCEPTANCE
14.8. WAIVER OF CLAIMS
15. SUSPENSION OF WORK AND TERMINATION
15.1. OWNER MAY SUSPEND THE WORK
15.2. OWNER MAY TERMINATE
15.3. CONTRACTOR MAY STOP WORK OR TERMINATE
16. DISPUTE RESOLUTION
17. MISCELLANEOUS
17.1. SUBMITTAL AND DOCUMENT FORMS
17.2. GIVING NOTICE
17.3. NOTICE OF CLAIM
17.4. PROFESSIONAL FEES AND COURT COSTS INCLUDED
17.5. ASSIGNMENT OF CONTRACT
17.6. RENEWAL OPTION
17.7. ROLL-OFF CONTAINERS AND/OR DUMPSTERS
18. ORDER AND LOCATION OF THE WORK
19. MATERIAL USED
20. CONFLICT BETWEEN PLANS AND SPECIFICATIONS
21. OWNER DIRECT PURCHASE (ODP)
21.1. SALES TAX SAVINGS
21.2. TITLE AND OWNER RISK
21.3. CONTRACTOR’S RECEIPT OF MATERIALS
21.4. ODP RECORDS, WARRANTIES, AND INDEMNIFICATION
22. RESIDENT NOTIFICATION OF START OF CONSTRUCTION
22.1. GENERAL
22.2. EXAMPLE
23. PROJECT INFORMATION SIGNS
23.1. SCOPE AND PURPOSE
23.2. PROJECT SIGN, FIXED OR PORTABLE
23.3. FIXED SIGN
23.4. PORTABLE SIGNS
23.5. SIGN COLORING
23.6. SIGN PLACEMENT
23.7. SIGN MAINTENANCE
23.8. TYPICAL PROJECT SIGN
24. AWARD OF CONTRACT, WORK SCHEDULE AND GUARANTEE
25. SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM AND ISRAEL CERTIFICATION FORM
section-iv_6_11_2026.pdf
100 SERIES: GENERAL
101. SCOPE OF WORK
102. FIELD ENGINEERING
102-1. LINE AND GRADE PERFORMED BY THE CONTRACTOR
102-1.1. GRADES, LINES AND LEVELS
102-1.2. LAYOUT DATA

102-2. LINE AND GRADE PERFORMED BY THE CITY

103. DEFINITION OF TERMS
103-1. REFERENCE STANDARDS
104. STREET CROSSINGS, ETC.
105. AUDIO/VIDEO RECORDING OF WORK AREAS
105-1. CONTRACTOR TO PREPARE AUDIO/VIDEO RECORDING
105-2. SCHEDULING OF AUDIO/VIDEO RECORDING
105-3. PROFESSIONAL VIDEOGRAPHERS
105-4. EQUIPMENT
105-5. RECORDED AUDIO INFORMATION
105-6. RECORDED VIDEO INFORMATION
105-7. VIEWER ORIENTATION
105-8. LIGHTING
105-9. SPEED OF TRAVEL
105-10. VIDEO LOG/INDEX
105-11. AREA OF COVERAGE
105-12. COSTS OF VIDEO SERVICES
106. STREET SIGNS
107. WORK ZONE TRAFFIC CONTROL
107-1. CONTRACTOR RESPONSIBLE FOR WORK ZONE TRAFFIC CONTROL
107-2. WORK ZONE TRAFFIC CONTROL PLAN
107-2.1. WORK ZONE SAFETY
107-3. ROADWAY CLOSURE GUIDELINES
107-3.1. ALL ROADWAYS
107-3.1.1. PUBLIC NOTIFICATION
107-3.2. MAJOR ARTERIALS, MINOR ARTERIALS, LOCAL COLLECTORS
107-3.2.1. PUBLIC NOTIFICATION
107-3.3. MAJOR ARTERIALS, MINOR ARTERIALS
107-3.3.1. PUBLIC NOTIFICATION
107-3.4. MAJOR ARTERIALS
107-3.4.1. PUBLIC NOTIFICATION
107-4. APPROVAL OF WORK ZONE TRAFFIC CONTROL PLAN
107-5. INSPECTION OF WORK ZONE TRAFFIC CONTROL OPERATION
107-6. PAYMENT FOR WORK ZONE TRAFFIC CONTROL
107-7. CERTIFICATION OF WORK ZONE TRAFFIC CONTROL SUPERVISOR
108. OVERHEAD ELECTRIC LINE CLEARANCE
108-1. CLEARANCE OPTIONS
108-2. REQUIRED MINIMUM CLEARANCE DISTANCES
200 SERIES: SITEWORK
201. EXCAVATION FOR UNDERGROUND INFRASTRUCTURE WORK
201-1. EXCAVATION, BACKFILLING, AND COMPACTION FOR UNDERGROUND INFRASTRUCTURE
201-1.1. GENERAL
201-1.2. MATERIALS
201-1.3. CLEARING AND GRUBBING
201-1.3.1. GENERAL
201-1.3.2. CLEARING AND GRUBBING OPERATIONS
201-1.3.3. DISPOSAL OF DEBRIS MATERIAL
201-1.3.4. PRESERVATION OF TREES AND SHRUBBERY
201-1.3.5. PRESERVATION OF DEVELOPED PRIVATE PROPERTY
201-1.3.6. PRESERVATION OF PUBLIC PROPERTY
201-1.4. EXCAVATION PROTECTION
201-1.4.1. SHEETING AND BRACING
201-1.5. EXCAVATING FOR UTILITY STRUCTURES
201-1.6. TRENCH EXCAVATION FOR UTILITY PIPELINES
201-1.6.1. TRENCH EXCAVATION FOR PIPE LAYING - GENERAL
201-1.6.2. LIMITED TRENCH WIDTHS
201-1.6.3. MECHANICAL EXCAVATION
201-1.6.4. PAVEMENT CUTTING
201-1.6.5. ARTIFICIAL FOUNDATIONS IN TRENCHES
201-1.6.6. BELL HOLES
201-1.7. UNDERCUT OF EXCAVATIONS
201-1.8. STABILIZATION OF EXCAVATIONS
201-1.9. BACKFILL AND COMPACTION
201-1.9.1. MATERIALS
201-1.9.2. BACKFILL PLACEMENT AND COMPACTION
201-1.9.3. STRUCTURE FOUNDATION PREPARATION
201-1.10. DRAINAGE FROM EXCAVATIONS
201-1.11. FINAL GRADING
201-1.12. EXCESS EXCAVATED MATERIAL
201-1.13. SETTLEMENT
202. OBSTRUCTIONS
203. DEWATERING
203-1. GENERAL
203-1.1. Definition of Terms for Dewatering System
203-2. OBSERVATION WELLS
203-3. PUMPING AND DRAINAGE - GENERAL
203-3.1. DEWATERING EQUIPMENT
203-3.2. DEWATERING CONSIDERATIONS
203-3.3. DISPOSAL OF PUMPED WATER
203-3.4. GROUNDWATER TREATMENT (IF REQUIRED)

