SECTION IIA – SUPPLEMENTAL INSTRUCTION TO BIDDERS
SECTION IIA Page 1 of 2 Updated 7/9/2025
SECTION IIA
CITY OF CLEARWATER, FLORIDA
PUBLIC WORKS DEPARTMENT
SUPPLEMENTAL INSTRUCTION TO BIDDERS – SUMMARY (SECTION IIA)
GENERAL
This document provides Section IIA – Supplemental Instructions to Bidders for the Osceola Corridor Improvements Project. These provisions modify and supplement the Instruction To Bidders and establish coordination-driven requirements for project execution.
1. SUBMITTAL REQUIREMENTS
Each Firm being considered for this Project is required to submit a Technical Proposal. The Proposal shall include sufficient information to enable the City to evaluate the Firm's capability to provide the desired services for the Project.
Proposals shall be submitted in accordance with the instructions provided in the RFP package, which is available at: https://www.myclearwater.com/business/rfp.
It is solely the contractor Firm's responsibility to ensure that the City’s server receives the Technical Proposal by the due date and time. Bookmarks linking content within the Technical Proposal are allowed. Bookmarks that provide links to information not included within the content of the Technical Proposal shall not be utilized. No macros will be allowed. All Proposal documents shall be identified with the project name and the City’s project number as defined in the RFP.
The maximum number of pages for the written technical proposal shall be limited to four (4) 8½" x 11" pages with a minimum font size of ten (10), single-sided, typed pages, including text, graphics, tables, charts, and photographs. Double-sided 8½" x 11" sheets will be counted as 2 pages. Larger sheets are prohibited.
The minimum information is to be included:
Section 1: Written Technical Proposal
• Approach and Understanding of the Project:
Present a plan to complete the specified work while following the Supplemental General Conditions as outlined in Section IIIA. The plan should address all significant design and construction issues and constraints, and demonstrate efficient use of manpower, materials, equipment, construction schemes, and techniques to complete the project. Coordination with the City on public involvement, Maintenance of Traffic experience, and affected utilities shall also be discussed in this section.
• Minimum Qualifications:
Respondents shall demonstrate:
A list of three (3) comparable projects as the prime contractor completed within the State of Florida during the past five (5) years.
https://www.myclearwater.com/business/rfp
SECTION IIA – SUPPLEMENTAL INSTRUCTION TO BIDDERS
SECTION IIA Page 2 of 2 Updated 7/9/2025
A minimum of five (5) client references, including at least three (3) public sector projects performed during the past five (5) years.
• Staffing:
Contractor Name & Applicable Prequalification Work Classes Construction Project Manager Construction Superintendent QC Representative/Company Subcontractors Name(s) and Applicable Prequalified Work Types MOT/Traffic Supervisor
• Responsible Office:
Firms being considered for this Project may have more than one office location.
The office assigned responsibility for the work shall be identified in the Technical Proposal. If different elements of the work are done at different locations, those locations shall be listed.
END OF DOCUMENT
| Osceola Avenue Corridor Improvements |
| 22-0017-EN |
| CONTRACT DOCUMENTS & SPECIFICATIONS |
| Prepared for |
| Final Design |
| JUNE/2026 City of Clearwater, Florida |
| Osceola Avenue Corridor Improvements |
| (22-0017-EN) |
| TABLE OF CONTENTS |
| SECTION I ADVERTISEMENT OF BIDS & NOTICE TO CONTRACTORS |
| SECTION II INSTRUCTIONS TO BIDDERS |
| SECTION IIA SUPPLEMENTAL INSTRUCTIONS TO BIDDERS |
| SECTION III GENERAL CONDITIONS |
| SECTION IIIA SUPPLEMENTAL GENERAL CONDITIONS |
| SECTION IV TECHNICAL SPECIFICATIONS |
| SECTION IVA SUPPLEMENTAL TECHNICAL SPECIFICATIONS |
| SECTION V CONTRACT DOCUMENTS |
| APPENDIX ODP DOCUMENTS AND OTHER PROJECT DOCUMENTATION |
| SectionI - 2025_0709.pdf |
| INVITATION TO BID NOTICE TO CONTRACTORS |
| SectionII - 2025_0709.pdf |
| SECTION II |
| INSTRUCTIONS TO BIDDERS |
| 1. COPIES OF BIDDING DOCUMENTS |
| 2. QUALIFICATION OF BIDDERS |
| 3. EXAMINATION OF CONTRACT DOCUMENTS AND SITE |
| 4. INTERPRETATIONS AND ADDENDA |
| 5. BID SECURITY OR BID BOND |
| 6. CONTRACT TIME |
| 7. LIQUIDATED DAMAGES |
| 8. SUBSTITUTE MATERIAL AND EQUIPMENT |
| 9. SUBCONTRACTORS |
| 10. BID/PROPOSAL FORM |
| 11. SUBMISSION OF BIDS |
| 12. MODIFICATION AND WITHDRAWAL OF BIDS |
| 13. REJECTION OF BIDS |
| 14. DISQUALIFICATION OF BIDDER |
| 15. OPENING OF BIDS |
| 16. LICENSES, PERMITS, ROYALTY FEES AND TAXES |
| 17. IDENTICAL TIE BIDS/VENDOR DRUG FREE WORKPLACE |
| 18. AWARD OF CONTRACT |
| 19. BID PROTEST |
| 20. TRENCH SAFETY ACT |
| 21. CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL MANAGEMENT MEASURES |
| SectionIII - 2025_0709.pdf |
| 1. DEFINITIONS |
| 2. PRELIMINARY MATTERS |
| 2.1. DELIVERY OF BONDS AND CERTIFICATES OF INSURANCE |
| 2.2. COPIES OF DOCUMENTS |
| 2.3. COMMENCEMENT OF CONTRACT TIME/NOTICE TO PROCEED, STARTING THE PROJECT |
| 2.4. BEFORE STARTING CONSTRUCTION |
| 2.5. PRECONSTRUCTION CONFERENCE |
| 2.6. PROGRESS MEETINGS |
| 3. CONTRACT DOCUMENTS, INTENT |
| 3.1. INTENT |
| 3.2. REPORTING AND RESOLVING DISCREPANCIES |
| 4. AVAILABILITY OF LANDS, SUBSURFACE AND PHYSICAL CONDITIONS, REFERENCE POINTS |
| 4.1. AVAILABILITY OF LANDS |
| 4.2. INVESTIGATIONS AND REPORTS |
| 4.3. PHYSICAL CONDITIONS, UNDERGROUND FACILITIES |
| 4.4. REFERENCE POINTS |
| 5. BONDS AND INSURANCE |
| 5.1. PERFORMANCE AND PAYMENT BOND/CONTRACT BOND |
| 5.2. INSURANCE REQUIREMENTS |
| 5.2.1. COMMERCIAL GENERAL LIABILITY INSURANCE |
| 5.2.2. COMMERCIAL AUTOMOBILE LIABILITY INSURANCE |
| 5.2.3. WORKERS’ COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE |
| 5.2.4. PROFESSIONAL LIABILITY/MALPRACTICE/ERRORS OR OMISSIONS INSURANCE |
| 5.2.5. CONTRACTOR’S EQUIPMENT/INLAND MARINE/PROPERTY INSURANCE |
| 5.2.6. BUILDER’S RISK INSURANCE |
| 5.3. OTHER INSURANCE PROVISIONS |
| 5.4. WAIVER OF RIGHTS |
| 6. CONTRACTOR’S RESPONSIBILITIES |
| 6.1. SUPERVISION AND SUPERINTENDENCE |
| 6.2. LABOR, MATERIALS AND EQUIPMENT |
| 6.3. SUBSTITUTES AND "OR EQUAL" ITEMS |
| 6.4. SUBCONTRACTORS, SUPPLIERS AND OTHERS |
| 6.5. USE OF PREMISES |
| 6.5.1. STAGING AREAS |
| 6.5.2. RESTORATION TIME LIMITS |
| 6.6. LICENSE AND PATENT FEES, ROYALTIES AND TAXES |
