until 01:00 PM local time 19 Nov 2018
X
A
X B
X C X D
EX
X
G
F 54 - 67
68 - 83
X H 84 - 88 kelly .reusser@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A3 1 88
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N50054 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
NSN BLDG.LF-18 Quarterdeck conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KELLY A REUSSER 757-400-0326
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 3
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
4 - 20
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
22 - 23
24 - 26 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 27 - 30 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 31 - 36 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
37 - 52
PART II - CO NTRACT CLAUSES
MID-ATLANTIC REGIONAL MAINTENANCE CENTER
CODE 411,
9727 AVIONICS LOOP
NORFOLK VA 23511-2124 (757) 396-5041
(757) 396-1762FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N5005418PREVAIL
5. DATE ISSUED
18 Oct 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N5005419R0004
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
Job
USNS PREVAIL (TSV-1) DPMA
FFP
Prepare for and accomplish the Drydock Phased Maintenance Availability for
USNS PREVAIL (TSV-1), SSP No. MARMC-502-19
FOB: Destination
PURCHASE REQUEST NUMBER: N5005418PREVAIL
SIGNAL CODE: J
PSC CD: J998
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
Job
CDRLs
FFP
Data for CLIN 0001 (see DD1423 Exhibit A) Price to be included in the price of
CLIN 0001. NOT SEPARATELY PRICED.
FOB: Destination
PURCHASE REQUEST NUMBER: N5005418PREVAIL
SIGNAL CODE: J
PSC CD: J998
NET AMT
CLAUSES INCORPORATED BY REFERENCE
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) DEC 1995
Section C - Descriptions and Specifications
SECTION C
1.0 SCOPE OF WORK:
The Contractor shall plan and execute all maintenance, repair, and modifications onboard the USNS PREVAIL
(TSV-1) as described herein.
2.0 APPLICABLE DOCUMENTS:
Item No. Title
042-00-001 Work Completion Certification Data for Chief of Naval Operations (CNO) Availabilities;
042-11-001 Accountability of Manhour and Material Reservation; accomplish
077-00-001 Hazardous Waste Produced on Naval Vessels; control
110-11-001 American Bureau of Shipping (ABS) 5 Year Hull Gauging Inspection and
Repair; provide (DRYDOCK)
110-21-001 American Bureau of Shipping (ABS) 5 Year Gauging Inspection and
Repair; accomplish
123-11-001 American Bureau of Shipping (ABS) Survey of Tanks and Voids;
accomplish
123-11-002 Tank and Void; Repair and Preserve
243-12-001 Propulsion Shafting; inspect and repair
245-11-001 Propellers; inspection and repair
424-11-001 Furuno FE-700 Navigational Echo Sounder; replace and test
520-11-001 Sea Valve; repair/replace (DRYDOCK)
521-11-001 Waster Spool Pieces; replace
524-11-001 Auxiliary Seawater Piping System Chemical and Mechanical Cleaning;
accomplish
562-11-001 Rudder, Steering Gear, and Skeg; repair
568-11-001 Bow Thruster; inspect and repair
581-11-001 Anchor and Anchor Handling Assembly; inspect and preserve
631-31-001 Underwater Hull; Preserve
980-11-001 LOA/LOE Inspection Discrepancy Correction Assistance; provide
980-31-002 Office Space Without Computer for In-Plant Availability; provide
982-31-001 Dock Trial, Fast Cruise, and Sea Trial; accomplish
992-11-001 Temporary Service; provide
992-31-001 Cleaning and Pumping; accomplish
993-31-001 Temporary Deck Covering; install
997-11-001 Drydock, Fleet and Undock; accomplish
3.0 REQUIREMENTS:
3.1 The Contractor shall prepare for and accomplish the Drydock Phased Maintenance Availability (DPMA) of
USNS PREVAIL (TSV-1) as delineated in the specification package MARMC-502-19 and as specified herein and in accordance with standard items, work item specifications, drawings, test procedures and other detailed data provided by the government in accordance with Section J. The contractor shall comply with all references listed in
Section 2 above.
3.2 NAVSEA Standard Items have been furnished to each MSRA and ABR Contractor under separate cover for retention. The current NAVSEA Standard Items applicable to work items of this specification are listed in the Index of Specifications, contained in the Specification Package, Attachment J-1 of Section J.
Category I NAVSEA FY-19 Standard Items are applicable to all items without further reference. Category II
NAVSEA FY-19 Standard Items are part of the specification package when invoked and/or referenced in individual work items specified in SSP No. MARMC-502-19. NAVSEA Standard Items may be found at http://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/NSI/FY18-NSI/
3.3 NON SMOKING POLICY: The Contractor shall comply with the Navy's policy regarding smoke-free facilities. The entire vessel, topside and below decks, shall be considered a "No Smoking Area" unless otherwise indicated by shipboard policy.
