AMENDMENT_2.docx
DOCX document 45 KB Posted
- Attached to
- Repair Station Console (RSC)
- Solicitation number
- N64498-17-R-5093
About this file
This document provides details on Amendment 2 to a contract solicitation and the related federal contract opportunity. The amendment updates cost and level of effort details for contract N64498-18-R-5093 for Repair Station Console support services. The Navy seeks to award a firm fixed price and cost plus fixed fee contract to provide engineering, technical, and program support for planning, installation, testing, operation, repair, and training services for Repair Station Consoles. Key changes in Amendment 2 include decreasing the not-to-exceed amount for support costs from $2.8 million to $2 million, increasing total estimated labor hours from 48,490 to 52,490, removing a contract requirement, and adding a new labor category for Non-Destructive Testing services. The opportunity is open to US companies of any size in NAICS code 334111 with a place of performance in the US.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_Set_3.docx | DOCX document | |
| AMENDMENT_3.docx | DOCX document | |
| Questions_Set_2.docx | DOCX document | |
| Questions_Set_1.docx | DOCX document | |
| N64498-18-R-5093_Amendment_1.docx | DOCX document | |
| N64498-16-R-5093_RSC_Exhibit_B_CDRLs_Cyber_8.8.16.pdf | ||
| Attachment_F_Cost_Summary_Format.xls | XLS spreadsheet | |
| Attachement_G_Labor_Rate_Substantiation_Table.xls | XLS spreadsheet | |
| N64498-16-R-5093_RSC_Exhibit_A_CDRLs_10.28.16.pdf | ||
| N64498-18-R-5093_RSC_Attachment_B_RSC_ILS_SOW_Rev_B.docx | DOCX document | |
| N64498-16-R-5093_RSC_Attachment_C_7.20.16.docx | DOCX document | |
| N64498-16-R-5093_RSC_Attachment_D_1.13.17.xls | XLS spreadsheet | |
| RSC3_DD254_N64498-18-R-5093__02162018.pdf | ||
| Attachment_H_Form_4340_2_GFI.pdf | ||
| N64498-16-R-5093_RSC_Attachment_E_GFI_7.20.16.doc | DOC document | |
| N64498-16-R-5093_RSC_Attachment_A_Perform_Spec_6.20.17.docx | DOCX document | |
| N64498-18-R-5093.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N64498-18-R-5093
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
1. Section B Page 2 CLIN 0027 is hereby updated from:
CLIN 0027 is a not to exceed amount of 2,800,000.00 for Support Cost/ODC
TO:
CLIN 0027 is a not to exceed amount of 2,000,000.00 for Support Cost/ODC
2. Section B Page 2 LEVEL OF EFFORT is hereby updated as followed:
FROM:
The level of effort for the performance of this contract is based upon the anticipated total estimated level of effort of 48,490 man-hours per year of direct labor. The below chart shows the estimated composition of the 48,490 man-hours of direct labor, but note the Government has no intention of exhausting all of these hours during the life of the contract. The purpose of the chart is to show the maximum amount of hours that could be expected for any one labor category. Burden the Engineering Services on top of the Not to Exceed amount, do not try to back into the total of the Not to Exceed amount.
TO:
The level of effort for the performance of this contract is based upon the anticipated total estimated level of effort of 52,490 man-hours of direct labor. The below chart shows the estimated composition of the 52,490 man-hours of direct labor, but note the Government has no intention of exhausting all of these hours during the life of the contract. The purpose of the chart is to show the maximum amount of hours that could be expected for any one labor category. Burden the Engineering Services on top of the Not to Exceed amount, do not try to back into the total of the Not to Exceed amount.