| 6.7. LAWS AND REGULATIONS |
| 6.7.1. E-VERIFY |
| 6.8. PERMITS |
| 6.9. SAFETY AND PROTECTION |
| 6.10. EMERGENCIES |
| 6.11. DRAWINGS |
| 6.11.1. SHOP DRAWINGS, SAMPLES, RFIs, AND SUBMITTAL REVIEW |
| 6.11.2. AS-BUILT DRAWINGS |
| 6.11.2.1. General |
| 6.11.2.2. Sanitary and Storm Sewer Piping Systems |
| 6.11.2.3. Pressure Pipe construction (Water, Reclaimed Water, Force Main) |
| 6.11.2.4. Electrical and Control Wiring |
| 6.11.2.5. Horizontal and Vertical Control |
| 6.11.2.6. Standards |
| 6.11.2.7. Other |
| 6.11.3. CAD STANDARDS |
| 6.11.3.1. Layer Naming |
| 6.11.3.1.1. Prefixes and Suffixes |
| 6.11.3.1.2. Layer Naming Definitions: |
| 6.11.3.2. Layer Properties |
| 6.11.3.3. Text Styles |
6.11.4. DELIVERABLES
| 6.12. CONTRACTOR'S GENERAL WARRANTY AND GUARANTEE |
| 6.13. CONTINUING THE WORK |
| 6.14. INDEMNIFICATION |
| 6.15. CHANGES IN COMPANY CONTACT INFORMATION |
| 6.16. PUBLIC RECORDS |
| 7. OTHER WORK |
| 7.1. RELATED WORK AT SITE |
| 7.2. COORDINATION |
| 8. OWNER’S RESPONSIBILITY |
| 9. OWNER REPRESENTATIVE’S STATUS DURING CONSTRUCTION |
| 9.1. OWNER’S REPRESENTATIVE |
| 9.2. CLARIFICATIONS AND INTERPRETATIONS |
| 9.3. REJECTING OF DEFECTIVE WORK |
| 9.4. SHOP DRAWINGS, CHANGE ORDERS, AND PAYMENTS |
| 9.5. DECISIONS ON DISPUTES |
| 9.6. LIMITATIONS ON OWNER REPRESENTATIVE'S RESPONSIBILITIES |
| 10. CHANGES IN THE WORK |
| 11. CHANGES IN THE CONTRACT PRICE |
| 11.1. CHANGES IN THE CONTRACT PRICE |
| 11.2. ALLOWANCES AND FINAL CONTRACT PRICE ADJUSTMENT |
| 11.3. UNIT PRICE WORK |
| 12. CHANGES IN CONTRACT TIME |
| 13. TESTS AND INSPECTIONS, CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK |
| 13.1. TESTS AND INSPECTION |
| 13.2. UNCOVERING THE WORK |
| 13.3. OWNER’S REPRESENTATIVE MAY STOP THE WORK |
| 13.4. CORRECTION OR REMOVAL OF DEFECTIVE WORK |
| 13.5. WARRANTY/CORRECTION PERIOD |
| 13.6. ACCEPTANCE OF DEFECTIVE WORK |
| 13.7. OWNER MAY CORRECT DEFECTIVE WORK |
| 14. PAYMENTS TO CONTRACTOR AND COMPLETION |
| 14.1. APPLICATION FOR PROGRESS PAYMENT |
| 14.2. CONTRACTOR'S WARRANTY OF TITLE |
| 14.3. REVIEW OF APPLICATIONS FOR PROGRESS PAYMENTS |
| 14.4. PARTIAL UTILIZATION |
| 14.5. FINAL INSPECTION |
| 14.6. FINAL APPLICATION FOR PAYMENT |
| 14.7. FINAL PAYMENT AND ACCEPTANCE |
| 14.8. WAIVER OF CLAIMS |
| 15. SUSPENSION OF WORK AND TERMINATION |
| 15.1. OWNER MAY SUSPEND THE WORK |
| 15.2. OWNER MAY TERMINATE |
| 15.3. CONTRACTOR MAY STOP WORK OR TERMINATE |
| 16. DISPUTE RESOLUTION |
| 17. MISCELLANEOUS |
| 17.1. SUBMITTAL AND DOCUMENT FORMS |
| 17.2. GIVING NOTICE |
| 17.3. NOTICE OF CLAIM |
| 17.4. PROFESSIONAL FEES AND COURT COSTS INCLUDED |
| 17.5. ASSIGNMENT OF CONTRACT |
| 17.6. RENEWAL OPTION |
| 17.7. ROLL-OFF CONTAINERS AND/OR DUMPSTERS |
| 18. ORDER AND LOCATION OF THE WORK |
| 19. MATERIAL USED |
| 20. CONFLICT BETWEEN PLANS AND SPECIFICATIONS |
| 21. OWNER DIRECT PURCHASE (ODP) |
| 21.1. SALES TAX SAVINGS |
| 21.2. TITLE AND OWNER RISK |
| 21.3. CONTRACTOR’S RECEIPT OF MATERIALS |
| 21.4. ODP RECORDS, WARRANTIES, AND INDEMNIFICATION |
| 22. RESIDENT NOTIFICATION OF START OF CONSTRUCTION |
| 22.1. GENERAL |
| 22.2. EXAMPLE |
| 23. PROJECT INFORMATION SIGNS |
| 23.1. SCOPE AND PURPOSE |
| 23.2. PROJECT SIGN, FIXED OR PORTABLE |
| 23.3. FIXED SIGN |
| 23.4. PORTABLE SIGNS |
| 23.5. SIGN COLORING |
| 23.6. SIGN PLACEMENT |
| 23.7. SIGN MAINTENANCE |
| 23.8. TYPICAL PROJECT SIGN |
| 24. AWARD OF CONTRACT, WORK SCHEDULE AND GUARANTEE |
| 25. SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM AND ISRAEL CERTIFICATION FORM |
| section-iv_6_11_2026.pdf |
| 100 SERIES: GENERAL |
| 101. SCOPE OF WORK |
| 102. FIELD ENGINEERING |
| 102-1. LINE AND GRADE PERFORMED BY THE CONTRACTOR |
| 102-1.1. GRADES, LINES AND LEVELS |
| 102-1.2. LAYOUT DATA |
102-2. LINE AND GRADE PERFORMED BY THE CITY
| 103. DEFINITION OF TERMS |
| 103-1. REFERENCE STANDARDS |
| 104. STREET CROSSINGS, ETC. |
| 105. AUDIO/VIDEO RECORDING OF WORK AREAS |
| 105-1. CONTRACTOR TO PREPARE AUDIO/VIDEO RECORDING |
| 105-2. SCHEDULING OF AUDIO/VIDEO RECORDING |
| 105-3. PROFESSIONAL VIDEOGRAPHERS |
| 105-4. EQUIPMENT |
| 105-5. RECORDED AUDIO INFORMATION |
| 105-6. RECORDED VIDEO INFORMATION |
| 105-7. VIEWER ORIENTATION |
| 105-8. LIGHTING |
| 105-9. SPEED OF TRAVEL |
| 105-10. VIDEO LOG/INDEX |
| 105-11. AREA OF COVERAGE |
| 105-12. COSTS OF VIDEO SERVICES |
| 106. STREET SIGNS |
| 107. WORK ZONE TRAFFIC CONTROL |
| 107-1. CONTRACTOR RESPONSIBLE FOR WORK ZONE TRAFFIC CONTROL |
| 107-2. WORK ZONE TRAFFIC CONTROL PLAN |
| 107-2.1. WORK ZONE SAFETY |
| 107-3. ROADWAY CLOSURE GUIDELINES |
| 107-3.1. ALL ROADWAYS |
| 107-3.1.1. PUBLIC NOTIFICATION |
| 107-3.2. MAJOR ARTERIALS, MINOR ARTERIALS, LOCAL COLLECTORS |
| 107-3.2.1. PUBLIC NOTIFICATION |
| 107-3.3. MAJOR ARTERIALS, MINOR ARTERIALS |
| 107-3.3.1. PUBLIC NOTIFICATION |
| 107-3.4. MAJOR ARTERIALS |
| 107-3.4.1. PUBLIC NOTIFICATION |
| 107-4. APPROVAL OF WORK ZONE TRAFFIC CONTROL PLAN |
| 107-5. INSPECTION OF WORK ZONE TRAFFIC CONTROL OPERATION |
| 107-6. PAYMENT FOR WORK ZONE TRAFFIC CONTROL |
| 107-7. CERTIFICATION OF WORK ZONE TRAFFIC CONTROL SUPERVISOR |
| 108. OVERHEAD ELECTRIC LINE CLEARANCE |
| 108-1. CLEARANCE OPTIONS |
| 108-2. REQUIRED MINIMUM CLEARANCE DISTANCES |
| 200 SERIES: SITEWORK |
| 201. EXCAVATION FOR UNDERGROUND INFRASTRUCTURE WORK |
| 201-1. EXCAVATION, BACKFILLING, AND COMPACTION FOR UNDERGROUND INFRASTRUCTURE |
| 201-1.1. GENERAL |
| 201-1.2. MATERIALS |
| 201-1.3. CLEARING AND GRUBBING |
| 201-1.3.1. GENERAL |
| 201-1.3.2. CLEARING AND GRUBBING OPERATIONS |
| 201-1.3.3. DISPOSAL OF DEBRIS MATERIAL |
| 201-1.3.4. PRESERVATION OF TREES AND SHRUBBERY |
| 201-1.3.5. PRESERVATION OF DEVELOPED PRIVATE PROPERTY |
| 201-1.3.6. PRESERVATION OF PUBLIC PROPERTY |
| 201-1.4. EXCAVATION PROTECTION |
| 201-1.4.1. SHEETING AND BRACING |
| 201-1.5. EXCAVATING FOR UTILITY STRUCTURES |
| 201-1.6. TRENCH EXCAVATION FOR UTILITY PIPELINES |
| 201-1.6.1. TRENCH EXCAVATION FOR PIPE LAYING - GENERAL |
| 201-1.6.2. LIMITED TRENCH WIDTHS |
| 201-1.6.3. MECHANICAL EXCAVATION |
| 201-1.6.4. PAVEMENT CUTTING |
| 201-1.6.5. ARTIFICIAL FOUNDATIONS IN TRENCHES |
| 201-1.6.6. BELL HOLES |
| 201-1.7. UNDERCUT OF EXCAVATIONS |
| 201-1.8. STABILIZATION OF EXCAVATIONS |
| 201-1.9. BACKFILL AND COMPACTION |
| 201-1.9.1. MATERIALS |
| 201-1.9.2. BACKFILL PLACEMENT AND COMPACTION |
| 201-1.9.3. STRUCTURE FOUNDATION PREPARATION |
| 201-1.10. DRAINAGE FROM EXCAVATIONS |
| 201-1.11. FINAL GRADING |