3.4 PERSONAL PROTECTIVE EQUIPMENT: Whenever work is performed aboard U.S. Naval Ships or vessels at piers or drydocks of a Naval Shipyard or Naval Station, Contractor employees (including management personnel) shall have and use at all times the following personal protective equipment:
(a) Protective hard hats that meet the following specifications:
(1) Protective helmets purchased after July 5, 1994 shall comply with ANSI Z89.1-1986, "American National Standard for Personnel Protection-Protective Headware for Industrial
Workers-Requirements," or shall be demonstrated to be equally effective.
(2) Protective helmets purchased before July 5, 1995 shall comply with ANSI Standard "American
National Standard Safety requirements for Industrial Head Protection," Z89.1-1969, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CFR 1910.135 Head Protection]
(b) Approved type plano or prescription glasses meeting the following specifications:
(1) Protective eye and face devices purchased after July 5, 1994 shall comply with ANSI standard
Z87.1-1989, "American National Standard Practice for Occupational and Educational Eye and
Face Protection", or shall be demonstrated by the employer to be equally effective.
(2) Protective eye and face devices purchased before July 5, 1994 shall comply with ANSI "USA standard for Occupational and Educational Eye and Face Protection", Z87.1-1968, or shall be demonstrated by the employer to be equally effective. [Ref. 29 CRF 1910.133 Protective eye and face devices.]
(c) Safety toe shoes, with built-in protective toe box that meet the following specifications:
(1) Protective footwear purchased after July 5, 1994 shall comply with ANSI Standard Z41-1991, "American National Standard for Personal Protection-Protective Footwear", or shall be demonstrated by the employer to be equally effective.
(2) Protective footwear purchased before July 5, 1994 shall comply with the ANSI standard "USA
Standard for Men's Safety Toe Footwear", Z41.1 1967, or shall be demonstrated by the employer to be equally effective [Ref. 29 CFR 1910.136 Protective eye and face devices.]
3.5 SAFETY INSPECTOR / FIRE MARSHALL: The Contractor shall provide an experienced Safety
Inspector/Fire Marshall who will accomplish daily inspections of the Contractor's entire work area on the ship, together with the Contracting Office’s Safety Representative. This Inspector or Fire Marshall shall not be one of the
Contractor's supervisors or superintendents normally assigned to the ship.
3.6 USE OF BLACK OXIDE COATED BRASS THREADED FASTENERS (BOCBTFS): Due to safety concerns, use of BOCBTFs is not authorized when installing or replacing threaded fasteners in the accomplishment of any work required by any Work Item in this contract.
3.7 COSAL CONFIGURATION CHANGE DOCUMENTATION: The contractor shall document all changes to the ship's configuration and prepare all documentation required to bring the ship's COSAL and SPCC Weapons
Systems Files (WSF) into agreement with the actual end of availability configuration. Perform COSAL/WSF maintenance action on all planned and actual equipments/components/ equipage, whether furnished by the
Government or the Contractor.
http://www.navsea.navy.mil/Home/RMC/CNRMC/Our-Programs/SSRAC/NSI/FY18-NSI/
3.8 PICK-UP OF GOVERNMENT FURNISHED MATERIAL (GFM) BY CONTRACTOR:
(a) Upon notification of job order award by a Mid-Atlantic Regional Maintenance Center (MARMC) Contract
Department representative, the contractor will accept delivery of the (GFM) Government Furnished Material cited in the solicitation package from any and all locations within a 65-mile radius of MARMC, Norfolk, VA. Please contact the cognizant Project Manager to coordinate the pickup of GFM.
(b) The contractor will be required to make an initial pickup of all available GFM at the start of availability and no more than six (6) additional trips for the pickup of GFM for ship availabilities. After initial pickup, growth GFM will be included in the six (6) trips. MARMC Material Department will notify the contractor when additional GFM will be available for pickup, the approximate number of pieces, and the size of the GFM.
(c) These requirements do not supersede specific requirements stated in the work specifications.
3.9 LABOR AND MATERIAL RESERVATIONS IN SPECIFICATION ITEMS: Whenever a specification item includes a reservation work scope which requires that a specified amount of labor mandays and material be provided, the requirements for recordkeeping, approvals, and reconciliations are provided in Specification Item 042-
00-001, Accountability of Manhour and Material Reservation.
3.10 DELIVERY OF GOVERNMENT PROPERTY: All Government property as designated by the Government
Property Administrator (GPA) will be delivered or shipped by the Contractor to one or more location(s) designated by the GPA. The designated location shall be within a 65-mile radius of MARMC (Norfolk Naval Base, Norfolk, VA).
The contractor will be required to make up to five (5) such deliveries with no increase in the Job Order price. A delivery is defined as a designation of specific property to a specific place, but may require multiple loads.