203-4. PERMIT REQUIREMENTS

204. UNSUITABLE MATERIAL REMOVAL
204-1. BASIS OF MEASUREMENT
204-2. BASIS OF PAYMENT
205. UTILITY TIE IN LOCATION MARKING
206. CLEARING AND GRUBBING
206-1. BASIS OF MEASUREMENT
206-2. BASIS OF PAYMENT
207. EROSION AND SEDIMENT CONTROL
207-1. GENERAL
207-2. TRAINING OF PERSONNEL
207-3. STABILIZATION OF DENUDED AREAS
207-4. PROTECTION AND STABILIZATION OF SOIL STOCKPILES
207-5. PROTECTION OF EXISTING STORM SEWER SYSTEMS
207-6. SWALES, DITCHES AND CHANNELS
207-7. UNDERGROUND UTILITY CONSTRUCTION
207-8. MAINTENANCE
207-9. COMPLIANCE
208. CONSTRUCTION AND REPAIR OF SEAWALLS AND OTHER BEACH EROSION CONTROL STRUCTURES
208-1. EXISTING SEAWALLS AND REVETMENTS
208-2. TOP OF CAP ELEVATION
208-3. SEAWALLS AND REVETMENTS LOCATED SEAWARD OF THE CCL
208-4. PLACEMENT OF NEW SEAWALL
208-5. POST CONSTRUCTION SURVEY
208-6. RIP-RAP
208-7. RETAINING WALL IN LIEU OF VERTICAL SEAWALL
209. MAINTENANCE OF OPERATIONS
209-1. GENERAL
209-2. EXECUTION
209-3. BASIS OF MEASUREMENT
210. DETECTION OF FACILITIES
211. RELOCATIONS
211-1. RELOCATION SHOWN ON DRAWINGS
211-2. RELOCATIONS NOT SHOWN ON DRAWINGS
212. RESTORATION PROCEDURES
212-1. INTERIM RESTORATION
212-2. FINAL RESTORATION
300 SERIES: MATERIALS
301. CONCRETE
302. EXCAVATION AND FORMS FOR CONCRETE WORK
302-1. EXCAVATION
302-2. FORMS
303. REINFORCEMENT
303-1. BASIS OF PAYMENT
304. BACKFILL
304-1. MATERIALS AND GENERAL
304-2. TESTING AND INSPECTION
305. RIPRAP
305-1. BASIS OF MEASUREMENT
305-2. BASIS OF PAYMENT
306. FLOWABLE FILL
307. MATERIAL INDEPENDENT TESTING
400 SERIES: SANITARY SEWER
401. SANITARY MANHOLES
401-1. BUILT UP TYPE
401-2. PRECAST TYPE
401-2.1. MANHOLE ADJUSTMENT RINGS (GRADE RINGS)
401-2.2. STAINLESS STEEL MANHOLE STORM WATER INFLOW ABATEMENT INSERTS (DISH/PAN)
401-2.2.1. MATERIALS AND DESIGN
401-2.2.2. MEASUREMENT AND PAYMENT
401-3. DROP MANHOLES
401-4. FRAMES AND COVERS
401-5. MANHOLE COATINGS
401-6. CONNECTIONS TO MANHOLES
401-7. MEASUREMENT AND PAYMENT
402. RAISING OR LOWERING OF SANITARY SEWER STRUCTURES
402-1. BASIS OF PAYMENT
403. SANITARY SEWERS AND FORCE MAINS
403-1. MATERIALS
403-1.1. GRAVITY SEWER PIPE
403-1.2. FORCE MAIN PIPE
403-2. INSTALLATION
403-2.1. GRAVITY SEWER PIPE
403-2.2. FORCE MAIN PIPE
403-3. INSPECTIONS OF LINES AND MANHOLES
403-4. TESTING
403-4.1. TESTING OF GRAVITY SEWERS
403-4.2. TESTING OF FORCE MAINS
403-5. BASIS OF PAYMENT
403-5.1. GRAVITY SEWER PIPE
403-5.2. FORCE MAIN PIPE PAYMENT
404. CURED-IN-PLACE PIPE SANITARY SEWER REHABILITATION
404-1. GENERAL
404-2. MEASUREMENT & PAYMENT
404-3. SUBMITTALS
404-4. CURED-IN-PLACE PIPE (CIPP) FOR GRAVITY SEWER MAINS
404-4.1. LINER MATERIAL
404-4.2. CHEMICAL JOINT, CRACK AND ANNULAR SPACE SEALING MATERIALS FOR ACTIVE LEAKS AND SERVICE LATERAL CONNECTIONS
404-4.3. MANHOLE CONNECTIONS
404-4.4. INSTALLATION AND EXECUTION
404-4.4.1. CLEANING/SURFACE PREPARATION
404-4.4.2. TELEVISION INSPECTION
404-4.4.2.1. IMAGE (PHOTOS) CAPTURE FORMAT AND REQUIREMENTS
404-4.4.2.2. DIGITAL VIDEO FORMAT AND REQUIREMENTS
404-4.4.2.3. SYNCHRONIZATION
404-4.4.3. LINER INSTALLATION
404-4.4.4. LATERAL RECONNECTION
404-4.4.5. TIME OF CONSTRUCTION
404-4.4.6. TESTING AND ACCEPTANCE
404-4.4.7. CLEANUP
404-5. CURED-IN-PLACE PIPE (CIPP) FOR SERVICE LATERALS
404-5.1. LINER MATERIAL
404-5.2. EPOXY RESIN MATERIAL
404-5.3. INSTALLATION AND EXECUTION
404-5.3.1. PRE-LINING INSPECTION
404-5.3.2. LATERAL PREPARATION
404-5.3.3. LINER INSTALLATION
404-5.3.4. TESTING AND ACCEPTANCE
405. SANITARY MANHOLE LINER RESTORATION
405-1. SCOPE AND INTENT
405-2. MEASUREMENT & PAYMENT
405-2.1. MANHOLE LINERS/COATING
405-2.2. REPLACE FRAME & COVER
405-2.3. REBUILD BENCH & CHANNEL/TROUGH
405-2.4. RESET/ADJUST MANHOLE FRAME & COVER
405-2.5. SEAL MANHOLE FRAME TO CORBEL CONNECTION WITH POLYUREA MATERIAL
405-3. CEMENTITIOUS COATING SYSTEM
405-3.1. SUBMITTALS
405-3.2. MATERIALS
405-3.2.1. PATCHING MIX
405-3.2.2. INFILTRATION CONTROL
405-3.2.3. GROUTING MIX
405-3.2.4. COATING MIX
405-3.2.5. WATER
405-3.2.6. OTHER MATERIALS
405-3.3. APPLICATION EQUIPMENT
405-3.4. INSTALLATION AND EXECUTION
405-3.4.1. PREPARATION
405-3.4.2. MIXING
405-3.4.3. SPRAYING
405-3.4.4. PREPARATION OF SAMPLES
405-3.4.5. CURING