| 201-1.12. EXCESS EXCAVATED MATERIAL |
| 201-1.13. SETTLEMENT |
| 202. OBSTRUCTIONS |
| 203. DEWATERING |
| 203-1. GENERAL |
| 203-1.1. Definition of Terms for Dewatering System |
| 203-2. OBSERVATION WELLS |
| 203-3. PUMPING AND DRAINAGE - GENERAL |
| 203-3.1. DEWATERING EQUIPMENT |
| 203-3.2. DEWATERING CONSIDERATIONS |
| 203-3.3. DISPOSAL OF PUMPED WATER |
| 203-3.4. GROUNDWATER TREATMENT (IF REQUIRED) |
203-4. PERMIT REQUIREMENTS
| 204. UNSUITABLE MATERIAL REMOVAL |
| 204-1. BASIS OF MEASUREMENT |
| 204-2. BASIS OF PAYMENT |
| 205. UTILITY TIE IN LOCATION MARKING |
| 206. CLEARING AND GRUBBING |
| 206-1. BASIS OF MEASUREMENT |
| 206-2. BASIS OF PAYMENT |
| 207. EROSION AND SEDIMENT CONTROL |
| 207-1. GENERAL |
| 207-2. TRAINING OF PERSONNEL |
| 207-3. STABILIZATION OF DENUDED AREAS |
| 207-4. PROTECTION AND STABILIZATION OF SOIL STOCKPILES |
| 207-5. PROTECTION OF EXISTING STORM SEWER SYSTEMS |
| 207-6. SWALES, DITCHES AND CHANNELS |
| 207-7. UNDERGROUND UTILITY CONSTRUCTION |
| 207-8. MAINTENANCE |
| 207-9. COMPLIANCE |
| 208. CONSTRUCTION AND REPAIR OF SEAWALLS AND OTHER BEACH EROSION CONTROL STRUCTURES |
| 208-1. EXISTING SEAWALLS AND REVETMENTS |
| 208-2. TOP OF CAP ELEVATION |
| 208-3. SEAWALLS AND REVETMENTS LOCATED SEAWARD OF THE CCL |
| 208-4. PLACEMENT OF NEW SEAWALL |
| 208-5. POST CONSTRUCTION SURVEY |
| 208-6. RIP-RAP |
| 208-7. RETAINING WALL IN LIEU OF VERTICAL SEAWALL |
| 209. MAINTENANCE OF OPERATIONS |
| 209-1. GENERAL |
| 209-2. EXECUTION |
| 209-3. BASIS OF MEASUREMENT |
| 210. DETECTION OF FACILITIES |
| 211. RELOCATIONS |
| 211-1. RELOCATION SHOWN ON DRAWINGS |
| 211-2. RELOCATIONS NOT SHOWN ON DRAWINGS |
| 212. RESTORATION PROCEDURES |
| 212-1. INTERIM RESTORATION |
| 212-2. FINAL RESTORATION |
| 300 SERIES: MATERIALS |
| 301. CONCRETE |
| 302. EXCAVATION AND FORMS FOR CONCRETE WORK |
| 302-1. EXCAVATION |
| 302-2. FORMS |
| 303. REINFORCEMENT |
| 303-1. BASIS OF PAYMENT |
| 304. BACKFILL |
| 304-1. MATERIALS AND GENERAL |
| 304-2. TESTING AND INSPECTION |
| 305. RIPRAP |
| 305-1. BASIS OF MEASUREMENT |
| 305-2. BASIS OF PAYMENT |
| 306. FLOWABLE FILL |
| 307. MATERIAL INDEPENDENT TESTING |
| 400 SERIES: SANITARY SEWER |
| 401. SANITARY MANHOLES |
| 401-1. BUILT UP TYPE |
| 401-2. PRECAST TYPE |
| 401-2.1. MANHOLE ADJUSTMENT RINGS (GRADE RINGS) |
| 401-2.2. STAINLESS STEEL MANHOLE STORM WATER INFLOW ABATEMENT INSERTS (DISH/PAN) |
| 401-2.2.1. MATERIALS AND DESIGN |
| 401-2.2.2. MEASUREMENT AND PAYMENT |
| 401-3. DROP MANHOLES |
| 401-4. FRAMES AND COVERS |
| 401-5. MANHOLE COATINGS |
| 401-6. CONNECTIONS TO MANHOLES |
| 401-7. MEASUREMENT AND PAYMENT |
| 402. RAISING OR LOWERING OF SANITARY SEWER STRUCTURES |
| 402-1. BASIS OF PAYMENT |
| 403. SANITARY SEWERS AND FORCE MAINS |
| 403-1. MATERIALS |
| 403-1.1. GRAVITY SEWER PIPE |
| 403-1.2. FORCE MAIN PIPE |
| 403-2. INSTALLATION |
| 403-2.1. GRAVITY SEWER PIPE |
| 403-2.2. FORCE MAIN PIPE |
| 403-3. INSPECTIONS OF LINES AND MANHOLES |
| 403-4. TESTING |
| 403-4.1. TESTING OF GRAVITY SEWERS |
| 403-4.2. TESTING OF FORCE MAINS |
| 403-5. BASIS OF PAYMENT |
| 403-5.1. GRAVITY SEWER PIPE |
| 403-5.2. FORCE MAIN PIPE PAYMENT |
| 404. CURED-IN-PLACE PIPE SANITARY SEWER REHABILITATION |
| 404-1. GENERAL |
| 404-2. MEASUREMENT & PAYMENT |
| 404-3. SUBMITTALS |
| 404-4. CURED-IN-PLACE PIPE (CIPP) FOR GRAVITY SEWER MAINS |
| 404-4.1. LINER MATERIAL |
| 404-4.2. CHEMICAL JOINT, CRACK AND ANNULAR SPACE SEALING MATERIALS FOR ACTIVE LEAKS AND SERVICE LATERAL CONNECTIONS |
| 404-4.3. MANHOLE CONNECTIONS |
| 404-4.4. INSTALLATION AND EXECUTION |
| 404-4.4.1. CLEANING/SURFACE PREPARATION |
| 404-4.4.2. TELEVISION INSPECTION |
| 404-4.4.2.1. IMAGE (PHOTOS) CAPTURE FORMAT AND REQUIREMENTS |
| 404-4.4.2.2. DIGITAL VIDEO FORMAT AND REQUIREMENTS |
| 404-4.4.2.3. SYNCHRONIZATION |
| 404-4.4.3. LINER INSTALLATION |
| 404-4.4.4. LATERAL RECONNECTION |
| 404-4.4.5. TIME OF CONSTRUCTION |
| 404-4.4.6. TESTING AND ACCEPTANCE |
| 404-4.4.7. CLEANUP |
| 404-5. CURED-IN-PLACE PIPE (CIPP) FOR SERVICE LATERALS |
| 404-5.1. LINER MATERIAL |
| 404-5.2. EPOXY RESIN MATERIAL |
| 404-5.3. INSTALLATION AND EXECUTION |
| 404-5.3.1. PRE-LINING INSPECTION |
| 404-5.3.2. LATERAL PREPARATION |
| 404-5.3.3. LINER INSTALLATION |
| 404-5.3.4. TESTING AND ACCEPTANCE |
| 405. SANITARY MANHOLE LINER RESTORATION |
| 405-1. SCOPE AND INTENT |
| 405-2. MEASUREMENT & PAYMENT |
| 405-2.1. MANHOLE LINERS/COATING |
| 405-2.2. REPLACE FRAME & COVER |
| 405-2.3. REBUILD BENCH & CHANNEL/TROUGH |
| 405-2.4. RESET/ADJUST MANHOLE FRAME & COVER |
| 405-2.5. SEAL MANHOLE FRAME TO CORBEL CONNECTION WITH POLYUREA MATERIAL |
| 405-3. CEMENTITIOUS COATING SYSTEM |
| 405-3.1. SUBMITTALS |
| 405-3.2. MATERIALS |
| 405-3.2.1. PATCHING MIX |
| 405-3.2.2. INFILTRATION CONTROL |
| 405-3.2.3. GROUTING MIX |
| 405-3.2.4. COATING MIX |
| 405-3.2.5. WATER |
| 405-3.2.6. OTHER MATERIALS |
| 405-3.3. APPLICATION EQUIPMENT |
| 405-3.4. INSTALLATION AND EXECUTION |
| 405-3.4.1. PREPARATION |
| 405-3.4.2. MIXING |
| 405-3.4.3. SPRAYING |
| 405-3.4.4. PREPARATION OF SAMPLES |
| 405-3.4.5. CURING |
405-3.5. TESTING AND ACCEPTANCE
| 405-4. RAVEN 405 EPOXY COATING SYSTEM |
| 405-4.1. SUBMITTALS |
| 405-4.2. MATERIALS |
| 405-4.2.1. PATCHING MIX |
| 405-4.2.2. INFILTRATION CONTROL |
| 405-4.2.3. GROUTING MIX |
| 405-4.2.4. COATING MATERIAL |
| 405-4.2.5. OTHER MATERIALS |
| 405-4.3. INSTALLATION AND EXECUTION |
| 405-4.3.1. PREPARATION |
| 405-4.3.2. APPLICATION |
405-4.4. TESTING & ACCEPTANCE
| 405-5. SPRAYWALL POLYURETHANE COATING SYSTEM |
| 405-5.1. SUBMITTALS |
| 405-5.2. MATERIALS |
| 405-5.2.1. PATCHING MIX |
| 405-5.2.2. INFILTRATION CONTROL |
| 405-5.2.3. GROUTING MIX |
| 405-5.2.4. COATING MATERIAL |
| 405-5.2.5. OTHER MATERIALS |
| 405-5.3. INSTALLATION AND EXECUTION |
| 405-5.3.1. PREPARATION |
| 405-5.3.2. APPLICATION |
405-5.4. TESTING & ACCEPTANCE
| 405-6. INTERNAL MANHOLE CORBEL SEALING SYSTEM |
| 405-6.1. SUBMITTALS |
| 405-6.2. MATERIALS |
| 405-6.2.1. PATCHING MIX |
| 405-6.2.2. INFILTRATION CONTROL |
| 405-6.2.3. COATING MATERIAL |
| 405-6.3. INSTALLATION AND EXECUTION |
| 405-6.3.1. PREPARATION |
| 405-6.3.2. APPLICATION |
| 405-6.3.3. TESTING & ACCEPTANCE |
| 406. SMOKE AND DYE TESTING |
| 406-1. GENERAL PROTOCOL |
| 406-2. REPORTING |
| 406-3. DYE INVESTIGATION |
| 406-3.1. DYE WATER TRACING |
| 406-3.2. DYE WATER FLOODING |
| 406-4. MEASUREMENT AND PAYMENT |
| 406-5. BASIS OF PAYMENT |
| 500 SERIES: POTABLE AND RECLAIMED WATER MAINS, FIRE LINES AND APPURTENANCES |