These requirements do not supersede requirements stated in work specifications.
3.11 POST-AWARD SUBMISSION: After receipt of award and prior to starting work aboard the vessel, the contractor must submit a list of employees who will work aboard ship to the Commanding Officer of the ship VIA the Project Manager. The list should be on company letterhead, include each employee's name, social security number, and security clearance when required, and bear the signature of a company official.
3.12 CITIZENSHIP REQUIREMENTS: The contractor shall comply with the Department of Defense Industrial
Security Manual (DoD 5220.22), and any revisions to that manual as of the Bid Opening Date prescribed, for verification of all U. S. Citizens.
Prospective offerors shall refer all questions pertaining to the above to MARMC Security Manager (Code 1123, 757-400-0357).
3.13 USE/POSSESSION OF PERSONAL ELECTRONIC DEVICES (PEDS): The possession and use of portable electronic devices (PEDs) within the confines of any naval vessel, or in the contractor's facility where equipment removed from the vessel is being worked, is strictly controlled.
PEDs include:
mobile computing devices such as personal digital assistants (PDAs);
hand-held or laptop computers;
mobile telephone devices such as data-enabled cellular telephones;
two-way pagers, including those with e-mail capability;
WI-FI Routers
Stand Alone Computers analog and digital sound recorders; and digital cameras, including cellular phones with digital imaging capabilities.
Cellular phones with digital imaging capabilities are strictly prohibited. PEDs may not be connected to any Navy-owned or controlled network. PEDs may not be used to store or process any digital information associated with the conduct of the contract without written authorization from the Naval Supervising Activity (NSA).
3.14 REQUEST FOR CONTRACT CHANGE (RCC): The contractor shall provide all Change Order Price
Analysis (COPA) proposals to the ACO in response to RCCs within seven (7) calendar days. A contractor’s COPA shall remain valid for a minimum of 14 calendar days, unless otherwise specified on an individual RCC by the
ACO; if another timeframe is specified by the Government on an individual RCC, the contractor’s COPA shall remain valid for that amount of time. A COPA addressing a change to the FFP contract shall include
a. Labor hours to be performed by the Prime Contractor __________
b. Subcontractor Quote (If applicable) * $__________
c. Material Quote (If applicable)** $__________
d. Mark-up (If applicable) $__________
*Subcontractor quotes shall include labor hours, labor rate, material (part number, description, unit cost, quantity, total cost, and vendor quotes for each line item), and tiered subcontractor quotes (if applicable)
** Material quote shall include the part number, description, unit cost, quantities, total cost, and vendor quotes for each line item
Note 1: Labor hours for both prime and subcontract shall be provided broken down by trade and labor mix.
Note 2: The required documentation must accompany the COPA for the COPA to be considered submitted to the ACO. See Attachment J-5, QASP, for deductions associated with late or invalid COPA submittals.
If circumstances arise where the contractor is unable to submit a COPA within seven (7) calendar days, the contractor shall notify the ACO in writing of the specific circumstances and provide a revised date in which a COPA proposal will be submitted. Additional time needed to complete a COPA may be granted solely at the discretion of the ACO. The new timeframe granted may differ from the contractor’s requested time frame.
3.15 SUBMISSION OF POST AWARD INFORMATION: When requested by the Contracting Officer, offerors shall submit within 3 days after such request, any or all of the post award information below. Data required by paragraph (a) shall be submitted to the Administrative Contracting Officer. Data required by paragraph (b) shall be submitted directly to the designated Project Manager and the Administrative Contracting Officer. Contact Code
300A at (757) 602-2650, for applicable telephone/fax number.
(a) A procedure and schedule for accomplishing the requirements of the DELIVERY/REDELIVERY
SCHEDULE (B) in Section F, of this solicitation, to permit coordinating the necessary preparations with the ship's force.
(b) A breakdown of the total proposed price by specification item. Each work specification item should show the specification work item number, the specification work item title, the applicable contract line item number (CLIN), mandays (prime and subcontractor), labor dollars (prime and subcontractor), and material dollars (prime and subcontractor). The contractor shall not create any additional work items and costs shall not be shown for standard items. This data may be provided by hard copy or on an executable disk formatted and provided by the Government.
For ships worked in contractors’ facilities, contractors shall submit the heavy weather plan, including engineering calculations, in accordance with NAVSEA Standard Item 009-69 fifteen days prior to the start of the contract availability and anytime an update or change is required (e.g. change in mooring location or arrangement).