405-3.5. TESTING AND ACCEPTANCE

405-4. RAVEN 405 EPOXY COATING SYSTEM
405-4.1. SUBMITTALS
405-4.2. MATERIALS
405-4.2.1. PATCHING MIX
405-4.2.2. INFILTRATION CONTROL
405-4.2.3. GROUTING MIX
405-4.2.4. COATING MATERIAL
405-4.2.5. OTHER MATERIALS
405-4.3. INSTALLATION AND EXECUTION
405-4.3.1. PREPARATION
405-4.3.2. APPLICATION

405-4.4. TESTING & ACCEPTANCE

405-5. SPRAYWALL POLYURETHANE COATING SYSTEM
405-5.1. SUBMITTALS
405-5.2. MATERIALS
405-5.2.1. PATCHING MIX
405-5.2.2. INFILTRATION CONTROL
405-5.2.3. GROUTING MIX
405-5.2.4. COATING MATERIAL
405-5.2.5. OTHER MATERIALS
405-5.3. INSTALLATION AND EXECUTION
405-5.3.1. PREPARATION
405-5.3.2. APPLICATION

405-5.4. TESTING & ACCEPTANCE

405-6. INTERNAL MANHOLE CORBEL SEALING SYSTEM
405-6.1. SUBMITTALS
405-6.2. MATERIALS
405-6.2.1. PATCHING MIX
405-6.2.2. INFILTRATION CONTROL
405-6.2.3. COATING MATERIAL
405-6.3. INSTALLATION AND EXECUTION
405-6.3.1. PREPARATION
405-6.3.2. APPLICATION
405-6.3.3. TESTING & ACCEPTANCE
406. SMOKE AND DYE TESTING
406-1. GENERAL PROTOCOL
406-2. REPORTING
406-3. DYE INVESTIGATION
406-3.1. DYE WATER TRACING
406-3.2. DYE WATER FLOODING
406-4. MEASUREMENT AND PAYMENT
406-5. BASIS OF PAYMENT
500 SERIES: POTABLE AND RECLAIMED WATER MAINS, FIRE LINES AND APPURTENANCES
501. SCOPE
502. MATERIALS
502-1. GENERAL
502-2. PIPE MATERIALS AND FITTINGS
502-2.1. DUCTILE IRON PIPE
502-2.1.1. MANUFACTURED RESTRAINED JOINTS FOR DUCTILE IRON PIPE
502-2.1.2. ALTERNATE MECHANICALLY RESTRAINED JOINTS FOR DI PIPE
502-2.1.2.1. Restraints for Ductile Iron Pipe with Mechanical Joint Fittings
502-2.1.2.2. Restraints for Ductile Iron Pipe with Push-on Joints
502-2.1.3. Ductile Iron Pipe Installed with Steel Casings
502-2.1.4. POLYETHYLENE ENCASEMENT FOR BURIED DUCTILE IRON PIPE
502-2.2. POLYVINYL CHLORIDE (PVC) PIPE
502-2.2.1. RESTRAINED JOINT PVC PIPE (DIRECTIONAL BORE)
502-2.3. HIGH DENSITY POLYETHYLENE (HDPE) PIPE
502-2.3.1. MECHANICAL JOINT ADAPTERS (MJ ADPATERS)
502-2.3.2. BUTT FUSION PROCESS AND INSTALLATION
502-2.4. PIPING IDENTIFICATION SYSTEM
502-2.4.1. EXTERIOR MARKINGS FOR BURIED PIPE
502-2.4.2. LOCATION DETECTION WIRE:
502-2.4.3. WARNING TAPE:

502-2.5. RESTRAINED JOINT COUPLINGS

502-3. GATE VALVES
502-4. VALVE BOXES
502-5. HYDRANTS
502-6. SERVICE SADDLES/ POLYETHYLENE SERVICE LINES
502-7. BACKFLOW PREVENTERS
502-8. TAPPING SLEEVES AND LINESTOPS
502-9. LINE STOPPING ASSEMBLIES
502-10. BLOW OFF HYDRANTS
503. CONSTRUCTION
503-1. MATERIAL HANDLING
503-2. PIPE LAYING
503-2.1. INSPECTION PRIOR TO INSTALLATION
503-2.2. GENERAL INSTALLATION REQUIREMENTS
503-2.3. INSTALLATION OF DUCTILE IRON PIPE
503-2.4. INSTALLATION OF POLYVINYL CHLORIDE (PVC) PIPE
503-2.5. DIRECTIONAL BORING INSTALLATION
503-2.5.1. GENERAL REQUIREMENTS
503-2.5.2. SUBMITTALS
503-2.5.3. QUALITY ASSURANCE AND COORDINATION OF WORK
503-2.5.4. HDD PIPE PRODUCTS
503-2.5.5. GENERAL HDD INSTALLATION CONSIDERATION
503-2.5.6. HDD DRILLING EQUIPMENT AND DRILLING FLUID
503-2.5.7. PREPARATION AND MOBILIZATION FOR HDD OPERATIONS
503-2.5.8. ENVIRONMENTAL REQUIREMENTS
503-2.5.9. DRILLING OPERATIONS
503-2.5.10. HDD INSTALLATION
503-2.5.11. DRILLING MUD AND CUTTINGS
503-2.5.12. REAMING AND PULLBACK
503-2.5.13. PIPELINE PROTECTION
503-2.5.14. PIPELINE CLEANING
503-2.5.15. PIPELINE TESTING
503-2.5.16. DISINFECTION FOR HDD POTABLE WATER PIPELINES
503-2.5.17. CITY ACCEPTANCE
503-2.5.18. REPAIR
503-2.5.19. CLEANUP AND REPAIR
503-3. SETTING OF VALVES, HYDRANTS AND FITTINGS
503-3.1. GENERAL
503-3.2. Fittings
503-3.3. VALVES
503-3.4. FIRE HYDRANTS
503-3.5. ANCHORAGE