| 501. SCOPE |
| 502. MATERIALS |
| 502-1. GENERAL |
| 502-2. PIPE MATERIALS AND FITTINGS |
| 502-2.1. DUCTILE IRON PIPE |
| 502-2.1.1. MANUFACTURED RESTRAINED JOINTS FOR DUCTILE IRON PIPE |
| 502-2.1.2. ALTERNATE MECHANICALLY RESTRAINED JOINTS FOR DI PIPE |
| 502-2.1.2.1. Restraints for Ductile Iron Pipe with Mechanical Joint Fittings |
| 502-2.1.2.2. Restraints for Ductile Iron Pipe with Push-on Joints |
| 502-2.1.3. Ductile Iron Pipe Installed with Steel Casings |
| 502-2.1.4. POLYETHYLENE ENCASEMENT FOR BURIED DUCTILE IRON PIPE |
| 502-2.2. POLYVINYL CHLORIDE (PVC) PIPE |
| 502-2.2.1. RESTRAINED JOINT PVC PIPE (DIRECTIONAL BORE) |
| 502-2.3. HIGH DENSITY POLYETHYLENE (HDPE) PIPE |
| 502-2.3.1. MECHANICAL JOINT ADAPTERS (MJ ADPATERS) |
| 502-2.3.2. BUTT FUSION PROCESS AND INSTALLATION |
| 502-2.4. PIPING IDENTIFICATION SYSTEM |
| 502-2.4.1. EXTERIOR MARKINGS FOR BURIED PIPE |
| 502-2.4.2. LOCATION DETECTION WIRE: |
| 502-2.4.3. WARNING TAPE: |
502-2.5. RESTRAINED JOINT COUPLINGS
| 502-3. GATE VALVES |
| 502-4. VALVE BOXES |
| 502-5. HYDRANTS |
| 502-6. SERVICE SADDLES/ POLYETHYLENE SERVICE LINES |
| 502-7. BACKFLOW PREVENTERS |
| 502-8. TAPPING SLEEVES AND LINESTOPS |
| 502-9. LINE STOPPING ASSEMBLIES |
| 502-10. BLOW OFF HYDRANTS |
| 503. CONSTRUCTION |
| 503-1. MATERIAL HANDLING |
| 503-2. PIPE LAYING |
| 503-2.1. INSPECTION PRIOR TO INSTALLATION |
| 503-2.2. GENERAL INSTALLATION REQUIREMENTS |
| 503-2.3. INSTALLATION OF DUCTILE IRON PIPE |
| 503-2.4. INSTALLATION OF POLYVINYL CHLORIDE (PVC) PIPE |
| 503-2.5. DIRECTIONAL BORING INSTALLATION |
| 503-2.5.1. GENERAL REQUIREMENTS |
| 503-2.5.2. SUBMITTALS |
| 503-2.5.3. QUALITY ASSURANCE AND COORDINATION OF WORK |
| 503-2.5.4. HDD PIPE PRODUCTS |
| 503-2.5.5. GENERAL HDD INSTALLATION CONSIDERATION |
| 503-2.5.6. HDD DRILLING EQUIPMENT AND DRILLING FLUID |
| 503-2.5.7. PREPARATION AND MOBILIZATION FOR HDD OPERATIONS |
| 503-2.5.8. ENVIRONMENTAL REQUIREMENTS |
| 503-2.5.9. DRILLING OPERATIONS |
| 503-2.5.10. HDD INSTALLATION |
| 503-2.5.11. DRILLING MUD AND CUTTINGS |
| 503-2.5.12. REAMING AND PULLBACK |
| 503-2.5.13. PIPELINE PROTECTION |
| 503-2.5.14. PIPELINE CLEANING |
| 503-2.5.15. PIPELINE TESTING |
| 503-2.5.16. DISINFECTION FOR HDD POTABLE WATER PIPELINES |
| 503-2.5.17. CITY ACCEPTANCE |
| 503-2.5.18. REPAIR |
| 503-2.5.19. CLEANUP AND REPAIR |
| 503-3. SETTING OF VALVES, HYDRANTS AND FITTINGS |
| 503-3.1. GENERAL |
| 503-3.2. Fittings |
| 503-3.3. VALVES |
| 503-3.4. FIRE HYDRANTS |
| 503-3.5. ANCHORAGE |
503-4. CONNECTIONS TO EXISTING POTABLE WATER OR RECLAIMED WATER LINES
| 504. PIPELINE CLEANING |
| 504-1. PIPELINE PIGGING |
| 504-2. FINAL PIPELINE FLUSHING |
| 505. TESTS |
| 505-1. HYDROSTATIC PIPELINE TESTING |
| 505-2. NOTICE OF TEST |
| 506. DISINFECTION AND TESTING |
| 506-1. DISINFECTION MATERIALS |
| 506-2. FLUSHING SYSTEM |
| 506-3. FINAL DISINFECTION PROCEDURE FOR POTABLE WATER MAINS |
| 506-4. FLUSHING AND RESIDUAL CHLORINE TESTS |
| 506-5. BACTERIALOGICAL TESTS |
| 507. CORRECTION OF NON-CONFORMING WORK |
| 508. OBTAINING WATER FOR FLUSHING AND TESTING |
| 509. MEASUREMENT AND PAYMENT |
| 509-1. GENERAL |
| 509-2. FURNISH AND INSTALL WATER MAINS |
| 509-2.1. MEASUREMENT |
| 509-2.2. PAYMENT |
| 509-3. FURNISH AND INSTALL FITTINGS |
| 509-3.1. MEASUREMENT |
| 509-3.2. PAYMENT |
| 509-4. FURNISH AND INSTALL GATE VALVES COMPLETE WITH BOXES AND COVERS |
| 509-4.1. MEASUREMENT |
| 509-4.2. PAYMENT |
| 509-5. FURNISH AND INSTALL FIRE HYDRANTS |
| 509-5.1. MEASUREMENT |
| 509-5.2. PAYMENT |
| 600 SERIES: STORMWATER |
| 601. RAISING OR LOWERING OF STORM DRAINAGE STRUCTURES |
| 601-1. BASIS OF PAYMENT |
| 602. UNDERDRAINS |
| 602-1. BASIS OF MEASUREMENT |
| 602-2. BASIS OF PAYMENT |
| 603. STORM SEWERS |
| 603-1. TESTING AND INSPECTION |
| 603-2. BASIS OF PAYMENT |
| 604. STORM MANHOLES, INLETS, CATCH BASINS OR OTHER STORM STRUCTURES |
| 604-1. BUILT UP TYPE STRUCTURES |
| 604-2. PRECAST TYPE |
| 604-3. BASIS OF PAYMENT |
| 605. GABIONS AND MATTRESSES |
| 605-1. MATERIAL |
| 605-1.1. PVC COATED WIRE MESH GABIONS & MATTRESSES |
| 605-1.1.1. GABION & MATTRESS BASKETS |
| 605-1.1.2. PVC (POLYVINYL CHLORIDE) COATING |
| 605-1.1.3. GABION AND MATTRESS FILLER MATERIAL |
| 605-1.1.4. GEOTEXTILE FABRIC |
605-2. PERFORMANCE
| 700 SERIES: STREETS AND SIDEWALKS |
| 701. RESTORATION OR REPLACEMENT OF DRIVEWAYS, CURBS, SIDEWALKS AND STREET PAVEMENT |
| 702. ROADWAY BASE AND SUBGRADE |
| 702-1. BASE |
| 702-1.1. BASIS OF MEASUREMENT FOR BASE AND REWORKED BASE |
| 702-1.2. BASIS OF PAYMENT FOR BASE AND REWORKED BASE |
| 702-2. SUBGRADE |
| 702-2.1. BASIS OF MEASUREMENT |
| 702-2.2. BASIS OF PAYMENT |
| 703. ASPHALTIC CONCRETE MATERIALS |
| 703-1. ASPHALTIC CONCRETE |
| 703-1.1. AGGREGATE |
| 703-1.2. BITUMINOUS MATERIALS |
| 703-2. HOT BITUMINOUS MIXTURES – PLANT, METHODS, EQUIPMENT & QUALITY ASSURANCE |
| 703-3. ASPHALT MIX DESIGNS AND TYPES |
| 703-4. ASPHALT PAVEMENT DESIGNS AND LAYER THICKNESS |
| 703-5. GENERAL CONSTRUCTION REQUIREMENTS |
| 703-6. CRACKS AND POTHOLE PREPARATION |
| 703-6.1. CRACKS |
| 703-6.2. POTHOLES |
| 703-7. ADJUSTMENT OF MANHOLES AND APPURTANENCES |
| 703-8. ADDITIONAL ASPHALT REQUIREMENTS |
| 703-9. BASIS OF MEASUREMENT |
| 703-10. BASIS OF PAYMENT |
| 704. ADJUSTMENT TO THE UNIT BID PRICE FOR ASPHALT |
| 705. ASPHALT DRIVEWAYS |
| 705-1. BASIS OF MEASUREMENT |
| 705-2. BASIS OF PAYMENT |
| 706. CONCRETE CURBS |
| 706-1. BASIS OF MEASUREMENT |
| 706-2. BASIS OF PAYMENT |
| 707. CONCRETE SIDEWALKS AND DRIVEWAYS |
| 707-1. CONCRETE SIDEWALKS |
| 707-2. CONCRETE DRIVEWAYS |
| 707-3. CONCRETE CURB RAMPS |
| 707-4. BASIS OF MEASUREMENT |
| 707-5. BASIS OF PAYMENT |
| 708. MILLING OPERATIONS |
| 708-1. EQUIPMENT, CONSTRUCTION & MILLED SURFACE |
| 708-2. ADDITIONAL MILLING REQUIREMENTS |
| 708-3. SALVAGEABLE MATERIALS |
| 708-4. DISPOSABLE MATERIALS |
| 708-5. ADJUSTMENT AND LOCATION OF UNDERGROUND UTILITIES |
| 708-6. ADJUSTMENT OF UTILITY MANHOLES |
| 708-7. TYPES OF MILLING |
| 708-8. MILLING OF INTERSECTIONS |
| 708-9. BASIS OF MEASUREMENT |
| 708-10. BASIS OF PAYMENT |
| 800 SERIES: TRAFFIC SIGNALS, SIGNS AND MARKINGS |
| 801. TRAFFIC SIGNAL EQUIPMENT AND MATERIALS |
| 801-1. BASIS OF MEASUREMENT AND PAYMENT |
| 802. SIGNING AND MARKING |
| 802-1. BASIS OF MEASUREMENT AND PAYMENT |
| 803. ROADWAY LIGHTING |
| 803-1. BASIS OF MEASUREMENT AND PAYMENT |
| 900 SERIES: LANDSCAPING/RESTORATION |
| 901. WORK IN EASEMENTS OR PARKWAYS |