3.16 UTILIZATION OF THE NAVY MAINTENANCE DATABASE (NMD): The Contractor shall utilize the
Navy Maintenance Database (NMD) program to perform administrative functions with the Government. The
Contractor shall be responsible for submitting electronic reports, retrieving answered reports, and retrieving requests for contract changes (RCC’s) using NMD. Each individual needing access to NMD will require a PKI certificate and
AISC User Account Request Form. The contractor shall have access within 10 days of contract award.
a. Contractor is required to have internet access for connectivity to NMD and each company personnel using NMD shall acquire a PKI certificate.
b. Each individual needing access to NMD will require approval. The Access Request and Non-
Disclosure Forms may be obtained by sending an email request to Sean Williams at
MARMC_NRFK_NMD_helpdesk@navy.mil.
3.17 CONDITION FOUND REPORTS: The contractor will identify needed repairs and recommend corrective action during contract performance for those deficiencies discovered which are not covered by the work specifications. Needed repairs and corrective action reported will be submitted to the Government in the form of a
Condition Found Report (CFR).
CFR’s supporting data will be submitted via NMD within five workings days of identification of the requirement.
As a minimum, the CFR will include the following:
a. Identify contract number, ship, and hull number
b. Serialized by CFR number
c. Identification of the applicable Work Item number
d. Date requirement was discovered
e. Description of work requirement
f. Specific location of the work
g. Recommendation for corrective action
h. Recommendation for the appropriate/best time to accomplish the work (with or without schedule change).
Provide supporting rational for the recommendation, such as price efficiencies, availability of the work force, availability of material, premium expenditures etc.
i. Identification of related changes, if any, to the internal milestones and production and contract completion dates. If none, so state.
j. The surveillance of the contract resulting from this solicitation may be accomplished in part, by contractor personnel.
k. After the Project Manager has approved a Request for Contract Change (RCC), Contractor shall provide a
Class “F” estimate within three (3) business days and/or followed by a Class “C” estimate within five (5) business days for a total of eight (8) estimating days. Contractor’s proposal shall be submitted in Four-E-format, paragraph and sub-paragraph estimating using labor hours and material dollars for each.
3.18 SPECIAL REQUIREMENTS: The place of performance is restricted to the Norfolk, VA Homeport Area.
3.19 PAST PERFORMANCE ASSESSMENT: The contractor, in performing this Contract, will be subject to a past performance assessment in accordance with FAR 42.15 and the Department of the Defense Contractor
Performance Assessment Reporting System (CPARS) Policy Guide in effect on the date of award. All information contained in this assessment may be used, within the limitations of FAR 42.15, by the Government for future source selection in accordance with FAR 15.304 when past performance is an evaluation factor for award.
HQ C-2-0040 Plant Protection SEP 2016
HQ C-2-0048 REQUISITIONS FROM THE FEDERAL SUPPLY
SYSTEM (NAVSEA) (JUL 1992)
MAR 2003
mailto:MARMC_NRFK_NMD_helpdesk@navy.mil
CLAUSES INCORPORATED BY FULL TEXT
HQ C-1-0001 ITEM(S) 0002 - DATA REQUIREMENTS (NAVSEA) (SEP 1992)
All items and furnished data shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto.
HQ C-2-0003 ACCESS TO THE NAVY SUPPLY SYSTEM (NAVSEA) (MAR 2011)
(a) In compliance with the comparability requirement of 10 U.S.C. 7314, Public and Private Shipyards will be provided equal access to the Naval Supply System. Use by private yards is permissive, not mandatory.
(b) Pursuant to the clause of this contract entitled "GOVERNMENT SUPPLY SOURCES" (FAR 52.251-1) the
Contracting Officer hereby authorizes the Contractor to place orders with the Navy Supply System for materials and equipment or other supplies necessary to perform the required work. The Naval Supply System shall process such orders in the same manner as it would for any other Navy supply user, and the Contractor shall make payment on account of materials and equipment and other supplies ordered and/or received in accordance with the normal requirements of the Naval Supply Systems Command, but in no event shall payment in full be any later than 30 days after receipt by the Contractor of each order. The Contractor shall pay the Naval Supply System any costs for materials, equipments, or other supplies obtained including any surcharges normally charged to any other Naval
Supply System user.
(c) This job order has been priced on the basis that, except as specifically provided elsewhere in this contract with regards to Government furnished property, the Contractor shall provide all necessary materials, equipments and supplies for performance of this contract. If the Contractor uses the Naval Supply System, it has elected to use the system for its own convenience to meet its contractual obligations to perform the work under this contract. The
Naval Supply System is considered to be an alternate source or vendor of contractor furnished material; therefore materials, equipments, or other supplies ordered and/or obtained from the Naval Supply System are specifically not considered to be Government furnished material, but are considered to be contractor furnished material. The
Government makes no representation as to the availability of materials, equipments, or other supplies for the performance of the work required under this contract, nor shall unavailability, late delivery, delivery of non-conforming supplies, higher costs of the Naval Supply System (if any), or any failure of the Naval Supply System to meet the expectations or requirements of the Contractor constitute excusable delay or grounds for equitable or any other adjustment to the contract or relief from the requirement to perform in accordance with the terms of the contract.