503-4. CONNECTIONS TO EXISTING POTABLE WATER OR RECLAIMED WATER LINES

504. PIPELINE CLEANING
504-1. PIPELINE PIGGING
504-2. FINAL PIPELINE FLUSHING
505. TESTS
505-1. HYDROSTATIC PIPELINE TESTING
505-2. NOTICE OF TEST
506. DISINFECTION AND TESTING
506-1. DISINFECTION MATERIALS
506-2. FLUSHING SYSTEM
506-3. FINAL DISINFECTION PROCEDURE FOR POTABLE WATER MAINS
506-4. FLUSHING AND RESIDUAL CHLORINE TESTS
506-5. BACTERIALOGICAL TESTS
507. CORRECTION OF NON-CONFORMING WORK
508. OBTAINING WATER FOR FLUSHING AND TESTING
509. MEASUREMENT AND PAYMENT
509-1. GENERAL
509-2. FURNISH AND INSTALL WATER MAINS
509-2.1. MEASUREMENT
509-2.2. PAYMENT
509-3. FURNISH AND INSTALL FITTINGS
509-3.1. MEASUREMENT
509-3.2. PAYMENT
509-4. FURNISH AND INSTALL GATE VALVES COMPLETE WITH BOXES AND COVERS
509-4.1. MEASUREMENT
509-4.2. PAYMENT
509-5. FURNISH AND INSTALL FIRE HYDRANTS
509-5.1. MEASUREMENT
509-5.2. PAYMENT
600 SERIES: STORMWATER
601. RAISING OR LOWERING OF STORM DRAINAGE STRUCTURES
601-1. BASIS OF PAYMENT
602. UNDERDRAINS
602-1. BASIS OF MEASUREMENT
602-2. BASIS OF PAYMENT
603. STORM SEWERS
603-1. TESTING AND INSPECTION
603-2. BASIS OF PAYMENT
604. STORM MANHOLES, INLETS, CATCH BASINS OR OTHER STORM STRUCTURES
604-1. BUILT UP TYPE STRUCTURES
604-2. PRECAST TYPE
604-3. BASIS OF PAYMENT
605. GABIONS AND MATTRESSES
605-1. MATERIAL
605-1.1. PVC COATED WIRE MESH GABIONS & MATTRESSES
605-1.1.1. GABION & MATTRESS BASKETS
605-1.1.2. PVC (POLYVINYL CHLORIDE) COATING
605-1.1.3. GABION AND MATTRESS FILLER MATERIAL
605-1.1.4. GEOTEXTILE FABRIC

605-2. PERFORMANCE

700 SERIES: STREETS AND SIDEWALKS
701. RESTORATION OR REPLACEMENT OF DRIVEWAYS, CURBS, SIDEWALKS AND STREET PAVEMENT
702. ROADWAY BASE AND SUBGRADE
702-1. BASE
702-1.1. BASIS OF MEASUREMENT FOR BASE AND REWORKED BASE
702-1.2. BASIS OF PAYMENT FOR BASE AND REWORKED BASE
702-2. SUBGRADE
702-2.1. BASIS OF MEASUREMENT
702-2.2. BASIS OF PAYMENT
703. ASPHALTIC CONCRETE MATERIALS
703-1. ASPHALTIC CONCRETE
703-1.1. AGGREGATE
703-1.2. BITUMINOUS MATERIALS
703-2. HOT BITUMINOUS MIXTURES – PLANT, METHODS, EQUIPMENT & QUALITY ASSURANCE
703-3. ASPHALT MIX DESIGNS AND TYPES
703-4. ASPHALT PAVEMENT DESIGNS AND LAYER THICKNESS
703-5. GENERAL CONSTRUCTION REQUIREMENTS
703-6. CRACKS AND POTHOLE PREPARATION
703-6.1. CRACKS
703-6.2. POTHOLES
703-7. ADJUSTMENT OF MANHOLES AND APPURTANENCES
703-8. ADDITIONAL ASPHALT REQUIREMENTS
703-9. BASIS OF MEASUREMENT
703-10. BASIS OF PAYMENT
704. ADJUSTMENT TO THE UNIT BID PRICE FOR ASPHALT
705. ASPHALT DRIVEWAYS
705-1. BASIS OF MEASUREMENT
705-2. BASIS OF PAYMENT
706. CONCRETE CURBS
706-1. BASIS OF MEASUREMENT
706-2. BASIS OF PAYMENT
707. CONCRETE SIDEWALKS AND DRIVEWAYS
707-1. CONCRETE SIDEWALKS
707-2. CONCRETE DRIVEWAYS
707-3. CONCRETE CURB RAMPS
707-4. BASIS OF MEASUREMENT
707-5. BASIS OF PAYMENT
708. MILLING OPERATIONS
708-1. EQUIPMENT, CONSTRUCTION & MILLED SURFACE
708-2. ADDITIONAL MILLING REQUIREMENTS
708-3. SALVAGEABLE MATERIALS
708-4. DISPOSABLE MATERIALS
708-5. ADJUSTMENT AND LOCATION OF UNDERGROUND UTILITIES
708-6. ADJUSTMENT OF UTILITY MANHOLES
708-7. TYPES OF MILLING
708-8. MILLING OF INTERSECTIONS
708-9. BASIS OF MEASUREMENT
708-10. BASIS OF PAYMENT
800 SERIES: TRAFFIC SIGNALS, SIGNS AND MARKINGS
801. TRAFFIC SIGNAL EQUIPMENT AND MATERIALS
801-1. BASIS OF MEASUREMENT AND PAYMENT
802. SIGNING AND MARKING
802-1. BASIS OF MEASUREMENT AND PAYMENT
803. ROADWAY LIGHTING
803-1. BASIS OF MEASUREMENT AND PAYMENT
900 SERIES: LANDSCAPING/RESTORATION
901. WORK IN EASEMENTS OR PARKWAYS
902. GENERAL PLANTING SPECIFICATIONS
902-1. IRRIGATION
902-1.1. DESCRIPTION
902-1.1.1. QUALITY ASSURANCE
902-1.1.2. PROJECT CONDITIONS
902-1.1.3. WARRANTY
902-1.2. PRODUCTS
902-1.2.1. GENERAL
902-1.2.2. PIPING
902-1.2.3. PIPE FITTINGS
902-1.2.4. PVC PIPE CEMENT AND PRIMER
902-1.2.5. THREADED CONNECTIONS
902-1.2.6. GATE VALVES
902-1.2.6.1. MANUAL GATE VALVES TWO INCHES (2”) AND SMALLER
902-1.2.6.2. GATE VALVES TWO AND A HALF INCHES (2½”) AND LARGER
902-1.2.7. SLEEVES
902-1.2.8. REMOTE CONTROL VALVES
902-1.2.9. VALVE BOXES
902-1.2.10. AUTOMATIC CONTROL TIMER
902-1.2.11. FIELD TRANSMITTER
902-1.3. EXECUTION
902-1.3.1. GENERAL INSTALLATION REQUIREMENTS
902-1.3.2. EXCAVATING AND BACKFILLING
902-1.3.2.1. TRENCHING - GENERAL
902-1.3.2.2. BACKFILLING
902-1.3.2.3. ROUTING OF PIPING
902-1.3.3. INSTALLATION
902-1.3.3.1. WATER SUPPLY
902-1.3.3.2. ASSEMBLIES
902-1.3.3.3. SLEEVES: (EXISTING BY CITY OF CLEARWATER)
902-1.3.3.4. PLASTIC PIPE
902-1.3.3.5. CONTROLLERS
902-1.3.3.6. REMOTE CONTROL VALVES
902-1.3.3.7. GATE VALVES
902-2. LANDSCAPE
902-2.1. GENERAL
902-2.1.1. REQUIREMENTS OF REGULATORY AGENCIES
902-2.1.2. SCOPE OF WORK
902-2.1.3. QUALITY ASSURANCE
902-2.1.4. SUBMITTALS
902-2.1.5. ALTERNATES, ADDITIONS, DELETIONS, SUBSTITUTIONS
902-2.1.6. ABBREVIATIONS/DEFINITIONS
902-2.1.7. PRODUCT DELIVERY, STORAGE, AND HANDLING
902-2.1.7.1. PLANT MATERIALS
902-2.1.8. JOB CONDITIONS
902-2.1.8.1. ACCEPTANCE OF JOB CONDITIONS.
902-2.1.8.2. SCHEDULING OF WORK
902-2.1.8.3. UTILITIES
902-2.2. PRODUCTS
902-2.2.1. MATERIALS
902-2.2.1.1. PLANT MATERIALS: NOMENCLATURE
902-2.2.1.2. PLANT MATERIALS: QUALITY ASSURANCE
902-2.2.1.3. GRASSES: SOD OR SEED
902-2.2.1.4. MULCH
902-2.2.1.5. STAKES AND GUYS
902-2.2.1.6. PLANTING SOIL
902-2.2.1.7. TREE PROTECTION
902-2.2.1.8. ROOT BARRIER SYSTEM
902-2.2.1.9. PACKAGED MATERIALS
902-2.2.1.10. PESTICIDES
902-2.3. EXECUTION
902-2.3.1. PREPARATION
902-2.3.1.1. OBSTRUCTIONS BELOW GROUND
902-2.3.1.2. GRADING AND PREPARATION FOR PLANT MATERIALS
902-2.3.1.3. PREPARATION FOR ANNUAL BED PLANTING
902-2.3.1.4. PREPARATION FOR SEEDING AND SOD AREAS
902-2.3.2. INSTALLATION
902-2.3.2.1. BERM CONSTRUCTION (IF SPECIFIED)
902-2.3.2.2. LAYOUT OF PLANT MATERIALS
902-2.3.2.3. PLANTING PROCEDURES
902-2.3.2.4. SODDING
902-2.3.2.5. SEEDING
902-2.3.2.6. TREE GUYING, BRACING AND STAKING
902-2.3.2.7. MULCHING
902-2.3.2.8. CLEAN-UP
902-2.3.2.9. PROTECTION
902-2.3.2.10. REPAIR OF DAMAGES
902-2.3.3. MAINTENANCE
902-2.3.4. INSPECTION, REJECTION, AND ACCEPTANCE
902-2.3.4.1. INSPECTION
902-2.3.4.2. REJECTION AND REPLACEMENT
902-2.3.4.3. ACCEPTANCE

