II.I. Amendment 0007.docx
DOCX document 12 KB Posted
- Attached to
- Launch Control Display Panels and Spares Kit
- Solicitation number
- N6660423Q0420
About this file
This amendment clarifies the pricing table and contract line item structure for a solicitation seeking proposals for launch control display panels and spares kits. The base period of performance is from August 2023 through July 2024, with the first option period running from July 2024 through July 2025. Subsequent option periods are not explicitly defined but the amendment replaces the original pricing table to include start and end dates for each contract line item number for the base and option periods. The Department of the Navy Naval Sea Systems Command is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0008 Pricing Table and CLIN structure Clarification.xlsx | XLSX spreadsheet | |
| I.5.b. Eval Criteria Guide Sections L&M REVISED.pdf | ||
| Amendment 0008.docx | DOCX document | |
| Amendment 0007 Pricing Table and CLIN structure Clarification.xlsx | XLSX spreadsheet | |
| Amendment 0006 Pricing Table and CLIN structure Clarification.xlsx | XLSX spreadsheet | |
| Amendment 0006.docx | DOCX document | |
| Final SOW.pdf | ||
| RFQ Rev. 01.pdf | ||
| Amendment 0005 Pricing Table and CLIN structure Clarification.xlsx | XLSX spreadsheet | |
| SOW.pdf | ||
| Amendment 0004 Pricing Table and CLIN structure Rearrangement.xlsx | XLSX spreadsheet | |
| Amendment 3 - Industry Questions.docx | DOCX document | |
| I.5.b. Eval Criteria Guide Sections L&M.pdf | ||
| CDRL Addendum.pdf | ||
| DRAFT SOW.pdf | ||
| RFQ.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0007:
This amendment is to address an industry question.
Question:
The ‘Final SOW 072523’ document specifies that this solicitation will result in a one base period and five option period contract award. The ‘Amendment 0006 Pricing Table and CLIN Structure’ spreadsheet specifies for each option CLIN an “Option Exercised No later than XX SEP 202X” statement, however, each option period of performance start date is not specified. Section L states that for pricing purposes the anticipated period of performance start date of this order is ‘July, 2023’. For scheduling and pricing purposes, please define each Base and Option Year period of performance through the duration of the contract, e.g., Base Period POP: 8/XX/2023 – 7/30/2024, First Option POP: 7/31/24 – 7/30/25, etc.
Answer:
Please see attached updated “Amendment 0006 Pricing Table and CLIN structure Clarification” which now includes start and end dates. As a result “Amendment 0006 Pricing Table and CLIN structure Clarification” is replaced by “Amendment 0007 Pricing Table and CLIN structure Clarification”.