NSROC III List of Ongoing Work - October 2021.pdf
PDF 107 KB Posted
- Attached to
- NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary Federal contract opportunity
- Solicitation number
- 80GSFC21R0037-eLibrary
About this file
This document provides details on ongoing and upcoming sounding rocket missions and projects under the NASA Sounding Rocket Operations Contract (NSROC) IV. Approximately 50-80 Development and Routine Project Assignment work orders are in place across various areas including project management, design, fabrication, testing, procurement, analysis, program management, and outreach. Mission periods typically range from days to one year. Additionally, over 50 mission work orders are at various stages of completion, with mission periods from 6 months to several years. The document lists ongoing missions that will transfer to the new NSROC IV contractor at different points in the mission lifecycle, ranging from near-term launches in 2022 through missions planned through 2024. The solicitation seeks proposals for the NSROC IV contract to provide continued support for sounding rocket mission services at National Aeronautics and Space Administration Goddard Space Center launch ranges.
View the file
Other files for this federal contract opportunity
Show all 50
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, eLibrary has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ongoing NSROC III Work in October 2021
There are ~50-80 Development and Routine Project Assignment (DRPA) work orders to perform work in the following areas:
Project management
Drafting
Design and Development
Fabrication
Integrating and testing
Machine or electrical shop operations
Environmental testing
Vehicle hardware/development
Reimbursable missions
Procurement of equipment, hardware, and supplies
Electrical components, wiring, and assembly
Mechanical assembly
Analysis (include thermal, electrical, mechanical, and performance)
NSROC Program Management – including safety, logistics, property, business, financial, procurement
Outreach and Education (i.e. Interns and Co-ops)
Most Wallops entities (including Balloons, Aircraft, Range, etc.) have a DRPA work order in place
Training
Graphics, Web, and Workshop support
The period of performance for these DRPA work orders range from days up to a year. Reference the NSROC III Statement of Work (SOW) for additional details on the DRPA work orders.
Additionally, there are ~50 mission work orders at various stages of completion.
The period of performance for these mission work orders range from 6 months to several years.
As of October 2021 the following missions already in progress will transfer to the NSROC IV Contractor at varying stages of the mission lifecycle (mission closeout occurs 180 days after the launch date). Note that new missions may be added to the manifest throughout the rest of the NSROC III period of performance, so this list will continually change throughout the NSROC IV procurement schedule.
Sounding Rocket Mission Manifest - October 2021
Mission # PI Project Launch Date
Mission Complexity
Level Launch Range*
TAA
Required
36.307 Tun HERSCHEL 3/7/2022 3 WSMR Yes
36.360 Kaeppler INCAA 3/25/2022 3 PFRR Yes
46.031 Kaeppler INCAA 3/25/2022 3 PFRR Yes
36.355 Figueroa Micro-X 4/1/2022 2 WSMR Yes
46.027 Holden BOLT 2 4/4/2022 3 WFF No
47.001 Endurance Endurance 5/16/2022 4 Svalbard Yes
36.367 McEntaffer tREXS 5/23/2022 3 WSMR Yes
36.354 Krueger SOFE-1 6/1/2022 4 WFF No
46.025 Barjatya SEED 6/16/2022 3 Kwajalein No
46.026 Barjatya SEED 6/16/2022 3 Kwajalein No
36.347 McCammon XQC 6/27/2022 2 Australia Yes
36.339 France SISTINE 7/5/2022 2 Australia No
36.350 Fleming DEUCE 7/15/2022 2 Australia No
46.032 Hesh SubTEC 9 8/1/2022 3 WFF No
36.366 Kankelborg FURST 8/1/2022 3 WSMR Yes
36.337 Crump VERIS-2 9/29/2022 2 WSMR No
52.009 Reeves Beam-PIE 10/18/2022 4 PFRR No
41.123 Clemmons TOMEX-Plus 10/18/2022 1 WFF No
41.124 Clemmons TOMEX-Plus 10/18/2022 1 WFF No
36.335 Clemmons TOMEX-Plus 10/18/2022 4 WFF No
36.359 Bounds ACES II 11/16/2022 3 AS Yes
36.364 Bounds ACES II 11/16/2022 3 AS Yes
36.362 Lehmacher VortEx 2/10/2023 3 AS No
36.361 Lehmacher VortEx 2/10/2023 3 AS No
41.128 Lehmacher VortEx 2/10/2023 1 AS No
41.127 Lehmacher VortEx 2/10/2023 1 AS No
45.007 Benna Dissipation 2/12/2023 4 PFRR No
36.381 Michell GIRAFF 3/1/2023 3 PFRR No
36.380 Michell GIRAFF 3/1/2023 3 PFRR No
46.034 Conde AWESOME 3/13/2023 3 PFRR No
46.035 Conde AWESOME 3/13/2023 3 PFRR No
52.010 Conde AWESOME 3/13/2023 4 PFRR No
36.298 McEntaffer OGRE 3/15/2023 3 PFRR Yes
36.375 Fleming INFUSE 4/24/2023 3 WSMR No
36.382 Gilchrist B-SPICE 6/1/2023 4 WFF No
36.376 Jackman MAV-FT 12/1/2023 4 WFF No
36.371 Savage Hi-C Flare 3/1/2024 2 PFRR No
36.370 Glesener FOXSI 3/1/2024 2 PFRR No
36.372 Chamberlin SNIFS 3/1/2024 3 PFRR No
36.377 Jackman MAV-FT 6/3/2024 3 WFF No
36.378 Jackman MAV-FT 12/1/2024 3 WFF No
*Launch Range Abbreviations:
WSMR = White Sands Missile Range, White Sands, New Mexico WFF = Wallops Flight Facility, Wallops Island, Virginia PFRR = Poker Flat Research Range, Fairbanks, Alaska Kwajalein = Regan Test Site, Kwajalein Atoll AS = Andoya Space Andenes, Norway Svalbard = SvalRAK, Svalbard, Norway Australia = Equatorial Launch Australia, Nhulunbuy, Australia