Section_L_Attachment_2C.pdf
PDF 316 KB Posted
- Attached to
- Research, Engineering, Mission Integration Services (REMIS) Federal contract opportunity
- Solicitation number
- NNJ17584385R
About this file
Section L Attachment 2C
View the file
Other files for this federal contract opportunity
Show all 50
Research, Engineering, Mission Integration Services (REMIS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section L, Attachment L-2C
National Aeronautics and
REMIS-TO- 03
Space Administration Date
Johnson Space Flight Center Johnson Space Flight Center, Texas
REMIS
TASK ORDER RFP
ISS External Hardware Storage Platform
Funding Organization: (ISS Program)
Task Order Manager: (NASA/JSC)
Technical Monitor: (NASA/JSC)
Type of Task Order: Firm Fixed Price
1.0 INTRODUCTION
The International Space Station (ISS) Program is asking the Offerors to utilize their commercial approaches defined in their response to DRD REMIS-PM-01, Commercialization Approach
(CA), to design, manufacture, verify, and deliver the External Hardware Storage Platform to
NASA.
NASA has a need to be able to capture external hardware on the ISS and keep it within acceptable temperature limits. For example, the Ammonia Leak Locator (ALL) was designed to be stored internal to the ISS modules, taken out the Japanese Experiment Module (JEM) Airlock, then robotically used to detect ammonia leaks; however, due to the high demand on the JEM
Airlock, it has not been prioritized high enough to even demonstrate the capability.
Additionally, it would be beneficial in terms of response time to be able to immediately robotically grasp the ALL and take it to detect leaks rather than have to schedule the crew time to set up the JEM Airlock to take it out. NASA thinks that additional hardware items might need this type of storage platform too, so this Task Order (TO) asks for a generic capability to park pieces of hardware externally such that they can be maintained thermally but still be grasped by the Special Purpose Dexterous Manipulator (SPDM), removed and reinstalled.
2.0 REQUIREMENTS
The Contractor shall provide a storage platform system that meets the following requirements:
1. Able to capture and structurally retain hardware to include the ALL and other packages with the following characteristics:
a. Minimum dimensions 10 inches in each of x, y, and z
b. Minimum mass of 100 lbm
c. Outer surfaces that are uneven and not necessarily flat
2. Able to operate without assistance from extravehicular Activity (EVA) or ISS Robotics systems to capture, retain, or remove the payload. Assume the Special Purpose Dexterous
Manipulator (SPDM) presents the payload (or target hardware) to the platform, and SPDM is not driving any platform mechanism.
3. Maintain temperatures for captured equipment inside the External Hardware Storage
Platform to within 0 deg F – 145 deg F range without any power interface to the captured hardware itself (i.e., don’t use internal payload heaters within the captured hardware).
4. Interface to ISS camera ports at Camera Port 5 (CP5) or Camera Port 7 (CP7) in accordance with:
a. SSP 42159, Space Station Program Video Camera Support Assembly (VCSA)
Standard Interface Control Document for power and structural interface, or
b. SSP 42159 for power and interface to nearby EVA Worksite Interface (WIF) sockets for structural mounting.
The government has developed a WIF Adapter design that can be made available to the
Offeror upon request. Reference drawing SEG16104177-301, Active WIF Probe
Assembly.
5. Use Ethernet for the command and control interface; wireless Ethernet is preferred.
6. Define cable routing and provide EVA compatible cable restraint hardware that is designed to external environment requirements (reference SSP 57003), if required.
7. Be robotically compatible to allow for the payload (or target hardware item) to be installed and removed with the SPDM.
8. Be remotely commandable from ground control to capture and retain the payload, and conversely to let go of the payload once SPDM has fully grasped it.
9. Stay out of Mobile Servicing System (MSS) robotic corridor, as referenced in SSP
57003, External Payload Interface Requirements Document, paragraph K.3.1.6.2.
10. Comply with applicable requirements of SSP 57003.
11. Can be EVA installed and shall comply with EVA requirements, as referenced in SSP 57003.
If the storage platform is EVA installed, the time to install shall not exceed the duration of 1
EVA. EVA time will be a proposal evaluation criteria.
12. Provide confirmation that the payload is structurally captured and secured.
13. Be one-fault tolerant for the capability to release the payload without EVA or ISS Robotic assist.
14. Have EVA contingency release for the payload or sufficient redundancy to ensure the payload can be removed.
15. On orbit life of 10 year minimum without requiring EVA maintenance.
16. Support installation, activation and 6 months of on-orbit operations.
17. Support launch on an ISS Visiting Vehicle (VV), excluding Russian VV’s. The goal is to launch in an M03, (reference SEG33117683-301) internal dimensions without attenuating foam are (51.75”x 35.06” x 20.75”) cargo bag or smaller. The design should account for added loads attenuating foam.
3.0 STATEMENT OF WORK
All mandatory sections of the Statement of work (SOW) apply to this Task Order (TO).
