Amendment 0003 (As Issued).pdf
PDF 28 KB Posted
- Attached to
- ADVANCED ANALYTICS TECHNICAL SOLUTION (AATS)
- Solicitation number
- N65236-16-R-0001
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See page 2.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-May-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N65236-16-R-0001
X 9B. DATED (SEE ITEM 11)
13-Apr-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-May-2017
CODE
US NAVY SPAWARSYSCEN ATLANTIC CHARLESTON
PO BOX 190022 2.0 CONTRACTS
843-218-5941
CALVIN.HOWARD@NAVY.MIL
NORTH CHARLESTON SC 29419-9022
N65236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N65236-16-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following solicitation revisions have been made:
Delete Exhibit A (Contract Data Requirements List) and replace with revised Exhibit A.
o Revised CDRL A006 (Contract Status Reports) and CDRL A007 (Task Order Status Report) financial reporting requirements.
Delete Attachment 4A (Pricing Model (Prime Contractor)) and replace with revised Attachment 4A.
o Directions tab – Revised assumption number 1.
o Summary tab – Corrected cell B51.
o Summary tab – Removed highlighting in cells C84, D84, E84, and F84.
Delete Attachment 4B (Pricing Model (Subcontractor)) and replace with revised Attachment 4B.
o Direction tab - Revised assumption number 6.
o Summary tab - Removed highlighting in cells C32, D32, E32, and F32.
o Burdened labor cost tab - Corrected cell A19.
The following have been modified:
EXHIBITS/ATTACHMENTS
DOCUMENT TYPE DESCRIPTION
Exhibit A Contract Data Requirements List (CDRL) – DD Form 1423
Attachment 1A Reference Information Sheet – Summary Data
Attachment 1B Reference Information Sheet – Contract Specific Data
Attachment 2 Past Performance Questionnaire
Attachment 3 Small Business Participation Sheet
Attachment 4A Pricing Model (Prime Contractor)
Attachment 4B Pricing Model (Subcontractor)
Attachment 5 Small Business Subcontracting Plan Matrix
Attachment 6 IAS Hardware and Software Information
Attachment 7 PWS Section 3.2 Compliance Checklist
Attachment 8 AATS Software Functionality in a DIL Environment
Attachment 9 AATS Software Capabilities Matrix
Attachment 10 Contract Security Classification Specification – DD Form 254
Attachment 11 Quality Assurance Surveillance Plan (QASP)
N65236-16-R-0001
Attachment 12 Wage Determination, 2015-4427, Rev 2
Attachment 13 Delivery Order 0001 Statement of Work
Attachment 14 Cross Reference of CLIN to PWS Section
Attachment 15 Software Licensing Disclosure
Attachment 16 AATS Ontology Sample
(End of Summary of Changes)
File details come from the government source that posted it.