902-2.3.5. WARRANTY

903. SODDING
904. SEEDING
905. LAWN MAINTENANCE SPECIFICATIONS
905-1. SCOPE
905-2. SCHEDULING OF WORK
905-3. WORK METHODS
905-3.1. MAINTENANCE SCHEDULING
905-3.2. DUTIES PER SERVICE VISIT
905-3.2.1. LITTER AND DEBRIS
905-3.2.2. VISUAL CHECK
905-3.2.3. PLANT TRIMMING AND PALM PRUNING
905-3.2.3.1. TRAFFIC CONTROL
905-3.2.3.2. PEDESTRIAN SAFETY
905-3.2.4. WEED REMOVAL IN LANDSCAPED AREA
905-3.2.5. MULCH CONDITION
905-3.2.6. IRRIGATION SERVICE AND REPAIR
905-3.2.7. LAWN AND ORNAMENTAL PEST CONTROL
905-3.2.8. PALM FERTILIZATION
905-3.2.9. FREEZE PROTECTION
906. LEVEL OF SERVICE
907. COMPLETION OF WORK
908. INSPECTION AND APPROVAL
909. SPECIAL CONDITIONS
910. TREE PROTECTION
910-1. TREE BARRICADES
910-2. ROOT PRUNING
910-3. PROPER TREE PRUNING
911. IRRIGATION SYSTEM DESIGN
912. IRRIGATION SYSTEM INSTALLATION
SectionV - 2025_0709 6 11 2026.pdf
PUBLIC CONSTRUCTION BOND
CONTRACT
CONSENT OF SURETY TO FINAL PAYMENT
PROPOSAL/BID BOND
AFFIDAVIT
NON-COLLUSION AFFIDAVIT
PROPOSAL
CITY OF CLEARWATER ADDENDUM SHEET
BIDDER’S PROPOSAL
SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM
SCRUTINIZED COMPANIES THAT BOYCOTT ISRAEL LIST CERTIFICATION FORM
Appendix - 2025_0709.pdf
OWNER DIRECT PURCHASE (ODP) DOCUMENTS [if needed]
REQUEST TO REQUISITION FORM
PROJECT PERMITS
GEOTECHNICAL SOIL REPORT
UTILITY WORK SCHEDULES
PAGES Appendix - 2025_0709 - Copy2.pdf
CONTAMINATION SCREENING EVALUATION REPORT
Appendix - 2025_0709a.pdf
VERIFICATION OF EMPLOYMENT ELIGIBILITY FORM
OWNER DIRECT PURCHASE (ODP) DOCUMENTS (Not Applicable)
Owner Direct Purchase (ODP) Instructions
SectionV - 2025_0709 6 11 2026.pdf
PUBLIC CONSTRUCTION BOND
CONTRACT
CONSENT OF SURETY TO FINAL PAYMENT
PROPOSAL/BID BOND
AFFIDAVIT
NON-COLLUSION AFFIDAVIT
PROPOSAL
CITY OF CLEARWATER ADDENDUM SHEET
BIDDER’S PROPOSAL
SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM
SCRUTINIZED COMPANIES THAT BOYCOTT ISRAEL LIST CERTIFICATION FORM
section-iv_6_11_2026.pdf
100 SERIES: GENERAL
101. SCOPE OF WORK
102. FIELD ENGINEERING
102-1. LINE AND GRADE PERFORMED BY THE CONTRACTOR
102-1.1. GRADES, LINES AND LEVELS
102-1.2. LAYOUT DATA