| NSWCPD Labor Category |
| eCRAFT Labor Category |
| eCRAFT Code |
| Primary Location |
| Total Hours at each Location |
| Base Year |
| Year 2 |
| Year 3 |
| Year 4 |
| Year 5 |
| Total |
| CS |
| GS |
| Hours |
| Hours |
| Hours |
| Hours |
| Hours |
| Hours |
| Program Manager |
| Manager, Program/Project II |
| MANP2 |
| *CS/GS |
| 1,695 |
| 1,695 |
| 518 |
| 718 |
| 718 |
| 718 |
| 718 |
| 3,390 |
| Senior Logistics Analyst |
| Analyst, Operations II |
| ANP2 |
| *CS/GS |
| 900 |
| 900 |
| 200 |
| 400 |
| 400 |
| 400 |
| 400 |
| 1,800 |
| Senior Engineer* |
| Engineer, Mechanical III or Engineer, Electrical III |
| EE3 or EM3 |
| *CS/GS |
| 2,000 |
| 2,000 |
| 800 |
| 800 |
| 800 |
| 800 |
| 800 |
| 4,000 |
| Senior Software Engineer* |
| Engineer, Computer IV |
| EC4 |
| *CS/GS |
| 2,000 |
| 2,000 |
| 800 |
| 800 |
| 800 |
| 800 |
| 800 |
| 4,000 |
| Logistics Analyst |
| Analyst, Operations I |
| ANP1 |
| *CS/GS |
| 500 |
| 500 |
| 200 |
| 200 |
| 200 |
| 200 |
| 200 |
| 1,000 |
| Tech Writer |
| Technical Writer III |
| 30463 |
| *CS/GS |
| 450 |
| 450 |
| 180 |
| 180 |
| 180 |
| 180 |
| 180 |
| 900 |
| Engineer |
| Engineer II |
| E2 |
| *CS/GS |
| 3,600 |
| 3,600 |
| 800 |
| 1,600 |
| 1,600 |
| 1,600 |
| 1,600 |
| 7,200 |
| Test Lead |
| Engineer, Mechanical I |
| EM1 |
| *CS/GS |
| 900 |
| 900 |
| 200 |
| 400 |
| 400 |
| 400 |
| 400 |
| 1,800 |
| Field Engineer* |
| Engineer II |
| E2 |
| *CS/GS |
| 4,400 |
| 4,400 |
| 800 |
| 2,000 |
| 2,000 |
| 2,000 |
| 2,000 |
| 8,800 |
| Designer/Engineer Technician |
| Technician, Engineering IV |
| 30084 |
| *CS/GS |
| 1,000 |
| 1,000 |
| 400 |
| 400 |
| 400 |
| 400 |
| 400 |
| 2,000 |
| Computer Programmer |
| Computer Programmer II |
| 14072 |
| *CS/GS |
| 2,000 |
| 2,000 |
| 800 |
| 800 |
| 800 |
| 800 |
| 800 |
| 4,000 |
| Cybersecurity Engineer |
| Engineer II |
| E2 |
| *CS/GS |
| 4,800 |
| 4,800 |
| 1,600 |
| 2,000 |
| 2,000 |
| 2,000 |
| 2,000 |
| 9,600 |
Total
| 24,245 |
| 24,245 |
| 7,298 |
| 10,298 |
| 10,298 |
| 10,298 |
| 10,298 |
| 48,490 |
TO:
| NSWCPD Labor Category |
| eCRAFT Labor Category |
| eCRAFT Code |
| Primary Location |
| Total Hours at each Location |
| Base Year |
| Year 2 |
| Year 3 |
| Year 4 |
| Year 5 |
| Total |
| CS |
| GS |
| Hours |
| Hours |
| Hours |
| Hours |
| Hours |
| Hours |
| Program Manager |
| Manager, Program/Project II |
| MANP2 |
| *CS/GS |
| 1,695 |
| 1,695 |
| 518 |
| 718 |
| 718 |
| 718 |
| 718 |
| 3,390 |
| Senior Logistics Analyst |
| Analyst, Operations II |
| ANP2 |
| *CS/GS |
| 900 |
| 900 |
| 200 |
| 400 |
| 400 |
| 400 |
| 400 |
| 1,800 |
| Senior Engineer* |
| Engineer, Mechanical III or Engineer, Electrical III |
| EE3 or EM3 |
| *CS/GS |
| 2,000 |
| 2,000 |
| 800 |
| 800 |
| 800 |
| 800 |
| 800 |
| 4,000 |
| Senior Software Engineer* |
| Engineer, Computer IV |
| EC4 |
| *CS/GS |
| 2,000 |
| 2,000 |
| 800 |
| 800 |
| 800 |
| 800 |
| 800 |
| 4,000 |
| Logistics Analyst |
| Analyst, Operations I |
| ANP1 |
| *CS/GS |
| 500 |
| 500 |
| 200 |
| 200 |
| 200 |
| 200 |
| 200 |
| 1,000 |
| Tech Writer |
| Technical Writer III |
| 30463 |
| *CS/GS |
| 450 |
| 450 |
| 180 |
| 180 |
| 180 |
| 180 |
| 180 |
| 900 |
| Engineer |
