Solicitation N65236-16-R-0001 – Attachment 13 Delivery Order 0001 Statement of Work
SHORT TITLE: Delivery of Advanced Analytics Technical Solution (AATS) Software, Software Documentation/Technical Data Package, and Systems Approach Training (SAT) Materials
1.0 PRIMARY PLACE(S) OF PERFORMANCE
The following site(s) identify contractor employees’ originating office location and the location of government provided facilities, if applicable to this delivery order.
a. Contractor’s facility
2.0 DELIVERY ORDER PURPOSE
2.1 SCOPE
The scope of this delivery order is the delivery of Advanced Analytics Technical Solution (AATS) software, software documentation/technical data package, and Systems Approach to Training (SAT) compliant training materials.
3.0 APPLICABLE DOCUMENTS
3.1 REQUIRED DOCUMENTS
The contractor shall utilize all required documents listed within the basic contract as applicable to this delivery order.
3.2 GUIDANCE DOCUMENTS
The contractor shall utilize all guidance documents listed within the basic contract as applicable to this delivery order.
4.0 SECURITY REQUIREMENTS
Work performed under this delivery order will be “unclassified.”
5.0 COR DESIGNATION
The Contracting Officer Representative (COR) for this delivery order is TBD
6.0 DESCRIPTION OF WORK
6.1 DELIVERY OF AATS SOFTWARE (CLIN 0001)
6.1.1 Within 90 days after delivery order 0001 issuance, the contractor shall deliver the AATS software that is ready for functional integration into the IAS FoS system baseline. The AATS software shall meet the Open Systems Approach requirements of Section 3.1 of the base contract, and the Software Performance Specification requirements of Section 3.2 of the base contract.
6.1.2 Within 90 days of delivery order 0001 issuance, the contractor shall deliver both the nine software user licenses for engineering and logistics activities and the 2574 software user licenses for the follow-on fielding of the AATS software to Marine Corps operating forces. The effective date for software user licenses issued under CLIN 0001 shall be the date of delivery of the software user licenses. .
6.2 DELIVERY OF AATS SOFTWARE DOCUMENTATION/TECHNICAL DATA
PACKAGE (CLIN 0002)
6.2.1 In accordance with the Technical Data Documentation requirements of the base contract, the contractor shall deliver the following AATS Software Documentation/Technical Data Package (CDRL A002), in electronic (searchable and digital) format, within 90 days after delivery order 0001 issuance.
6.2.1.1 Open System Management Plan
6.2.1.2 Software Version Description
6.2.1.3 Software Architecture Diagrams
6.2.1.4 Software Installation Instructions
6.2.1.5 Software Build List
6.2.1.6 Software Troubleshooting Guide
6.2.1.7 Application Programming Interface Documentation
6.2.1.8 Software Development Guide
6.2.1.9 All open Software Trouble Reports filed against the software package version delivered in Section 6.1.
6.2.1.10 System Administrator Manual
6.2.1.11 System User Manual
6.2.1.12 License Activation Instructions
6.3 DELIVERY OF AATS SYSTEMS APPROACH TO TRAINING (SAT) COMPLIANT
TRAINING MATERIALS (CLIN 0003)
6.3.1 In accordance with the Training Package requirements of the base contract, the contractor shall deliver AATS SAT Compliant Training Materials (CDRL A004), in electronic (searchable and digital) format, within 180 days after delivery order 0001 issuance.
6.4 DELIVERY ORDER ADMINISTRATION
6.4.1 Basic Contract Requirement
In accordance with the basic contract and the requirements of this delivery order statement of work, the contractor shall develop and submit documentation (see CDRL under Para 12.1.1) for delivery order administration.
7.0 GOVERNMENT FURNISHED INFORMATION (GFI)
No GFI is provided on this delivery order.
8.0 GOVERNMENT FURNISHED PROPERTY (GFP)
No GFP is provided on this delivery order.
9.0 CONTRACTOR ACQUIRED PROPERTY (CAP)
No CAP is allowed on this delivery order.
10.0 TRAVEL
No travel is required on this delivery order.
11.0 TRANSPORTATION OF EQUIPMENT/MATERIAL
No transportation of equipment/material is required by the contractor on this delivery order.
12.0 DELIVERABLES
12.1 CONTRACT DATA REQUIREMENTS LIST (CDRL)
12.1.1 Administrative CDRL
As referenced under delivery order PWS Para 6.4, the following table lists all required administrative data deliverables, Contract Data Requirements Lists (CDRLs), applicable to this task:
CDRL # Deliverable Title
Delivery Order
PWS
Reference Para
Frequency Date Due
A006 Contract Status Report
6.4 MTHLY
30 Days after delivery order award and monthly on the
10th
A007 Task Order Status Report
6.4, 8.1, 8.2, 8.2.1
MTHLY
30 Days after delivery order award and monthly on the
10th
A008 Task Order Closeout Report 6.4 1TIME NLT 15 Days before completion date
A015 Cost and Milestones Schedule Plan 6.4 One time with revisions
(ONE/R)
NLT 10 Days after delivery order award; revision NLT 7 days after receipt of Government review
A016 Contractor CPARS Draft Approval Document (CDAD) Report
6.4 MTHLY
30 Days after delivery order and monthly on the 10th
12.1.2 Technical CDRL
The following table lists all required technical data deliverables, Contract Data Requirements Lists (CDRLs), applicable to this task:
CDRL # Deliverable Title
Delivery Order
PWS
Reference Para
Frequency Date Due
A002 Technical Analysis Reports 6.2.1.1 through 6.2.1.6, 6.2.1.9 through 6.2.1.12
1TIME Within 90 days
ADC
A003 SW Documentation – Programmer’s Guide
6.2.1.7, 6.2.1.8
1TIME Within 90 days
A004 Training Documentation 6.3 1TIME Within 180 days
13.0 SUBCONTRACTING REQUIREMENTS
Subcontracting requirements are in accordance with the basic contract. If the prime contractor is planning to utilize subcontractor(s) on this delivery order, the prime contractor shall specify the applicable subcontractor in their proposal prior to award. Per clause 52.244-2, if a subcontractor (includes tier 1, tier 2, tier 3, etc.) is proposed by a prime and is not approved on the basic contract, formal justification is required and subject to government approval.
14.0 ACCEPTANCE PLAN
Inspection and acceptance is performed by the COR in accordance with Section E of the base contract and the Quality Assurance Surveillance Plan (QASP).
15.0 OTHER CONDITIONS/REQUIREMENTS
None.
16.0 LIST OF ATTACHMENTS
None.