102-2. LINE AND GRADE PERFORMED BY THE CITY

103. DEFINITION OF TERMS
103-1. REFERENCE STANDARDS
104. STREET CROSSINGS, ETC.
105. AUDIO/VIDEO RECORDING OF WORK AREAS
105-1. CONTRACTOR TO PREPARE AUDIO/VIDEO RECORDING
105-2. SCHEDULING OF AUDIO/VIDEO RECORDING
105-3. PROFESSIONAL VIDEOGRAPHERS
105-4. EQUIPMENT
105-5. RECORDED AUDIO INFORMATION
105-6. RECORDED VIDEO INFORMATION
105-7. VIEWER ORIENTATION
105-8. LIGHTING
105-9. SPEED OF TRAVEL
105-10. VIDEO LOG/INDEX
105-11. AREA OF COVERAGE
105-12. COSTS OF VIDEO SERVICES
106. STREET SIGNS
107. WORK ZONE TRAFFIC CONTROL
107-1. CONTRACTOR RESPONSIBLE FOR WORK ZONE TRAFFIC CONTROL
107-2. WORK ZONE TRAFFIC CONTROL PLAN
107-2.1. WORK ZONE SAFETY
107-3. ROADWAY CLOSURE GUIDELINES
107-3.1. ALL ROADWAYS
107-3.1.1. PUBLIC NOTIFICATION
107-3.2. MAJOR ARTERIALS, MINOR ARTERIALS, LOCAL COLLECTORS
107-3.2.1. PUBLIC NOTIFICATION
107-3.3. MAJOR ARTERIALS, MINOR ARTERIALS
107-3.3.1. PUBLIC NOTIFICATION
107-3.4. MAJOR ARTERIALS
107-3.4.1. PUBLIC NOTIFICATION
107-4. APPROVAL OF WORK ZONE TRAFFIC CONTROL PLAN
107-5. INSPECTION OF WORK ZONE TRAFFIC CONTROL OPERATION
107-6. PAYMENT FOR WORK ZONE TRAFFIC CONTROL
107-7. CERTIFICATION OF WORK ZONE TRAFFIC CONTROL SUPERVISOR
108. OVERHEAD ELECTRIC LINE CLEARANCE
108-1. CLEARANCE OPTIONS
108-2. REQUIRED MINIMUM CLEARANCE DISTANCES
200 SERIES: SITEWORK
201. EXCAVATION FOR UNDERGROUND INFRASTRUCTURE WORK
201-1. EXCAVATION, BACKFILLING, AND COMPACTION FOR UNDERGROUND INFRASTRUCTURE
201-1.1. GENERAL
201-1.2. MATERIALS
201-1.3. CLEARING AND GRUBBING
201-1.3.1. GENERAL
201-1.3.2. CLEARING AND GRUBBING OPERATIONS
201-1.3.3. DISPOSAL OF DEBRIS MATERIAL
201-1.3.4. PRESERVATION OF TREES AND SHRUBBERY
201-1.3.5. PRESERVATION OF DEVELOPED PRIVATE PROPERTY
201-1.3.6. PRESERVATION OF PUBLIC PROPERTY
201-1.4. EXCAVATION PROTECTION
201-1.4.1. SHEETING AND BRACING
201-1.5. EXCAVATING FOR UTILITY STRUCTURES
201-1.6. TRENCH EXCAVATION FOR UTILITY PIPELINES
201-1.6.1. TRENCH EXCAVATION FOR PIPE LAYING - GENERAL
201-1.6.2. LIMITED TRENCH WIDTHS
201-1.6.3. MECHANICAL EXCAVATION
201-1.6.4. PAVEMENT CUTTING
201-1.6.5. ARTIFICIAL FOUNDATIONS IN TRENCHES
201-1.6.6. BELL HOLES
201-1.7. UNDERCUT OF EXCAVATIONS
201-1.8. STABILIZATION OF EXCAVATIONS
201-1.9. BACKFILL AND COMPACTION
201-1.9.1. MATERIALS
201-1.9.2. BACKFILL PLACEMENT AND COMPACTION
201-1.9.3. STRUCTURE FOUNDATION PREPARATION
201-1.10. DRAINAGE FROM EXCAVATIONS
201-1.11. FINAL GRADING
201-1.12. EXCESS EXCAVATED MATERIAL
201-1.13. SETTLEMENT
202. OBSTRUCTIONS
203. DEWATERING
203-1. GENERAL
203-1.1. Definition of Terms for Dewatering System
203-2. OBSERVATION WELLS
203-3. PUMPING AND DRAINAGE - GENERAL
203-3.1. DEWATERING EQUIPMENT
203-3.2. DEWATERING CONSIDERATIONS
203-3.3. DISPOSAL OF PUMPED WATER
203-3.4. GROUNDWATER TREATMENT (IF REQUIRED)

203-4. PERMIT REQUIREMENTS

204. UNSUITABLE MATERIAL REMOVAL
204-1. BASIS OF MEASUREMENT
204-2. BASIS OF PAYMENT
205. UTILITY TIE IN LOCATION MARKING
206. CLEARING AND GRUBBING
206-1. BASIS OF MEASUREMENT
206-2. BASIS OF PAYMENT
207. EROSION AND SEDIMENT CONTROL
207-1. GENERAL
207-2. TRAINING OF PERSONNEL
207-3. STABILIZATION OF DENUDED AREAS
207-4. PROTECTION AND STABILIZATION OF SOIL STOCKPILES
207-5. PROTECTION OF EXISTING STORM SEWER SYSTEMS
207-6. SWALES, DITCHES AND CHANNELS
207-7. UNDERGROUND UTILITY CONSTRUCTION
207-8. MAINTENANCE
207-9. COMPLIANCE
208. CONSTRUCTION AND REPAIR OF SEAWALLS AND OTHER BEACH EROSION CONTROL STRUCTURES
208-1. EXISTING SEAWALLS AND REVETMENTS
208-2. TOP OF CAP ELEVATION
208-3. SEAWALLS AND REVETMENTS LOCATED SEAWARD OF THE CCL
208-4. PLACEMENT OF NEW SEAWALL
208-5. POST CONSTRUCTION SURVEY
208-6. RIP-RAP
208-7. RETAINING WALL IN LIEU OF VERTICAL SEAWALL
209. MAINTENANCE OF OPERATIONS
209-1. GENERAL
209-2. EXECUTION
209-3. BASIS OF MEASUREMENT
210. DETECTION OF FACILITIES
211. RELOCATIONS
211-1. RELOCATION SHOWN ON DRAWINGS
211-2. RELOCATIONS NOT SHOWN ON DRAWINGS
212. RESTORATION PROCEDURES
212-1. INTERIM RESTORATION
212-2. FINAL RESTORATION
300 SERIES: MATERIALS
301. CONCRETE
302. EXCAVATION AND FORMS FOR CONCRETE WORK
302-1. EXCAVATION
302-2. FORMS
303. REINFORCEMENT
303-1. BASIS OF PAYMENT
304. BACKFILL
304-1. MATERIALS AND GENERAL
304-2. TESTING AND INSPECTION
305. RIPRAP
305-1. BASIS OF MEASUREMENT
305-2. BASIS OF PAYMENT
306. FLOWABLE FILL
307. MATERIAL INDEPENDENT TESTING
400 SERIES: SANITARY SEWER
401. SANITARY MANHOLES
401-1. BUILT UP TYPE
401-2. PRECAST TYPE
401-2.1. MANHOLE ADJUSTMENT RINGS (GRADE RINGS)
401-2.2. STAINLESS STEEL MANHOLE STORM WATER INFLOW ABATEMENT INSERTS (DISH/PAN)
401-2.2.1. MATERIALS AND DESIGN
401-2.2.2. MEASUREMENT AND PAYMENT
401-3. DROP MANHOLES
401-4. FRAMES AND COVERS
401-5. MANHOLE COATINGS
401-6. CONNECTIONS TO MANHOLES
401-7. MEASUREMENT AND PAYMENT
402. RAISING OR LOWERING OF SANITARY SEWER STRUCTURES
402-1. BASIS OF PAYMENT
403. SANITARY SEWERS AND FORCE MAINS
403-1. MATERIALS
403-1.1. GRAVITY SEWER PIPE
403-1.2. FORCE MAIN PIPE
403-2. INSTALLATION
403-2.1. GRAVITY SEWER PIPE
403-2.2. FORCE MAIN PIPE
403-3. INSPECTIONS OF LINES AND MANHOLES
403-4. TESTING
403-4.1. TESTING OF GRAVITY SEWERS
403-4.2. TESTING OF FORCE MAINS
403-5. BASIS OF PAYMENT
403-5.1. GRAVITY SEWER PIPE
403-5.2. FORCE MAIN PIPE PAYMENT
404. CURED-IN-PLACE PIPE SANITARY SEWER REHABILITATION
404-1. GENERAL
404-2. MEASUREMENT & PAYMENT
404-3. SUBMITTALS
404-4. CURED-IN-PLACE PIPE (CIPP) FOR GRAVITY SEWER MAINS
404-4.1. LINER MATERIAL
404-4.2. CHEMICAL JOINT, CRACK AND ANNULAR SPACE SEALING MATERIALS FOR ACTIVE LEAKS AND SERVICE LATERAL CONNECTIONS
404-4.3. MANHOLE CONNECTIONS
404-4.4. INSTALLATION AND EXECUTION
404-4.4.1. CLEANING/SURFACE PREPARATION
404-4.4.2. TELEVISION INSPECTION
404-4.4.2.1. IMAGE (PHOTOS) CAPTURE FORMAT AND REQUIREMENTS
404-4.4.2.2. DIGITAL VIDEO FORMAT AND REQUIREMENTS
404-4.4.2.3. SYNCHRONIZATION
404-4.4.3. LINER INSTALLATION
404-4.4.4. LATERAL RECONNECTION
404-4.4.5. TIME OF CONSTRUCTION
404-4.4.6. TESTING AND ACCEPTANCE
404-4.4.7. CLEANUP
404-5. CURED-IN-PLACE PIPE (CIPP) FOR SERVICE LATERALS
404-5.1. LINER MATERIAL
404-5.2. EPOXY RESIN MATERIAL
404-5.3. INSTALLATION AND EXECUTION
404-5.3.1. PRE-LINING INSPECTION
404-5.3.2. LATERAL PREPARATION
404-5.3.3. LINER INSTALLATION
404-5.3.4. TESTING AND ACCEPTANCE
405. SANITARY MANHOLE LINER RESTORATION
405-1. SCOPE AND INTENT
405-2. MEASUREMENT & PAYMENT
405-2.1. MANHOLE LINERS/COATING
405-2.2. REPLACE FRAME & COVER
405-2.3. REBUILD BENCH & CHANNEL/TROUGH
405-2.4. RESET/ADJUST MANHOLE FRAME & COVER
405-2.5. SEAL MANHOLE FRAME TO CORBEL CONNECTION WITH POLYUREA MATERIAL
405-3. CEMENTITIOUS COATING SYSTEM
405-3.1. SUBMITTALS
405-3.2. MATERIALS
405-3.2.1. PATCHING MIX
405-3.2.2. INFILTRATION CONTROL
405-3.2.3. GROUTING MIX
405-3.2.4. COATING MIX
405-3.2.5. WATER
405-3.2.6. OTHER MATERIALS
405-3.3. APPLICATION EQUIPMENT
405-3.4. INSTALLATION AND EXECUTION
405-3.4.1. PREPARATION
405-3.4.2. MIXING
405-3.4.3. SPRAYING
405-3.4.4. PREPARATION OF SAMPLES
405-3.4.5. CURING