| 902. GENERAL PLANTING SPECIFICATIONS |
| 902-1. IRRIGATION |
| 902-1.1. DESCRIPTION |
| 902-1.1.1. QUALITY ASSURANCE |
| 902-1.1.2. PROJECT CONDITIONS |
| 902-1.1.3. WARRANTY |
| 902-1.2. PRODUCTS |
| 902-1.2.1. GENERAL |
| 902-1.2.2. PIPING |
| 902-1.2.3. PIPE FITTINGS |
| 902-1.2.4. PVC PIPE CEMENT AND PRIMER |
| 902-1.2.5. THREADED CONNECTIONS |
| 902-1.2.6. GATE VALVES |
| 902-1.2.6.1. MANUAL GATE VALVES TWO INCHES (2”) AND SMALLER |
| 902-1.2.6.2. GATE VALVES TWO AND A HALF INCHES (2½”) AND LARGER |
| 902-1.2.7. SLEEVES |
| 902-1.2.8. REMOTE CONTROL VALVES |
| 902-1.2.9. VALVE BOXES |
| 902-1.2.10. AUTOMATIC CONTROL TIMER |
| 902-1.2.11. FIELD TRANSMITTER |
| 902-1.3. EXECUTION |
| 902-1.3.1. GENERAL INSTALLATION REQUIREMENTS |
| 902-1.3.2. EXCAVATING AND BACKFILLING |
| 902-1.3.2.1. TRENCHING - GENERAL |
| 902-1.3.2.2. BACKFILLING |
| 902-1.3.2.3. ROUTING OF PIPING |
| 902-1.3.3. INSTALLATION |
| 902-1.3.3.1. WATER SUPPLY |
| 902-1.3.3.2. ASSEMBLIES |
| 902-1.3.3.3. SLEEVES: (EXISTING BY CITY OF CLEARWATER) |
| 902-1.3.3.4. PLASTIC PIPE |
| 902-1.3.3.5. CONTROLLERS |
| 902-1.3.3.6. REMOTE CONTROL VALVES |
| 902-1.3.3.7. GATE VALVES |
| 902-2. LANDSCAPE |
| 902-2.1. GENERAL |
| 902-2.1.1. REQUIREMENTS OF REGULATORY AGENCIES |
| 902-2.1.2. SCOPE OF WORK |
| 902-2.1.3. QUALITY ASSURANCE |
| 902-2.1.4. SUBMITTALS |
| 902-2.1.5. ALTERNATES, ADDITIONS, DELETIONS, SUBSTITUTIONS |
| 902-2.1.6. ABBREVIATIONS/DEFINITIONS |
| 902-2.1.7. PRODUCT DELIVERY, STORAGE, AND HANDLING |
| 902-2.1.7.1. PLANT MATERIALS |
| 902-2.1.8. JOB CONDITIONS |
| 902-2.1.8.1. ACCEPTANCE OF JOB CONDITIONS. |
| 902-2.1.8.2. SCHEDULING OF WORK |
| 902-2.1.8.3. UTILITIES |
| 902-2.2. PRODUCTS |
| 902-2.2.1. MATERIALS |
| 902-2.2.1.1. PLANT MATERIALS: NOMENCLATURE |
| 902-2.2.1.2. PLANT MATERIALS: QUALITY ASSURANCE |
| 902-2.2.1.3. GRASSES: SOD OR SEED |
| 902-2.2.1.4. MULCH |
| 902-2.2.1.5. STAKES AND GUYS |
| 902-2.2.1.6. PLANTING SOIL |
| 902-2.2.1.7. TREE PROTECTION |
| 902-2.2.1.8. ROOT BARRIER SYSTEM |
| 902-2.2.1.9. PACKAGED MATERIALS |
| 902-2.2.1.10. PESTICIDES |
| 902-2.3. EXECUTION |
| 902-2.3.1. PREPARATION |
| 902-2.3.1.1. OBSTRUCTIONS BELOW GROUND |
| 902-2.3.1.2. GRADING AND PREPARATION FOR PLANT MATERIALS |
| 902-2.3.1.3. PREPARATION FOR ANNUAL BED PLANTING |
| 902-2.3.1.4. PREPARATION FOR SEEDING AND SOD AREAS |
| 902-2.3.2. INSTALLATION |
| 902-2.3.2.1. BERM CONSTRUCTION (IF SPECIFIED) |
| 902-2.3.2.2. LAYOUT OF PLANT MATERIALS |
| 902-2.3.2.3. PLANTING PROCEDURES |
| 902-2.3.2.4. SODDING |
| 902-2.3.2.5. SEEDING |
| 902-2.3.2.6. TREE GUYING, BRACING AND STAKING |
| 902-2.3.2.7. MULCHING |
| 902-2.3.2.8. CLEAN-UP |
| 902-2.3.2.9. PROTECTION |
| 902-2.3.2.10. REPAIR OF DAMAGES |
| 902-2.3.3. MAINTENANCE |
| 902-2.3.4. INSPECTION, REJECTION, AND ACCEPTANCE |
| 902-2.3.4.1. INSPECTION |
| 902-2.3.4.2. REJECTION AND REPLACEMENT |
| 902-2.3.4.3. ACCEPTANCE |
902-2.3.5. WARRANTY
| 903. SODDING |
| 904. SEEDING |
| 905. LAWN MAINTENANCE SPECIFICATIONS |
| 905-1. SCOPE |
| 905-2. SCHEDULING OF WORK |
| 905-3. WORK METHODS |
| 905-3.1. MAINTENANCE SCHEDULING |
| 905-3.2. DUTIES PER SERVICE VISIT |
| 905-3.2.1. LITTER AND DEBRIS |
| 905-3.2.2. VISUAL CHECK |
| 905-3.2.3. PLANT TRIMMING AND PALM PRUNING |
| 905-3.2.3.1. TRAFFIC CONTROL |
| 905-3.2.3.2. PEDESTRIAN SAFETY |
| 905-3.2.4. WEED REMOVAL IN LANDSCAPED AREA |
| 905-3.2.5. MULCH CONDITION |
| 905-3.2.6. IRRIGATION SERVICE AND REPAIR |
| 905-3.2.7. LAWN AND ORNAMENTAL PEST CONTROL |
| 905-3.2.8. PALM FERTILIZATION |
| 905-3.2.9. FREEZE PROTECTION |
| 906. LEVEL OF SERVICE |
| 907. COMPLETION OF WORK |
| 908. INSPECTION AND APPROVAL |
| 909. SPECIAL CONDITIONS |
| 910. TREE PROTECTION |
| 910-1. TREE BARRICADES |
| 910-2. ROOT PRUNING |
| 910-3. PROPER TREE PRUNING |
| 911. IRRIGATION SYSTEM DESIGN |
| 912. IRRIGATION SYSTEM INSTALLATION |
| SectionV - 2025_0709 6 11 2026.pdf |
| PUBLIC CONSTRUCTION BOND |
| CONTRACT |
| CONSENT OF SURETY TO FINAL PAYMENT |
| PROPOSAL/BID BOND |
| AFFIDAVIT |
| NON-COLLUSION AFFIDAVIT |
| PROPOSAL |
| CITY OF CLEARWATER ADDENDUM SHEET |
| BIDDER’S PROPOSAL |
| SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM |
| SCRUTINIZED COMPANIES THAT BOYCOTT ISRAEL LIST CERTIFICATION FORM |
| Appendix - 2025_0709.pdf |
| OWNER DIRECT PURCHASE (ODP) DOCUMENTS [if needed] |
| REQUEST TO REQUISITION FORM |
| PROJECT PERMITS |
| GEOTECHNICAL SOIL REPORT |
| UTILITY WORK SCHEDULES |
| PAGES Appendix - 2025_0709 - Copy2.pdf |
| CONTAMINATION SCREENING EVALUATION REPORT |
| Appendix - 2025_0709a.pdf |
| VERIFICATION OF EMPLOYMENT ELIGIBILITY FORM |
| OWNER DIRECT PURCHASE (ODP) DOCUMENTS (Not Applicable) |
| Owner Direct Purchase (ODP) Instructions |
| SectionV - 2025_0709 6 11 2026.pdf |
| PUBLIC CONSTRUCTION BOND |
| CONTRACT |
| CONSENT OF SURETY TO FINAL PAYMENT |
| PROPOSAL/BID BOND |
| AFFIDAVIT |
| NON-COLLUSION AFFIDAVIT |
| PROPOSAL |
| CITY OF CLEARWATER ADDENDUM SHEET |
| BIDDER’S PROPOSAL |
| SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM |
| SCRUTINIZED COMPANIES THAT BOYCOTT ISRAEL LIST CERTIFICATION FORM |
| section-iv_6_11_2026.pdf |
| 100 SERIES: GENERAL |
| 101. SCOPE OF WORK |
| 102. FIELD ENGINEERING |
| 102-1. LINE AND GRADE PERFORMED BY THE CONTRACTOR |
| 102-1.1. GRADES, LINES AND LEVELS |
| 102-1.2. LAYOUT DATA |
102-2. LINE AND GRADE PERFORMED BY THE CITY
| 103. DEFINITION OF TERMS |
| 103-1. REFERENCE STANDARDS |
| 104. STREET CROSSINGS, ETC. |
| 105. AUDIO/VIDEO RECORDING OF WORK AREAS |
| 105-1. CONTRACTOR TO PREPARE AUDIO/VIDEO RECORDING |
| 105-2. SCHEDULING OF AUDIO/VIDEO RECORDING |
| 105-3. PROFESSIONAL VIDEOGRAPHERS |
| 105-4. EQUIPMENT |
| 105-5. RECORDED AUDIO INFORMATION |
| 105-6. RECORDED VIDEO INFORMATION |
| 105-7. VIEWER ORIENTATION |
| 105-8. LIGHTING |
| 105-9. SPEED OF TRAVEL |
| 105-10. VIDEO LOG/INDEX |
| 105-11. AREA OF COVERAGE |
| 105-12. COSTS OF VIDEO SERVICES |
| 106. STREET SIGNS |
| 107. WORK ZONE TRAFFIC CONTROL |
| 107-1. CONTRACTOR RESPONSIBLE FOR WORK ZONE TRAFFIC CONTROL |
| 107-2. WORK ZONE TRAFFIC CONTROL PLAN |
| 107-2.1. WORK ZONE SAFETY |
| 107-3. ROADWAY CLOSURE GUIDELINES |
| 107-3.1. ALL ROADWAYS |
| 107-3.1.1. PUBLIC NOTIFICATION |
| 107-3.2. MAJOR ARTERIALS, MINOR ARTERIALS, LOCAL COLLECTORS |
| 107-3.2.1. PUBLIC NOTIFICATION |
| 107-3.3. MAJOR ARTERIALS, MINOR ARTERIALS |
| 107-3.3.1. PUBLIC NOTIFICATION |
| 107-3.4. MAJOR ARTERIALS |
| 107-3.4.1. PUBLIC NOTIFICATION |