HQ C-2-0004 ACCESS TO THE VESSEL(S) (NAVSEA) (SEP 2016)
Officers, employees and associates of other prime Contractors with the Government and their subcontractors, shall, as authorized by the Supervisor, have, at all reasonable times, admission to the plant, access to the vessel(s) where and as required, and be permitted, within the plant and on the vessel(s) required, to perform and fulfill their respective obligations to the Government. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Supervisor to be given admission to the plant and access to the vessel(s) for office space, work areas, storage or shop areas, or other facilities and services, necessary for the performance of the respective responsibilities involved, and reasonable to their performance.
HQ C-2-0005 ACCESS TO THE VESSELS BY NON-U.S. CITIZENS (NAVSEA) (SEP 2016)
(a) No person not known to be a U.S. citizen shall be eligible for access to naval vessels, work sites and adjacent areas when said vessels are under construction, conversion, overhaul, or repair, except upon a finding by
COMNAVSEA or his designated representative that such access should be permitted in the best interest of the
United States. The Contractor shall establish procedures to comply with this requirement and NAVSEAINST
5510.3 (series) in effect on the date of this contract or agreement.
(b) If the Contractor desires to employ non-U.S. citizens in the performance of work under this contract or agreement that requires access as specified in paragraph (a) of this requirement, approval must be obtained prior to access for each contract or agreement where such access is required. To request such approval for non-U.S. citizens of friendly countries, the Contractor shall submit to the cognizant Contract Administration Office (CAO), an Access
Control Plan (ACP) which shall contain as a minimum, the following information:
(1) Badge or Pass oriented identification, access, and movement control system for non-U.S. citizen employees with the badge or pass to be worn or displayed on outer garments at all times while on the Contractor's facilities and when performing work aboard ship.
(i) Badges must be of such design and appearance that permits easy recognition to facilitate quick and positive identification.
(ii) Access authorization and limitations for the bearer must be clearly established and in accordance with applicable security regulations and instructions.
(iii) A control system, which provides rigid accountability procedures for handling lost, damaged, forgotten or no longer required badges, must be established.
(iv) A badge or pass check must be performed at all points of entry to the Contractor's facilities or by a site supervisor for work performed on vessels outside the Contractor's plant.
(2) Contractor's plan for ascertaining citizenship and for screening employees for security risk.
(3) Data reflecting the number, nationality, and positions held by non-U.S. citizen employees, including procedures to update data as non-U.S. citizen employee data changes, and pass to cognizant CAO.
(4) Contractor's plan for ensuring subcontractor compliance with the provisions of the Contractor's ACP.
(5) These conditions and controls are intended to serve as guidelines representing the minimum requirements of an acceptable ACP. They are not meant to restrict the Contractor in any way from imposing additional controls necessary to tailor these requirements to a specific facility.
(c) To request approval for non-U.S. citizens of hostile and/or communist-controlled countries (listed in Department of Defense Industrial Security Manual, DOD 5220.22-M or available from cognizant CAO), Contractor shall include in the ACP the following employee data: name, place of birth, citizenship (if different from place of birth), date of entry to U.S., extenuating circumstances (if any) concerning immigration to U.S., number of years employed by
Contractor, position, and stated intent concerning U.S. citizenship. COMNAVSEA or his designated representative will make individual determinations for desirability of access for the above group. Approval of ACP's for access of non-U.S. citizens of friendly countries will not be delayed for approval of non-U.S. citizens of hostile communist-controlled countries. Until approval is received, Contractor must deny access to vessels for employees who are non-
U.S. citizens of hostile and/or communist-controlled countries.
(d) The Contractor shall fully comply with approved ACPs. Noncompliance by the Contractor or subcontractor serves to cancel any authorization previously granted, in which case the Contractor shall be precluded from the continued use of non-U.S. citizens on this contract or agreement until such time as the compliance with an approved
ACP is demonstrated and upon a determination by the CAO that the Government's interests are protected. Further, the Government reserves the right to cancel previously granted authority when such cancellation is determined to be in the Government's best interest. Use of non-U.S. citizens, without an approved ACP or when a previous authorization has been canceled, will be considered a violation of security regulations. Upon confirmation by the
CAO of such violation, this contract, agreement or any job order issued under this agreement may be terminated or default in accordance with the clause entitled "DEFAULT (FIXED-PRICE SUPPLY AND SERVICE)" (FAR
52.249-8), "DEFAULT (FIXED-PRICE RESEARCH AND DEVELOPMENT)" (FAR 52.249-9) or
"TERMINATION (COST REIMBURSEMENT)" (FAR 52.249-6), as applicable.
(e) Prime Contractors have full responsibility for the proper administration of the approved ACP for all work performed under this contract or agreement, regardless of the location of the vessel, and must ensure compliance by all subcontractors, technical representatives and other persons granted access to U.S. Navy vessels, adjacent areas, and work sites.