4.0 DELIVERABLES AND DELIVERY SCHEDULE
A requirements review with NASA will be required within 60 days of authorization.
All products and deliverables are due to NASA 365 days following TO award.
5.0 PRODUCTS
Table 1 – Data
The Offerors are allowed to propose their corporate standards (the proposal shall define the format of their delivery) in delivering the data required below:
No. Item
1 Full set of drawings and schematics
2 Parts List to the level of items that are Orbital Replacement Units (ORUs), if applicable
3 Software Code
4 Safety Data and/or associated products needed to close Hazard Reports
5 Specification
6 Verification Products
7 Inputs for Training, Installation and Operations Procedures
8 CAD Model
Table 2 – Reviews/Support
The Offerors are allowed to propose their corporate standards (the proposal shall define the functions and objectives) in meeting the reviews required below:
1 System Requirements Review
2 At least one Design Review
3 Safety Reviews
4 Acceptance Review
5 Support On-orbit Installation and Initial Operations of the hardware
6 Support training (to include Neutral Buoyance Laboratory [NBL] training)
7 Power and avionics integrated testing, if required
8 Support Flight Readiness Review with the sponsoring organization
Table 3 – Hardware and Software
1 Flight Hardware/Software – One flight unit. Provide a stand-alone option for providing a second flight unit.
2 One set of flight-like training hardware (NBL compatible)
3 ORUs, if applicable – propose sufficient ORUs to support on-orbit operations for 10 years, assuming the hardware is operated continuously with 8 capture/release cycles per year.
Table 4 – DRDs/Additional Information
1 Proposed milestone payments and vouchers
2 REMIS-SI-01, Engineering Technical Documentation
3 REMIS-PM-02, OCI Plan, if necessary
6.0 DELIVERY INSTRUCTIONS
Authorized Government personnel shall accept all products delivered via DD Form 1149.
National Aeronautics and Space
Administration Johnson Space Flight Center
Central Receiving, Bldg. 420 Johnson Space Flight Center, TX 77058
Applicable FAR and NASA FAR Supplement property administration clauses in the blanket contract are applicable to this TO in addition to any clauses in this TO.
Authorized Government personnel shall accept all products delivered via a DD Form 1149 with final acceptance via DD-250 which will occur after on-orbit demonstration
[verification shall be completed prior to flight of the hardware] of all requirements in section 2.0.
7.0 GOVERNMENT FURNISHED PROPERTY (GFP)
If the contractor believes that there is any existing hardware/software, etc. that can benefit the cost effectiveness of their proposed technical approach, propose the hardware in Attachment
1.
NASA facilities required to support both Electromagnetic Interface (EMI), power quality, ISS avionics integration, and NBL testing are provided by NASA and cost accounted for by NASA.
8.0 COST
The Offeror shall provide their proposed cost in accordance with the cost and pricing instructions and templates in Section L.
9.0 FEE EVALUATION PLAN
Not applicable.
10.0 TASK ORDER PLAN (TOP) EVALUATION CRITERIA
The Offeror’s TOP shall include their commercial approach to the requirements listed in this
TOR. At a minimum, the TOP shall address, but not be limited to, the information listed by section in paragraph 10.1, TOP Minimum Contents. The Offeror’s TOP will be evaluated using the evaluation criteria listed in paragraph 10.2, TOP Selection Plan.
10.1 TOP MINIMUM CONTENTS
1. Cost
a. Estimate labor hours,
b. Other direct costs and indirect costs required to deliver products,
c. Estimate of labor categories,
d. Total funding required by fiscal year. Provide funding need dates for an incremental funding approach (identifying long-lead funding items).
2. Proposed technical approach.
a. Summary of design solution, including proposed design parameters, and safety concerns, power and data requirements.
i. Proposal will define the amount of time to fully capture the payload and conversely the time to fully release the payload.
ii. Proposal will provide estimated amount of EVA time required to install the system
iii. Proposal will provide estimated time (EVA and/or Extravehicular robotics [EVR]) to perform maintenance on the system (e.g., ORU replacement)
b. Approach to testing and verification, including test standards/margins used. Testing proposed to meet safety and performance requirements. Highlight component, subsystem, and system level testing. Identify potential options for reducing test costs.
c. Technical risks to meeting cost/schedule.
3. Schedule
a. The schedule delivered as part of the TOP shall be of sufficient detail to ensure that the technical team reviewing the proposals clearly understands the total approach being proposed by the Offerors.
10.2 TOP SELECTION PLAN
The Offeror’s TOP will be evaluated as indicated below:
1. Cost 40%
2. Technical approach 40%
3. Schedule 20%
Attachment 1
Government Furnished Equipment Lists
(List all hardware we plan to make available)
Item # Hardware Part # Quantity
Attachment 2
Title
Document # Title
File details come from the government source that posted it. Updated .