| 107-4. APPROVAL OF WORK ZONE TRAFFIC CONTROL PLAN |
| 107-5. INSPECTION OF WORK ZONE TRAFFIC CONTROL OPERATION |
| 107-6. PAYMENT FOR WORK ZONE TRAFFIC CONTROL |
| 107-7. CERTIFICATION OF WORK ZONE TRAFFIC CONTROL SUPERVISOR |
| 108. OVERHEAD ELECTRIC LINE CLEARANCE |
| 108-1. CLEARANCE OPTIONS |
| 108-2. REQUIRED MINIMUM CLEARANCE DISTANCES |
| 200 SERIES: SITEWORK |
| 201. EXCAVATION FOR UNDERGROUND INFRASTRUCTURE WORK |
| 201-1. EXCAVATION, BACKFILLING, AND COMPACTION FOR UNDERGROUND INFRASTRUCTURE |
| 201-1.1. GENERAL |
| 201-1.2. MATERIALS |
| 201-1.3. CLEARING AND GRUBBING |
| 201-1.3.1. GENERAL |
| 201-1.3.2. CLEARING AND GRUBBING OPERATIONS |
| 201-1.3.3. DISPOSAL OF DEBRIS MATERIAL |
| 201-1.3.4. PRESERVATION OF TREES AND SHRUBBERY |
| 201-1.3.5. PRESERVATION OF DEVELOPED PRIVATE PROPERTY |
| 201-1.3.6. PRESERVATION OF PUBLIC PROPERTY |
| 201-1.4. EXCAVATION PROTECTION |
| 201-1.4.1. SHEETING AND BRACING |
| 201-1.5. EXCAVATING FOR UTILITY STRUCTURES |
| 201-1.6. TRENCH EXCAVATION FOR UTILITY PIPELINES |
| 201-1.6.1. TRENCH EXCAVATION FOR PIPE LAYING - GENERAL |
| 201-1.6.2. LIMITED TRENCH WIDTHS |
| 201-1.6.3. MECHANICAL EXCAVATION |
| 201-1.6.4. PAVEMENT CUTTING |
| 201-1.6.5. ARTIFICIAL FOUNDATIONS IN TRENCHES |
| 201-1.6.6. BELL HOLES |
| 201-1.7. UNDERCUT OF EXCAVATIONS |
| 201-1.8. STABILIZATION OF EXCAVATIONS |
| 201-1.9. BACKFILL AND COMPACTION |
| 201-1.9.1. MATERIALS |
| 201-1.9.2. BACKFILL PLACEMENT AND COMPACTION |
| 201-1.9.3. STRUCTURE FOUNDATION PREPARATION |
| 201-1.10. DRAINAGE FROM EXCAVATIONS |
| 201-1.11. FINAL GRADING |
| 201-1.12. EXCESS EXCAVATED MATERIAL |
| 201-1.13. SETTLEMENT |
| 202. OBSTRUCTIONS |
| 203. DEWATERING |
| 203-1. GENERAL |
| 203-1.1. Definition of Terms for Dewatering System |
| 203-2. OBSERVATION WELLS |
| 203-3. PUMPING AND DRAINAGE - GENERAL |
| 203-3.1. DEWATERING EQUIPMENT |
| 203-3.2. DEWATERING CONSIDERATIONS |
| 203-3.3. DISPOSAL OF PUMPED WATER |
| 203-3.4. GROUNDWATER TREATMENT (IF REQUIRED) |
203-4. PERMIT REQUIREMENTS
| 204. UNSUITABLE MATERIAL REMOVAL |
| 204-1. BASIS OF MEASUREMENT |
| 204-2. BASIS OF PAYMENT |
| 205. UTILITY TIE IN LOCATION MARKING |
| 206. CLEARING AND GRUBBING |
| 206-1. BASIS OF MEASUREMENT |
| 206-2. BASIS OF PAYMENT |
| 207. EROSION AND SEDIMENT CONTROL |
| 207-1. GENERAL |
| 207-2. TRAINING OF PERSONNEL |
| 207-3. STABILIZATION OF DENUDED AREAS |
| 207-4. PROTECTION AND STABILIZATION OF SOIL STOCKPILES |
| 207-5. PROTECTION OF EXISTING STORM SEWER SYSTEMS |
| 207-6. SWALES, DITCHES AND CHANNELS |
| 207-7. UNDERGROUND UTILITY CONSTRUCTION |
| 207-8. MAINTENANCE |
| 207-9. COMPLIANCE |
| 208. CONSTRUCTION AND REPAIR OF SEAWALLS AND OTHER BEACH EROSION CONTROL STRUCTURES |
| 208-1. EXISTING SEAWALLS AND REVETMENTS |
| 208-2. TOP OF CAP ELEVATION |
| 208-3. SEAWALLS AND REVETMENTS LOCATED SEAWARD OF THE CCL |
| 208-4. PLACEMENT OF NEW SEAWALL |
| 208-5. POST CONSTRUCTION SURVEY |
| 208-6. RIP-RAP |
| 208-7. RETAINING WALL IN LIEU OF VERTICAL SEAWALL |
| 209. MAINTENANCE OF OPERATIONS |
| 209-1. GENERAL |
| 209-2. EXECUTION |
| 209-3. BASIS OF MEASUREMENT |
| 210. DETECTION OF FACILITIES |
| 211. RELOCATIONS |
| 211-1. RELOCATION SHOWN ON DRAWINGS |
| 211-2. RELOCATIONS NOT SHOWN ON DRAWINGS |
| 212. RESTORATION PROCEDURES |
| 212-1. INTERIM RESTORATION |
| 212-2. FINAL RESTORATION |
| 300 SERIES: MATERIALS |
| 301. CONCRETE |
| 302. EXCAVATION AND FORMS FOR CONCRETE WORK |
| 302-1. EXCAVATION |
| 302-2. FORMS |
| 303. REINFORCEMENT |
| 303-1. BASIS OF PAYMENT |
| 304. BACKFILL |
| 304-1. MATERIALS AND GENERAL |
| 304-2. TESTING AND INSPECTION |
| 305. RIPRAP |
| 305-1. BASIS OF MEASUREMENT |
| 305-2. BASIS OF PAYMENT |
| 306. FLOWABLE FILL |
| 307. MATERIAL INDEPENDENT TESTING |
| 400 SERIES: SANITARY SEWER |
| 401. SANITARY MANHOLES |
| 401-1. BUILT UP TYPE |
| 401-2. PRECAST TYPE |
| 401-2.1. MANHOLE ADJUSTMENT RINGS (GRADE RINGS) |
| 401-2.2. STAINLESS STEEL MANHOLE STORM WATER INFLOW ABATEMENT INSERTS (DISH/PAN) |
| 401-2.2.1. MATERIALS AND DESIGN |
| 401-2.2.2. MEASUREMENT AND PAYMENT |
| 401-3. DROP MANHOLES |
| 401-4. FRAMES AND COVERS |
| 401-5. MANHOLE COATINGS |
| 401-6. CONNECTIONS TO MANHOLES |
| 401-7. MEASUREMENT AND PAYMENT |
| 402. RAISING OR LOWERING OF SANITARY SEWER STRUCTURES |
| 402-1. BASIS OF PAYMENT |
| 403. SANITARY SEWERS AND FORCE MAINS |
| 403-1. MATERIALS |
| 403-1.1. GRAVITY SEWER PIPE |
| 403-1.2. FORCE MAIN PIPE |
| 403-2. INSTALLATION |
| 403-2.1. GRAVITY SEWER PIPE |
| 403-2.2. FORCE MAIN PIPE |
| 403-3. INSPECTIONS OF LINES AND MANHOLES |
| 403-4. TESTING |
| 403-4.1. TESTING OF GRAVITY SEWERS |
| 403-4.2. TESTING OF FORCE MAINS |
| 403-5. BASIS OF PAYMENT |
| 403-5.1. GRAVITY SEWER PIPE |
| 403-5.2. FORCE MAIN PIPE PAYMENT |
| 404. CURED-IN-PLACE PIPE SANITARY SEWER REHABILITATION |
| 404-1. GENERAL |
| 404-2. MEASUREMENT & PAYMENT |
| 404-3. SUBMITTALS |
| 404-4. CURED-IN-PLACE PIPE (CIPP) FOR GRAVITY SEWER MAINS |
| 404-4.1. LINER MATERIAL |
| 404-4.2. CHEMICAL JOINT, CRACK AND ANNULAR SPACE SEALING MATERIALS FOR ACTIVE LEAKS AND SERVICE LATERAL CONNECTIONS |
| 404-4.3. MANHOLE CONNECTIONS |
| 404-4.4. INSTALLATION AND EXECUTION |
| 404-4.4.1. CLEANING/SURFACE PREPARATION |
| 404-4.4.2. TELEVISION INSPECTION |
| 404-4.4.2.1. IMAGE (PHOTOS) CAPTURE FORMAT AND REQUIREMENTS |
| 404-4.4.2.2. DIGITAL VIDEO FORMAT AND REQUIREMENTS |
| 404-4.4.2.3. SYNCHRONIZATION |
| 404-4.4.3. LINER INSTALLATION |
| 404-4.4.4. LATERAL RECONNECTION |
| 404-4.4.5. TIME OF CONSTRUCTION |
| 404-4.4.6. TESTING AND ACCEPTANCE |
| 404-4.4.7. CLEANUP |
| 404-5. CURED-IN-PLACE PIPE (CIPP) FOR SERVICE LATERALS |
| 404-5.1. LINER MATERIAL |
| 404-5.2. EPOXY RESIN MATERIAL |
| 404-5.3. INSTALLATION AND EXECUTION |
| 404-5.3.1. PRE-LINING INSPECTION |
| 404-5.3.2. LATERAL PREPARATION |
| 404-5.3.3. LINER INSTALLATION |
| 404-5.3.4. TESTING AND ACCEPTANCE |
| 405. SANITARY MANHOLE LINER RESTORATION |
| 405-1. SCOPE AND INTENT |
| 405-2. MEASUREMENT & PAYMENT |
| 405-2.1. MANHOLE LINERS/COATING |
| 405-2.2. REPLACE FRAME & COVER |
| 405-2.3. REBUILD BENCH & CHANNEL/TROUGH |
| 405-2.4. RESET/ADJUST MANHOLE FRAME & COVER |
| 405-2.5. SEAL MANHOLE FRAME TO CORBEL CONNECTION WITH POLYUREA MATERIAL |
| 405-3. CEMENTITIOUS COATING SYSTEM |
| 405-3.1. SUBMITTALS |
| 405-3.2. MATERIALS |
| 405-3.2.1. PATCHING MIX |
| 405-3.2.2. INFILTRATION CONTROL |
| 405-3.2.3. GROUTING MIX |
| 405-3.2.4. COATING MIX |
| 405-3.2.5. WATER |
| 405-3.2.6. OTHER MATERIALS |