| Engineer II |
| E2 |
| *CS/GS |
| 3,600 |
| 3,600 |
| 800 |
| 1,600 |
| 1,600 |
| 1,600 |
| 1,600 |
| 7,200 |
| Test Lead |
| Engineer, Mechanical I |
| EM1 |
| *CS/GS |
| 900 |
| 900 |
| 200 |
| 400 |
| 400 |
| 400 |
| 400 |
| 1,800 |
| Field Engineer* |
| Engineer II |
| E2 |
| *CS/GS |
| 4,400 |
| 4,400 |
| 800 |
| 2,000 |
| 2,000 |
| 2,000 |
| 2,000 |
| 8,800 |
| Designer/Engineer Technician |
| Technician, Engineering IV |
| 30084 |
| *CS/GS |
| 1,000 |
| 1,000 |
| 400 |
| 400 |
| 400 |
| 400 |
| 400 |
| 2,000 |
| Computer Programmer |
| Computer Programmer II |
| 14072 |
| *CS/GS |
| 2,000 |
| 2,000 |
| 800 |
| 800 |
| 800 |
| 800 |
| 800 |
| 4,000 |
| Non Destructive Test (NDT) Examiner |
| Specialist, Quality Control III |
| SQC3 |
| *CS/GS |
| 2,000 |
| 2,000 |
| 800 |
| 800 |
| 800 |
| 800 |
| 800 |
| 4,000 |
| Cybersecurity Engineer |
| Engineer II |
| E2 |
| *CS/GS |
| 4,800 |
| 4,800 |
| 1,600 |
| 2,000 |
| 2,000 |
| 2,000 |
| 2,000 |
| 9,600 |
Total
| 26,245 |
| 26,245 |
| 8,098 |
| 11,098 |
| 11,098 |
| 11,098 |
| 11,098 |
| 52,490 |
3. Section L 3.2-1 Volume II: Factor 1 Technical is hereby updated
FROM:
1. The Contractor shall furnish the services of qualified engineer(s) to:
(1) Assist in planning, removal, installation, testing, checkout, troubleshooting, calibration, adjustment, operation, disassembly, reassembly, and repair of the RSC.
(8) Provide shipboard technical support during pre-installation ship checks.
(9) Provide shipboard technical support during Sea Trials as required.
(10) Provide on-site technical support.
(11) Provide technical support via electronic communication.
(12) Perform on-the-job instruction and training of Government personnel (military and/or civilian).
(13) Provide on-site technical services at LBES in the development of Government computer programs to support RSC. This shall include modification and integration of Contractor provided software (self-test and all others as required) with Government computer programs.
TO:
1. The Contractor shall furnish the services of qualified engineer(s) to:
(1) Assist in planning, removal, installation, testing, checkout, troubleshooting, calibration, adjustment, operation, disassembly, reassembly, and repair of the RSC.
(2) Provide shipboard technical support during pre-installation ship checks.
(3) Provide shipboard technical support during Sea Trials as required.
(4) Provide on-site technical support.
(5) Provide technical support via electronic communication.
(6) Perform on-the-job instruction and training of Government personnel (military and/or civilian).
(7) Provide on-site technical services at LBES in the development of Government computer programs to support RSC. This shall include modification and integration of Contractor provided software (self-test and all others as required) with Government computer programs.
4. The following is added to section J list of attachments:
ATTACHMENT J – Solicitation Sections A-M additional documents
5. Reference to Software Engineer under Sub-Factor B-5: Personnel on page 177 is hereby updated to Senior Software Engineer.
image1.wmf
File details come from the government source that posted it. Updated .