(f) In the event the Contractor does not intend to employ non-U.S. citizens in the performance of the work under this contract, but has non-U.S. citizen employees, such employees must be precluded from access to the vessel and its work site and those shops where work on the vessel's equipment is being performed. The ACP must spell out how non-U.S. citizens are excluded from access to contract work areas.
(g) The same restriction as in paragraph (f) above applies to other non-U.S. citizens who have access to the
Contractor's facilities (e.g., for accomplishing facility improvements, from foreign crewed vessels within its facility, etc.) except that, with respect to access to the vessel and worksite, the restrictions shall not apply to uniformed U.S.
Navy personnel who are non-U.S. citizens and who are either assigned to the ship or require access to the ship to perform their duties.
HQ C-2-0006 ADDITIONAL PROVISIONS RELATING TO GOVERNMENT PROPERTY (NAVSEA)
(SEP 2009)
(a) For purposes of paragraph (h) of the clause entitled "GOVERNMENT PROPERTY" (FAR 52.245-1) in addition to those items of property defined in that clause as Government Property, the following shall also be included within the definition of Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores;
(4) cargo; and
(5) other material on the vessel
(b) For purposes of paragraph (b) of the clause entitled "GOVERNMENT PROPERTY", notwithstanding any other requirement of this contract, the following shall not be considered Government Property:
(1) the vessel;
(2) the equipment on the vessel;
(3) movable stores; and
(4) other material on the vessel
HQ C-2-0007 APPROVAL BY THE GOVERNMENT (AT) (NAVSEA) (JAN 1983)
Approval by the Government as required under this contract and applicable specifications shall not relieve the
Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
HQ C-2-0010 COMMAND INSPECTION OF BERTHING FACILITIES (NAVSEA) (OCT 1990)
(a) Once the ship's force takes occupancy of a berthing facility, it is recognized that the premises will be under the control of the Department of the Navy and subject to inspections by the Commanding Officer or his duly authorized representative(s). In recognition of (1) the Navy's need to ensure security, military fitness, and good order and discipline and (2) the Navy's policy to conduct regularly scheduled periodic inspections, the Contractor hereby agrees that while its berthing facilities are occupied by ship's force, the Commanding Officer or his duly authorized representative(s) has (have) the right to conduct command inspections of the berthing facilities occupied by ship's force.
(b) In instances where the Contractor is using commercial facilities to satisfy the berthing requirement, the
Contractor hereby agrees to insert the following requirement in any Subcontract for berthing facilities to be provided under this Contract:
(c) In recognition of (1) the Navy's need to ensure security, military fitness, and good order and discipline, and (2) the Navy's policy to conduct regularly scheduled periodic inspections, (insert names of Subcontractor) hereby agrees that while its facilities are occupied by ship's force, the Commanding Officer or his duly authorized representative(s) has (have) the right to conduct Command inspections of the facilities occupied by ship's force.
HQ C-2-0014 CONTRACTOR'S PROPOSAL (NAVSEA) (MAR 2001)
(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in the Proposal dated in response to NAVSEA Solicitation No.
N0054-19-R-0004.
(b) The technical volume(s) of the Contractor's proposal is incorporated by reference and hereby made subject to the provisions of the "ORDER OF PRECEDENCE" (FAR 52.215-8) clause of this contract. Under the "ORDER OF
PRECEDENCE" clause, the technical volume of the Contractor's proposal referenced herein is hereby designated as item
(f) of the clause, following "the specification" in the order of precedence.
HQ C-2-0016 DEPARTMENT OF LABOR SAFETY AND HEALTH STANDARDS FOR SHIP REPAIR (NAVSEA)
(APR 2015)
Attention of the Contractor is directed to the Occupational Safety and Health Act of 1970 (29 USC 651-678), and to the Safety and Health Regulations for Ship Repairing (29 CFR 1915), promulgated under Public Law 85-742, amending Section 41 of the Longshoremen's and Harbor Workers' Compensation Act (33 USC 941), and adopted by the Department of Labor as occupational safety or health standards under Section 6(a) of the Occupational Safety and Health Act of 1970 (See 29 CFR 1910.15). These regulations apply to all ship repair and related work, as defined in the regulations performed under this contract on the navigable waters of the United States including any dry dock and marine railway. Nothing contained in this contract shall be construed as relieving the Contractor from any obligations, which it may have for compliance with the aforesaid regulations.
HQ C-2-0018 DISPOSAL OF SCRAP (NAVSEA) (JAN 2008)
(a) All Government scrap resulting from accomplishment of any job order is the property of the Contractor to be disposed as it sees fit. Scrap is defined as property that has no reasonable prospect of being sold except for the recovery value of its basic material content. The determination as to which materials are scrap and which materials are salvage, will be made, or concurred in, by the duly appointed Property Administrator for the cognizant SUPSHIP or RMC Office.
(b) As consideration for retaining the Government's scrap, the Contractor's price for the performance of the work required herein shall be a net price reflecting the value of the Government scrap.
(c) This requirement is not intended to conflict in any way with the clauses of this contract entitled
"PERFORMANCE" (DFARS 252.217-7010) or "GOVERNMENT PROPERTY" (FAR 52.245-1) under the Master
Contract in effect at the time of job order award, nor does it relieve the Contractor of any other requirement under such clauses.
HQ C-2-0020 DOCK TRIALS AND FAST CRUISE (NAVSEA) (MAY 1993)
(a) Dock Trials. The purpose of this trial is to conduct preliminary tests necessary to ensure that the ship is ready for operating at sea. Ship's personnel will conduct all tests and perform all operational functions; however, Contractor personnel will observe tests, record data, and make minor repairs and adjustments as necessary. The dock trial shall be scheduled in accordance with Work Item 982-31-001. Contractor personnel are not to interfere with functions of ship's personnel.
(b) Fast Cruise. The "fast cruise" is a simulated underway period. The purpose of fast cruise is to test to the maximum extent possible, the ship's material and operational readiness condition. This includes normal watch stations and engineering casualty control procedures. Contractor personnel will not be allowed onboard during this period unless specifically requested by the Supervisor. Fast cruise shall be scheduled after dock trials and prior to sea trials as cited in Specification Item 982-31-001.
HQ C-2-0021 DRYDOCK CERTIFICATION (NAVSEA) (APR 2015)
The drydocking of all vessels on or after 1 January 1980 shall be accomplished in dry docks certified in accordance with MIL-STD-1625D(SH) dated 27 August 2009 as invoked by NAVSEA Standard Item 009-01.
HQ C-2-0023 EXCLUSION OF MERCURY (NAVSEA) (MAY 1998)
Mercury or mercury containing compounds shall not be intentionally added or come in direct contact with hardware or supplies furnished under this contract.
HQ C-2-0024 EXTENSION OF COMMERCIAL WARRANTY (NAVSEA) (NOV 1996)
The Contractor shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that such warranty is available at no additional cost to the
Government. The Contractor shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software.
Acceptance of the standard commercial warranty does not waive the Government’s rights under the “Inspection” clause, nor does it limit the Government’s rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.
HQ C-2-0028 GOVERNMENT SURPLUS PROPERTY (NAVSEA) (SEP 1990)
No former Government surplus property or residual inventory resulting from terminated Government contracts shall be furnished under this contract unless (i) such property is identified in the Special Contract Requirements or (ii) is approved in writing by the Contracting Officer. Notwithstanding any such identification in the Special Contract
Requirements or approval by the Contracting Officer, the Contractor agrees all items or components described in this requirement shall comply in all respects with the specifications contained herein.
HQ C-2-0029 HEAVY WEATHER PLAN (NAVSEA) (JUN 1999)
In order to ensure that Naval vessels and material are protected during gales, storms, hurricanes and destructive weather, the Contractor is required to have a written Heavy Weather Plan (HWP) which assigns responsibilities and prescribes actions to be taken on the approach of and during heavy weather conditions as delineated in NAVSEA
Standard Item (SI) 009-69. In accordance with SI 009-69, the Contractor shall furnish to the cognizant
Shipbuilding, Conversion and Repair, U.S. Navy, a copy of such HWP, and shall make such changes in the plan as the Supervisor considers necessary and reasonable to protect and care for vessels and machinery and equipment to be installed therein.
In the event the Supervisor directs the Contractor to implement the HWP pursuant to SI 009-69 the Contractor may submit to the Contracting Officer a request for reimbursement for costs resulting from such actions together with any documentation that the Contracting Officer may reasonably require. The Government shall reimburse the
Contractor for all reasonable, allowable and allocable costs resulting from the Contractor's implementation of the
HWP based on such Government direction.
HQ C-2-0030 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT (FIXED-PRICE)
(NAVSEA) (SEP 2009)
(a) Contract Specifications. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications set forth in Section C.
(b) Contract Drawings and Data. The Government will furnish contract drawings, design agent drawings, ship construction drawings, and/or other design or alteration data cited or referenced in Section C or in the contract specification as mandatory for use or for contract performance.
(c) Government Furnished Information (GFI). GFI is defined as that information essential for the installation, test, operation, and interface support of all Government Furnished Material enumerated on NAVSEA Form 4205/19 or
Schedule A, as applicable, attached to the contract. The Government shall furnish only the GFI identified on the
NAVSEA Form 4340/2 or Schedule C, as applicable, attached to the contract. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI on the
NAVSEA Form 4340/2 or Schedule C, as applicable, as follows:
(1) The Contracting Officer may at any time by written order:
(i) Delete, supersede, or revise, in whole or in part, data listed or specifically referenced in NAVSEA
Form 4340/2 or Schedule C, as applicable; or
(ii) Add data items or information to NAVSEA Form 4340/2 or Schedule C, as applicable;or
(iii) Establish or revise due dates for items of data or information in NAVSEA Form 4340/2 or
Schedule C, as applicable.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract price and delivery schedule in accordance with the procedures provided for in the clause of this contract entitled "CHANGES--FIXED-PRICE" (FAR 52.243-
1).
(d) Except for the Government information and data specified by paragraphs (a), (b), and (c) above, the
Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI listed on the NAVSEA Form 4340/2 or Schedule C, as applicable, the clause of this contract entitled
"GOVERNMENT PROPERTY" (FAR 52.245-1) or "GOVERNMENT PROPERTY INSTALLATION
OPERATION SERVICES " (FAR 52.245-2), as applicable, or any other term or condition of this contract.
(e) Referenced Documentation. The Government will not be obligated to furnish Government specifications and standards, including Navy standard and type drawings and other technical documentation, which are referenced directly or indirectly in the contract specifications set forth in Section C and which are applicable to this contract as specifications. Such referenced documentation may be obtained:
(1) From the ASSIST database via the internet at http://assist.dla.mil/
; or
(2) By submitting a request to the
Department of Defense Single Stock Point (DoDSSP)
Building 4, Section D
700 Robbins Avenue
Philadelphia, Pennsylvania 19111-5094
Telephone (215) 697-6396
Facsimile (215) 697-9398.
Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.
HQ C-2-0044 PROTECTION OF THE VESSEL (NAVSEA) (SEP 1990)
(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been off-loaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free
Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.
(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirty-five degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipe-lines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage. The vessel's stern tube and propeller hubs shall be protected by the Contractor from frost damage by applied heat through the use of a salamander or other proper means.
HQ C-2-0045 QUALIFICATION OF CONTRACTOR NON-DESTRUCTIVE TESTING (NDT) PERSONNEL
(NAVSEA) (SEP 2016)
(a) The Contractor and any Non-destructive Testing (NDT) subcontractor shall utilize for the performance of required NDT, only Level I, II and III personnel currently certified in accordance with NAVSEA Technical
Publication T9074-AS-GIB-010/271, (The contract specialist shall insert the latest technical publication revision and date located in INAVSEA listing of instructions/publications). Documentation pertaining to the qualification and certification of NDT personnel shall be made available to the Contracting Officer for review upon request.
(b) These requirements do not apply with respect to nuclear propulsion plant systems and other matters under the technical cognizance of the Office of Navy Nuclear Propulsion (NAVSEA 08). Because of health and safety considerations, such matters will continue to be handled as directed by NAVSEA 08.
HQ C-2-0047 REMOVALS (NAVSEA) (SEP 1990)
The Contracting Officer may, by written notice to the Contractor, direct removal of any or all of the property from storage. Within the shortest practicable time after receipt of such notice, but in no event more than thirty (30) days thereafter, unless a longer period is agreed to by the parties hereto, the Contractor will dismantle, prepare for shipment and load the item of property affected, on a common carrier at the place of storage in accordance with sound industrial practice and such instructions as the Contracting Officer may issue. The Contracting Officer may, by written notice to the Contractor direct the return of any item of the property removed, and the Contractor shall store the property at the Plant as provided for in Section F. In the event such items are removed and forwarded to a
Government depot or to a party other than the Contractor, removal and return to storage of said items shall be at the expense of the Government.
HQ C-2-0051 SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements.
All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only.
HQ C-2-0053 STANDARDIZATION - ALTERNATE I (NAVSEA) (MAR 2011)
(a) In order to support commonality and or standardization, variation within systems, sub-systems and components across the fleet must be reduced. When it is necessary for the Contractor to replace equipment (e.g., changes have been made to requirements, systems, sub-systems or components) or where such sub-systems, equipments or components are not available, the Contractor shall select Hull Mechanical and Electrical (HM&E) equipment/components in the following order:
(b) The Virtual Shelf items are to be applied if they meet the contract requirements. The Virtual Shelf is a repository of Total Ownership Cost (TOC) preferred Common designs. NAVSEA Commonality Program identified
HM&E equipment/components for the Virtual Shelf that meet cross platform requirements and specifications and provide superior TOC. Information to gain access to the Virtual Shelf is located on the following web site:
http://acc.dau.mil/commonality.
Some equipment listed on the Virtual Shelf may have supporting commodity contracts. For the Virtual Shelf Items supported by commodity contracts, a supporting commodity contract will appear in the HM&E corridor of the DoD
EMall (https://dod-emall.dla.mil/acct/welcome.action). These contracts include provisions for direct contractor orders against the contracts.