| 405-3.3. APPLICATION EQUIPMENT |
| 405-3.4. INSTALLATION AND EXECUTION |
| 405-3.4.1. PREPARATION |
| 405-3.4.2. MIXING |
| 405-3.4.3. SPRAYING |
| 405-3.4.4. PREPARATION OF SAMPLES |
| 405-3.4.5. CURING |
405-3.5. TESTING AND ACCEPTANCE
| 405-4. RAVEN 405 EPOXY COATING SYSTEM |
| 405-4.1. SUBMITTALS |
| 405-4.2. MATERIALS |
| 405-4.2.1. PATCHING MIX |
| 405-4.2.2. INFILTRATION CONTROL |
| 405-4.2.3. GROUTING MIX |
| 405-4.2.4. COATING MATERIAL |
| 405-4.2.5. OTHER MATERIALS |
| 405-4.3. INSTALLATION AND EXECUTION |
| 405-4.3.1. PREPARATION |
| 405-4.3.2. APPLICATION |
405-4.4. TESTING & ACCEPTANCE
| 405-5. SPRAYWALL POLYURETHANE COATING SYSTEM |
| 405-5.1. SUBMITTALS |
| 405-5.2. MATERIALS |
| 405-5.2.1. PATCHING MIX |
| 405-5.2.2. INFILTRATION CONTROL |
| 405-5.2.3. GROUTING MIX |
| 405-5.2.4. COATING MATERIAL |
| 405-5.2.5. OTHER MATERIALS |
| 405-5.3. INSTALLATION AND EXECUTION |
| 405-5.3.1. PREPARATION |
| 405-5.3.2. APPLICATION |
405-5.4. TESTING & ACCEPTANCE
| 405-6. INTERNAL MANHOLE CORBEL SEALING SYSTEM |
| 405-6.1. SUBMITTALS |
| 405-6.2. MATERIALS |
| 405-6.2.1. PATCHING MIX |
| 405-6.2.2. INFILTRATION CONTROL |
| 405-6.2.3. COATING MATERIAL |
| 405-6.3. INSTALLATION AND EXECUTION |
| 405-6.3.1. PREPARATION |
| 405-6.3.2. APPLICATION |
| 405-6.3.3. TESTING & ACCEPTANCE |
| 406. SMOKE AND DYE TESTING |
| 406-1. GENERAL PROTOCOL |
| 406-2. REPORTING |
| 406-3. DYE INVESTIGATION |
| 406-3.1. DYE WATER TRACING |
| 406-3.2. DYE WATER FLOODING |
| 406-4. MEASUREMENT AND PAYMENT |
| 406-5. BASIS OF PAYMENT |
| 500 SERIES: POTABLE AND RECLAIMED WATER MAINS, FIRE LINES AND APPURTENANCES |
| 501. SCOPE |
| 502. MATERIALS |
| 502-1. GENERAL |
| 502-2. PIPE MATERIALS AND FITTINGS |
| 502-2.1. DUCTILE IRON PIPE |
| 502-2.1.1. MANUFACTURED RESTRAINED JOINTS FOR DUCTILE IRON PIPE |
| 502-2.1.2. ALTERNATE MECHANICALLY RESTRAINED JOINTS FOR DI PIPE |
| 502-2.1.2.1. Restraints for Ductile Iron Pipe with Mechanical Joint Fittings |
| 502-2.1.2.2. Restraints for Ductile Iron Pipe with Push-on Joints |
| 502-2.1.3. Ductile Iron Pipe Installed with Steel Casings |
| 502-2.1.4. POLYETHYLENE ENCASEMENT FOR BURIED DUCTILE IRON PIPE |
| 502-2.2. POLYVINYL CHLORIDE (PVC) PIPE |
| 502-2.2.1. RESTRAINED JOINT PVC PIPE (DIRECTIONAL BORE) |
| 502-2.3. HIGH DENSITY POLYETHYLENE (HDPE) PIPE |
| 502-2.3.1. MECHANICAL JOINT ADAPTERS (MJ ADPATERS) |
| 502-2.3.2. BUTT FUSION PROCESS AND INSTALLATION |
| 502-2.4. PIPING IDENTIFICATION SYSTEM |
| 502-2.4.1. EXTERIOR MARKINGS FOR BURIED PIPE |
| 502-2.4.2. LOCATION DETECTION WIRE: |
| 502-2.4.3. WARNING TAPE: |
502-2.5. RESTRAINED JOINT COUPLINGS
| 502-3. GATE VALVES |
| 502-4. VALVE BOXES |
| 502-5. HYDRANTS |
| 502-6. SERVICE SADDLES/ POLYETHYLENE SERVICE LINES |
| 502-7. BACKFLOW PREVENTERS |
| 502-8. TAPPING SLEEVES AND LINESTOPS |
| 502-9. LINE STOPPING ASSEMBLIES |
| 502-10. BLOW OFF HYDRANTS |
| 503. CONSTRUCTION |
| 503-1. MATERIAL HANDLING |
| 503-2. PIPE LAYING |
| 503-2.1. INSPECTION PRIOR TO INSTALLATION |
| 503-2.2. GENERAL INSTALLATION REQUIREMENTS |
| 503-2.3. INSTALLATION OF DUCTILE IRON PIPE |
| 503-2.4. INSTALLATION OF POLYVINYL CHLORIDE (PVC) PIPE |
| 503-2.5. DIRECTIONAL BORING INSTALLATION |
| 503-2.5.1. GENERAL REQUIREMENTS |
| 503-2.5.2. SUBMITTALS |
| 503-2.5.3. QUALITY ASSURANCE AND COORDINATION OF WORK |
| 503-2.5.4. HDD PIPE PRODUCTS |
| 503-2.5.5. GENERAL HDD INSTALLATION CONSIDERATION |
| 503-2.5.6. HDD DRILLING EQUIPMENT AND DRILLING FLUID |
| 503-2.5.7. PREPARATION AND MOBILIZATION FOR HDD OPERATIONS |
| 503-2.5.8. ENVIRONMENTAL REQUIREMENTS |
| 503-2.5.9. DRILLING OPERATIONS |
| 503-2.5.10. HDD INSTALLATION |
| 503-2.5.11. DRILLING MUD AND CUTTINGS |
| 503-2.5.12. REAMING AND PULLBACK |
| 503-2.5.13. PIPELINE PROTECTION |
| 503-2.5.14. PIPELINE CLEANING |
| 503-2.5.15. PIPELINE TESTING |
| 503-2.5.16. DISINFECTION FOR HDD POTABLE WATER PIPELINES |
| 503-2.5.17. CITY ACCEPTANCE |
| 503-2.5.18. REPAIR |
| 503-2.5.19. CLEANUP AND REPAIR |
| 503-3. SETTING OF VALVES, HYDRANTS AND FITTINGS |
| 503-3.1. GENERAL |
| 503-3.2. Fittings |
| 503-3.3. VALVES |
| 503-3.4. FIRE HYDRANTS |
| 503-3.5. ANCHORAGE |
503-4. CONNECTIONS TO EXISTING POTABLE WATER OR RECLAIMED WATER LINES
| 504. PIPELINE CLEANING |
| 504-1. PIPELINE PIGGING |
| 504-2. FINAL PIPELINE FLUSHING |
| 505. TESTS |
| 505-1. HYDROSTATIC PIPELINE TESTING |
| 505-2. NOTICE OF TEST |
| 506. DISINFECTION AND TESTING |
| 506-1. DISINFECTION MATERIALS |
| 506-2. FLUSHING SYSTEM |
| 506-3. FINAL DISINFECTION PROCEDURE FOR POTABLE WATER MAINS |
| 506-4. FLUSHING AND RESIDUAL CHLORINE TESTS |
| 506-5. BACTERIALOGICAL TESTS |
| 507. CORRECTION OF NON-CONFORMING WORK |
| 508. OBTAINING WATER FOR FLUSHING AND TESTING |
| 509. MEASUREMENT AND PAYMENT |
| 509-1. GENERAL |
| 509-2. FURNISH AND INSTALL WATER MAINS |
| 509-2.1. MEASUREMENT |
| 509-2.2. PAYMENT |
| 509-3. FURNISH AND INSTALL FITTINGS |
| 509-3.1. MEASUREMENT |
| 509-3.2. PAYMENT |
| 509-4. FURNISH AND INSTALL GATE VALVES COMPLETE WITH BOXES AND COVERS |
| 509-4.1. MEASUREMENT |
| 509-4.2. PAYMENT |
| 509-5. FURNISH AND INSTALL FIRE HYDRANTS |
| 509-5.1. MEASUREMENT |
| 509-5.2. PAYMENT |
| 600 SERIES: STORMWATER |
| 601. RAISING OR LOWERING OF STORM DRAINAGE STRUCTURES |
| 601-1. BASIS OF PAYMENT |
| 602. UNDERDRAINS |
| 602-1. BASIS OF MEASUREMENT |
| 602-2. BASIS OF PAYMENT |
| 603. STORM SEWERS |
| 603-1. TESTING AND INSPECTION |
| 603-2. BASIS OF PAYMENT |
| 604. STORM MANHOLES, INLETS, CATCH BASINS OR OTHER STORM STRUCTURES |
| 604-1. BUILT UP TYPE STRUCTURES |
| 604-2. PRECAST TYPE |
| 604-3. BASIS OF PAYMENT |
| 605. GABIONS AND MATTRESSES |
| 605-1. MATERIAL |
| 605-1.1. PVC COATED WIRE MESH GABIONS & MATTRESSES |
| 605-1.1.1. GABION & MATTRESS BASKETS |
| 605-1.1.2. PVC (POLYVINYL CHLORIDE) COATING |
| 605-1.1.3. GABION AND MATTRESS FILLER MATERIAL |
| 605-1.1.4. GEOTEXTILE FABRIC |
605-2. PERFORMANCE
| 700 SERIES: STREETS AND SIDEWALKS |
| 701. RESTORATION OR REPLACEMENT OF DRIVEWAYS, CURBS, SIDEWALKS AND STREET PAVEMENT |
| 702. ROADWAY BASE AND SUBGRADE |
| 702-1. BASE |
| 702-1.1. BASIS OF MEASUREMENT FOR BASE AND REWORKED BASE |
| 702-1.2. BASIS OF PAYMENT FOR BASE AND REWORKED BASE |
| 702-2. SUBGRADE |
| 702-2.1. BASIS OF MEASUREMENT |
| 702-2.2. BASIS OF PAYMENT |
| 703. ASPHALTIC CONCRETE MATERIALS |
| 703-1. ASPHALTIC CONCRETE |
| 703-1.1. AGGREGATE |
| 703-1.2. BITUMINOUS MATERIALS |
| 703-2. HOT BITUMINOUS MIXTURES – PLANT, METHODS, EQUIPMENT & QUALITY ASSURANCE |
| 703-3. ASPHALT MIX DESIGNS AND TYPES |
| 703-4. ASPHALT PAVEMENT DESIGNS AND LAYER THICKNESS |
| 703-5. GENERAL CONSTRUCTION REQUIREMENTS |
| 703-6. CRACKS AND POTHOLE PREPARATION |
| 703-6.1. CRACKS |
| 703-6.2. POTHOLES |
| 703-7. ADJUSTMENT OF MANHOLES AND APPURTANENCES |
| 703-8. ADDITIONAL ASPHALT REQUIREMENTS |
| 703-9. BASIS OF MEASUREMENT |
| 703-10. BASIS OF PAYMENT |
| 704. ADJUSTMENT TO THE UNIT BID PRICE FOR ASPHALT |
| 705. ASPHALT DRIVEWAYS |
| 705-1. BASIS OF MEASUREMENT |
| 705-2. BASIS OF PAYMENT |
| 706. CONCRETE CURBS |
| 706-1. BASIS OF MEASUREMENT |
| 706-2. BASIS OF PAYMENT |
| 707. CONCRETE SIDEWALKS AND DRIVEWAYS |
| 707-1. CONCRETE SIDEWALKS |
| 707-2. CONCRETE DRIVEWAYS |
| 707-3. CONCRETE CURB RAMPS |
| 707-4. BASIS OF MEASUREMENT |
| 707-5. BASIS OF PAYMENT |
| 708. MILLING OPERATIONS |
| 708-1. EQUIPMENT, CONSTRUCTION & MILLED SURFACE |
| 708-2. ADDITIONAL MILLING REQUIREMENTS |
| 708-3. SALVAGEABLE MATERIALS |
| 708-4. DISPOSABLE MATERIALS |
| 708-5. ADJUSTMENT AND LOCATION OF UNDERGROUND UTILITIES |
| 708-6. ADJUSTMENT OF UTILITY MANHOLES |
| 708-7. TYPES OF MILLING |
| 708-8. MILLING OF INTERSECTIONS |
| 708-9. BASIS OF MEASUREMENT |
| 708-10. BASIS OF PAYMENT |
| 800 SERIES: TRAFFIC SIGNALS, SIGNS AND MARKINGS |
| 801. TRAFFIC SIGNAL EQUIPMENT AND MATERIALS |
| 801-1. BASIS OF MEASUREMENT AND PAYMENT |
| 802. SIGNING AND MARKING |
| 802-1. BASIS OF MEASUREMENT AND PAYMENT |
| 803. ROADWAY LIGHTING |
| 803-1. BASIS OF MEASUREMENT AND PAYMENT |
| 900 SERIES: LANDSCAPING/RESTORATION |
| 901. WORK IN EASEMENTS OR PARKWAYS |
| 902. GENERAL PLANTING SPECIFICATIONS |
| 902-1. IRRIGATION |
| 902-1.1. DESCRIPTION |
| 902-1.1.1. QUALITY ASSURANCE |
| 902-1.1.2. PROJECT CONDITIONS |
| 902-1.1.3. WARRANTY |
| 902-1.2. PRODUCTS |
| 902-1.2.1. GENERAL |
| 902-1.2.2. PIPING |
| 902-1.2.3. PIPE FITTINGS |
| 902-1.2.4. PVC PIPE CEMENT AND PRIMER |
| 902-1.2.5. THREADED CONNECTIONS |
| 902-1.2.6. GATE VALVES |
| 902-1.2.6.1. MANUAL GATE VALVES TWO INCHES (2”) AND SMALLER |
| 902-1.2.6.2. GATE VALVES TWO AND A HALF INCHES (2½”) AND LARGER |
| 902-1.2.7. SLEEVES |
| 902-1.2.8. REMOTE CONTROL VALVES |
| 902-1.2.9. VALVE BOXES |
| 902-1.2.10. AUTOMATIC CONTROL TIMER |
| 902-1.2.11. FIELD TRANSMITTER |
| 902-1.3. EXECUTION |
| 902-1.3.1. GENERAL INSTALLATION REQUIREMENTS |
| 902-1.3.2. EXCAVATING AND BACKFILLING |
| 902-1.3.2.1. TRENCHING - GENERAL |
| 902-1.3.2.2. BACKFILLING |
| 902-1.3.2.3. ROUTING OF PIPING |
| 902-1.3.3. INSTALLATION |
| 902-1.3.3.1. WATER SUPPLY |
| 902-1.3.3.2. ASSEMBLIES |
| 902-1.3.3.3. SLEEVES: (EXISTING BY CITY OF CLEARWATER) |
| 902-1.3.3.4. PLASTIC PIPE |
| 902-1.3.3.5. CONTROLLERS |
| 902-1.3.3.6. REMOTE CONTROL VALVES |
| 902-1.3.3.7. GATE VALVES |
| 902-2. LANDSCAPE |
| 902-2.1. GENERAL |
| 902-2.1.1. REQUIREMENTS OF REGULATORY AGENCIES |
| 902-2.1.2. SCOPE OF WORK |
| 902-2.1.3. QUALITY ASSURANCE |
| 902-2.1.4. SUBMITTALS |
| 902-2.1.5. ALTERNATES, ADDITIONS, DELETIONS, SUBSTITUTIONS |
| 902-2.1.6. ABBREVIATIONS/DEFINITIONS |
| 902-2.1.7. PRODUCT DELIVERY, STORAGE, AND HANDLING |
| 902-2.1.7.1. PLANT MATERIALS |
| 902-2.1.8. JOB CONDITIONS |
| 902-2.1.8.1. ACCEPTANCE OF JOB CONDITIONS. |
| 902-2.1.8.2. SCHEDULING OF WORK |
| 902-2.1.8.3. UTILITIES |
| 902-2.2. PRODUCTS |
| 902-2.2.1. MATERIALS |
| 902-2.2.1.1. PLANT MATERIALS: NOMENCLATURE |
| 902-2.2.1.2. PLANT MATERIALS: QUALITY ASSURANCE |
| 902-2.2.1.3. GRASSES: SOD OR SEED |
| 902-2.2.1.4. MULCH |
| 902-2.2.1.5. STAKES AND GUYS |
| 902-2.2.1.6. PLANTING SOIL |
| 902-2.2.1.7. TREE PROTECTION |
| 902-2.2.1.8. ROOT BARRIER SYSTEM |
| 902-2.2.1.9. PACKAGED MATERIALS |
| 902-2.2.1.10. PESTICIDES |
| 902-2.3. EXECUTION |
| 902-2.3.1. PREPARATION |
| 902-2.3.1.1. OBSTRUCTIONS BELOW GROUND |
| 902-2.3.1.2. GRADING AND PREPARATION FOR PLANT MATERIALS |
| 902-2.3.1.3. PREPARATION FOR ANNUAL BED PLANTING |
| 902-2.3.1.4. PREPARATION FOR SEEDING AND SOD AREAS |
| 902-2.3.2. INSTALLATION |
| 902-2.3.2.1. BERM CONSTRUCTION (IF SPECIFIED) |
| 902-2.3.2.2. LAYOUT OF PLANT MATERIALS |
| 902-2.3.2.3. PLANTING PROCEDURES |
| 902-2.3.2.4. SODDING |
| 902-2.3.2.5. SEEDING |
| 902-2.3.2.6. TREE GUYING, BRACING AND STAKING |
| 902-2.3.2.7. MULCHING |
| 902-2.3.2.8. CLEAN-UP |
| 902-2.3.2.9. PROTECTION |
| 902-2.3.2.10. REPAIR OF DAMAGES |
| 902-2.3.3. MAINTENANCE |
| 902-2.3.4. INSPECTION, REJECTION, AND ACCEPTANCE |
| 902-2.3.4.1. INSPECTION |
| 902-2.3.4.2. REJECTION AND REPLACEMENT |
| 902-2.3.4.3. ACCEPTANCE |
902-2.3.5. WARRANTY
| 903. SODDING |
| 904. SEEDING |
| 905. LAWN MAINTENANCE SPECIFICATIONS |
| 905-1. SCOPE |
| 905-2. SCHEDULING OF WORK |
| 905-3. WORK METHODS |
| 905-3.1. MAINTENANCE SCHEDULING |
| 905-3.2. DUTIES PER SERVICE VISIT |
| 905-3.2.1. LITTER AND DEBRIS |
| 905-3.2.2. VISUAL CHECK |
| 905-3.2.3. PLANT TRIMMING AND PALM PRUNING |
| 905-3.2.3.1. TRAFFIC CONTROL |
| 905-3.2.3.2. PEDESTRIAN SAFETY |
| 905-3.2.4. WEED REMOVAL IN LANDSCAPED AREA |
| 905-3.2.5. MULCH CONDITION |
| 905-3.2.6. IRRIGATION SERVICE AND REPAIR |
| 905-3.2.7. LAWN AND ORNAMENTAL PEST CONTROL |
| 905-3.2.8. PALM FERTILIZATION |
| 905-3.2.9. FREEZE PROTECTION |
| 906. LEVEL OF SERVICE |
| 907. COMPLETION OF WORK |
| 908. INSPECTION AND APPROVAL |
| 909. SPECIAL CONDITIONS |
| 910. TREE PROTECTION |
| 910-1. TREE BARRICADES |
| 910-2. ROOT PRUNING |
| 910-3. PROPER TREE PRUNING |
| 911. IRRIGATION SYSTEM DESIGN |
| 912. IRRIGATION SYSTEM INSTALLATION |
| SectionV - 6 22 2026.pdf |
| PUBLIC CONSTRUCTION BOND |
| CONTRACT |
| CONSENT OF SURETY TO FINAL PAYMENT |
| PROPOSAL/BID BOND |
| AFFIDAVIT |
| NON-COLLUSION AFFIDAVIT |
| PROPOSAL |
| CITY OF CLEARWATER ADDENDUM SHEET |
| BIDDER’S PROPOSAL |
| SCRUTINIZED COMPANIES AND BUSINESS OPERATIONS WITH CUBA AND SYRIA CERTIFICATION FORM |
| SCRUTINIZED COMPANIES THAT BOYCOTT ISRAEL LIST CERTIFICATION FORM |
| ADP6205.tmp |
| INSTRUCTIONS TO BIDDERS |
| GENERAL CONDITIONS |
| TECHNICAL SPECIFICATIONS |
| 3.1 SCOPE OF WORK |
| 3.2 Section IV - Technical Specifications |
| 3.3 Section V - Contract Documents |
| SUPPLEMENTAL TECHNICAL SPECIFICATIONS - Section IVA |
| PRICING SHEET |
| SUBMITTAL REQUIREMENTS |
| 1 Certified Business* |
| Certified Business Type* |
| Certifying Agency* |
| Certification Documentation* |
| 2 Vendor Certification* |
| 3 E-Verify System Certificattion* |
| 4 Scrutinized Company Certification* |
| 5 Compliance with Anti-Human Trafficking Laws* |
| 6 Section V - Contract Documents* |
| 7 W-9* |