405-3.5. TESTING AND ACCEPTANCE

405-4. RAVEN 405 EPOXY COATING SYSTEM
405-4.1. SUBMITTALS
405-4.2. MATERIALS
405-4.2.1. PATCHING MIX
405-4.2.2. INFILTRATION CONTROL
405-4.2.3. GROUTING MIX
405-4.2.4. COATING MATERIAL
405-4.2.5. OTHER MATERIALS
405-4.3. INSTALLATION AND EXECUTION
405-4.3.1. PREPARATION
405-4.3.2. APPLICATION

405-4.4. TESTING & ACCEPTANCE

405-5. SPRAYWALL POLYURETHANE COATING SYSTEM
405-5.1. SUBMITTALS
405-5.2. MATERIALS
405-5.2.1. PATCHING MIX
405-5.2.2. INFILTRATION CONTROL
405-5.2.3. GROUTING MIX
405-5.2.4. COATING MATERIAL
405-5.2.5. OTHER MATERIALS
405-5.3. INSTALLATION AND EXECUTION
405-5.3.1. PREPARATION
405-5.3.2. APPLICATION

405-5.4. TESTING & ACCEPTANCE

405-6. INTERNAL MANHOLE CORBEL SEALING SYSTEM
405-6.1. SUBMITTALS
405-6.2. MATERIALS
405-6.2.1. PATCHING MIX
405-6.2.2. INFILTRATION CONTROL
405-6.2.3. COATING MATERIAL
405-6.3. INSTALLATION AND EXECUTION
405-6.3.1. PREPARATION
405-6.3.2. APPLICATION
405-6.3.3. TESTING & ACCEPTANCE
406. SMOKE AND DYE TESTING
406-1. GENERAL PROTOCOL
406-2. REPORTING
406-3. DYE INVESTIGATION
406-3.1. DYE WATER TRACING
406-3.2. DYE WATER FLOODING
406-4. MEASUREMENT AND PAYMENT
406-5. BASIS OF PAYMENT
500 SERIES: POTABLE AND RECLAIMED WATER MAINS, FIRE LINES AND APPURTENANCES
501. SCOPE
502. MATERIALS
502-1. GENERAL
502-2. PIPE MATERIALS AND FITTINGS
502-2.1. DUCTILE IRON PIPE
502-2.1.1. MANUFACTURED RESTRAINED JOINTS FOR DUCTILE IRON PIPE
502-2.1.2. ALTERNATE MECHANICALLY RESTRAINED JOINTS FOR DI PIPE
502-2.1.2.1. Restraints for Ductile Iron Pipe with Mechanical Joint Fittings
502-2.1.2.2. Restraints for Ductile Iron Pipe with Push-on Joints
502-2.1.3. Ductile Iron Pipe Installed with Steel Casings
502-2.1.4. POLYETHYLENE ENCASEMENT FOR BURIED DUCTILE IRON PIPE
502-2.2. POLYVINYL CHLORIDE (PVC) PIPE
502-2.2.1. RESTRAINED JOINT PVC PIPE (DIRECTIONAL BORE)
502-2.3. HIGH DENSITY POLYETHYLENE (HDPE) PIPE
502-2.3.1. MECHANICAL JOINT ADAPTERS (MJ ADPATERS)
502-2.3.2. BUTT FUSION PROCESS AND INSTALLATION
502-2.4. PIPING IDENTIFICATION SYSTEM
502-2.4.1. EXTERIOR MARKINGS FOR BURIED PIPE
502-2.4.2. LOCATION DETECTION WIRE:
502-2.4.3. WARNING TAPE:

