Government responses to bidders questions 26-28

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO: 123-11-002

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 562-11-001

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 110-21-001

TITLE:

PARA. NO:

PAGE NO:

ITEM NO:

TITLE:

PARA. NO:

PAGE NO:

ITEM NO:

TITLE:

PARA. NO:

PAGE NO:

ITEM NO:

TITLE:

PARA. NO:

PAGE NO:

ITEM NO:

TITLE:

PARA. NO:

PAGE NO:

GOVERNMENT RESPONSE:

GOVERNMENT RESPONSE:

GOVERNMENT RESPONSE:

CONTRACTOR QUESTION 26: Is the material that is called out in paragraphs 3.4.4 and 4.4 the total amount of piping required for paragraph

3.4.3 for the tank locations listed in 1.2, minus the stated valves, flanges, backing rings, deck sleeves, elbows and bends? Is the intent of this work item to replace all piping associated with each of the 43 tanks listed in paragraph 1.2?

GOVERNMENT RESPONSE: 4.4 is not correct and will not be contractual. ERRATA will be issued. Pipe listed in 3.4.3 will be utilized for all locations in 1.2 as required .

CONTRACTOR QUESTION 27: After the operational test it states submit a report with recommended repairs then in 3.14 it says to remove existing equipment. Are we overhauling the steering units or just putting in a report with recommended repairs?

GOVERNMENT RESPONSE: A report is to submitted with any recommended repairs.

GOVERNMENT RESPONSE: Note 4.1 does not apply to preservation.

An ERRATA will be issued changing 3.14 to read for preservation of surfaces in 1.2 vice 2.1. The intent is to perserve the main deck, masts, superstructure exterior including all appendages and platforms and port and starboard intakes and exhaust exteriors.

CONTRACTOR QUESTION 28: Is the intention to preserve all the decks listed in 1.2.1 (Main Deck and above Decks) and noted in 4.1 or just the

Main Deck as specifically listed in 3.13? Also, should 3.14 read 'for preservation of surfaces in (1.2.1 vice 2.1) being preserved in 3.13'?

GOVERNMENT RESPONSE:

REQUEST FOR SPECIFICATION CLARIFICATION

TITLE: USNS PREVAIL (TSV-1) Drydock Phased Maintenance Availability (DPMA) MARMC POC: Kelly Reusser

MARMC PHONE: (757) 400-0326