502-2.5. RESTRAINED JOINT COUPLINGS

502-3. GATE VALVES
502-4. VALVE BOXES
502-5. HYDRANTS
502-6. SERVICE SADDLES/ POLYETHYLENE SERVICE LINES
502-7. BACKFLOW PREVENTERS
502-8. TAPPING SLEEVES AND LINESTOPS
502-9. LINE STOPPING ASSEMBLIES
502-10. BLOW OFF HYDRANTS
503. CONSTRUCTION
503-1. MATERIAL HANDLING
503-2. PIPE LAYING
503-2.1. INSPECTION PRIOR TO INSTALLATION
503-2.2. GENERAL INSTALLATION REQUIREMENTS
503-2.3. INSTALLATION OF DUCTILE IRON PIPE
503-2.4. INSTALLATION OF POLYVINYL CHLORIDE (PVC) PIPE
503-2.5. DIRECTIONAL BORING INSTALLATION
503-2.5.1. GENERAL REQUIREMENTS
503-2.5.2. SUBMITTALS
503-2.5.3. QUALITY ASSURANCE AND COORDINATION OF WORK
503-2.5.4. HDD PIPE PRODUCTS
503-2.5.5. GENERAL HDD INSTALLATION CONSIDERATION
503-2.5.6. HDD DRILLING EQUIPMENT AND DRILLING FLUID
503-2.5.7. PREPARATION AND MOBILIZATION FOR HDD OPERATIONS
503-2.5.8. ENVIRONMENTAL REQUIREMENTS
503-2.5.9. DRILLING OPERATIONS
503-2.5.10. HDD INSTALLATION
503-2.5.11. DRILLING MUD AND CUTTINGS
503-2.5.12. REAMING AND PULLBACK
503-2.5.13. PIPELINE PROTECTION
503-2.5.14. PIPELINE CLEANING
503-2.5.15. PIPELINE TESTING
503-2.5.16. DISINFECTION FOR HDD POTABLE WATER PIPELINES
503-2.5.17. CITY ACCEPTANCE
503-2.5.18. REPAIR
503-2.5.19. CLEANUP AND REPAIR
503-3. SETTING OF VALVES, HYDRANTS AND FITTINGS
503-3.1. GENERAL
503-3.2. Fittings
503-3.3. VALVES
503-3.4. FIRE HYDRANTS
503-3.5. ANCHORAGE

503-4. CONNECTIONS TO EXISTING POTABLE WATER OR RECLAIMED WATER LINES

504. PIPELINE CLEANING
504-1. PIPELINE PIGGING
504-2. FINAL PIPELINE FLUSHING
505. TESTS
505-1. HYDROSTATIC PIPELINE TESTING
505-2. NOTICE OF TEST
506. DISINFECTION AND TESTING
506-1. DISINFECTION MATERIALS
506-2. FLUSHING SYSTEM
506-3. FINAL DISINFECTION PROCEDURE FOR POTABLE WATER MAINS
506-4. FLUSHING AND RESIDUAL CHLORINE TESTS
506-5. BACTERIALOGICAL TESTS
507. CORRECTION OF NON-CONFORMING WORK
508. OBTAINING WATER FOR FLUSHING AND TESTING
509. MEASUREMENT AND PAYMENT
509-1. GENERAL
509-2. FURNISH AND INSTALL WATER MAINS
509-2.1. MEASUREMENT
509-2.2. PAYMENT
509-3. FURNISH AND INSTALL FITTINGS
509-3.1. MEASUREMENT
509-3.2. PAYMENT
509-4. FURNISH AND INSTALL GATE VALVES COMPLETE WITH BOXES AND COVERS
509-4.1. MEASUREMENT
509-4.2. PAYMENT
509-5. FURNISH AND INSTALL FIRE HYDRANTS
509-5.1. MEASUREMENT
509-5.2. PAYMENT
600 SERIES: STORMWATER
601. RAISING OR LOWERING OF STORM DRAINAGE STRUCTURES
601-1. BASIS OF PAYMENT
602. UNDERDRAINS
602-1. BASIS OF MEASUREMENT
602-2. BASIS OF PAYMENT
603. STORM SEWERS
603-1. TESTING AND INSPECTION
603-2. BASIS OF PAYMENT
604. STORM MANHOLES, INLETS, CATCH BASINS OR OTHER STORM STRUCTURES
604-1. BUILT UP TYPE STRUCTURES
604-2. PRECAST TYPE
604-3. BASIS OF PAYMENT
605. GABIONS AND MATTRESSES
605-1. MATERIAL
605-1.1. PVC COATED WIRE MESH GABIONS & MATTRESSES
605-1.1.1. GABION & MATTRESS BASKETS
605-1.1.2. PVC (POLYVINYL CHLORIDE) COATING
605-1.1.3. GABION AND MATTRESS FILLER MATERIAL
605-1.1.4. GEOTEXTILE FABRIC

605-2. PERFORMANCE

700 SERIES: STREETS AND SIDEWALKS
701. RESTORATION OR REPLACEMENT OF DRIVEWAYS, CURBS, SIDEWALKS AND STREET PAVEMENT
702. ROADWAY BASE AND SUBGRADE
702-1. BASE
702-1.1. BASIS OF MEASUREMENT FOR BASE AND REWORKED BASE
702-1.2. BASIS OF PAYMENT FOR BASE AND REWORKED BASE
702-2. SUBGRADE
702-2.1. BASIS OF MEASUREMENT
702-2.2. BASIS OF PAYMENT
703. ASPHALTIC CONCRETE MATERIALS
703-1. ASPHALTIC CONCRETE
703-1.1. AGGREGATE
703-1.2. BITUMINOUS MATERIALS
703-2. HOT BITUMINOUS MIXTURES – PLANT, METHODS, EQUIPMENT & QUALITY ASSURANCE
703-3. ASPHALT MIX DESIGNS AND TYPES
703-4. ASPHALT PAVEMENT DESIGNS AND LAYER THICKNESS
703-5. GENERAL CONSTRUCTION REQUIREMENTS
703-6. CRACKS AND POTHOLE PREPARATION
703-6.1. CRACKS
703-6.2. POTHOLES
703-7. ADJUSTMENT OF MANHOLES AND APPURTANENCES
703-8. ADDITIONAL ASPHALT REQUIREMENTS
703-9. BASIS OF MEASUREMENT
703-10. BASIS OF PAYMENT
704. ADJUSTMENT TO THE UNIT BID PRICE FOR ASPHALT
705. ASPHALT DRIVEWAYS
705-1. BASIS OF MEASUREMENT
705-2. BASIS OF PAYMENT
706. CONCRETE CURBS
706-1. BASIS OF MEASUREMENT
706-2. BASIS OF PAYMENT
707. CONCRETE SIDEWALKS AND DRIVEWAYS
707-1. CONCRETE SIDEWALKS
707-2. CONCRETE DRIVEWAYS
707-3. CONCRETE CURB RAMPS
707-4. BASIS OF MEASUREMENT
707-5. BASIS OF PAYMENT
708. MILLING OPERATIONS
708-1. EQUIPMENT, CONSTRUCTION & MILLED SURFACE
708-2. ADDITIONAL MILLING REQUIREMENTS
708-3. SALVAGEABLE MATERIALS
708-4. DISPOSABLE MATERIALS
708-5. ADJUSTMENT AND LOCATION OF UNDERGROUND UTILITIES

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .