CVN74_CVN73_Design Information Memo_Attachment 10
Category: 1a
Type: _IC Circuit
DESIGN INFORMATION MEMO (DIM)
ACTION NO.: DIM-CVN73-SA9369D-0001
SUBMITTAL DATE: _10/1/15_____
REQUESTED RESPONSE DATE: _10/13/15_____
FROM:
TO: SUPERVISOR OF SHIPBUILDING - NN ATTENTION: CODE 152
HULL: CVN 73 USS GEORGE WASHINGTON
SCD/ SWLIN / ITEM: SHIPALT 9369D/43693-001.00
TITLE / SUBJECT: IC CKT 3TK CABLE LEAD NUMBERS
REFERENCES: a) 401-8654854
b) 401-8509837
QUESTION OR ACTION REQUIRED:
Reference (a) requires 26 cable lead numbers for IC circuit 3TK as part of the installation of Potable Water
Radar Tank Level Indicators. Based on the preference for standardization of labelling for Shipalts/SCDs performed in Propulsion Plant areas as recently expressed by RPPY/PPEA, NNS would like to use cable lead numbers C-3TK101 through C-3TK126 to match Reference (b) which performed this same Shipalt for CVN72.
NNSY is requested to either verify the suggested cable lead numbers are acceptable and document them or provide 26 different cable lead numbers for IC circuit 3TK.
ORIGINATOR __ C Donaldson PHONE: _757-xxx-xxxx DATE: 9/28/2015___
APPROVED BY: _ D Richardson__________ DEPT: 123-C134 __ DATE: 9/28/2015__
ANSWER/ACTION TAKEN:
NNSY concurs with the use of cable lead numbers C-3TK101 through C-3TK126 for CVN-73. Our record has been updated accordingly.
COMPLETED BY: Kevin Nguyen_________ ORGANIZATION: NNSY C271 ___________ PHONE: 395-5091
APPROVED BY: _ T. Colasurdo___________ DEPT: C271 __ DATE: 10/13/2015 _____
Statement of limitation of authority: This correspondence and/or its possible attachments do not constitute a change in the contractor's contractual obligation. Authority to direct or make changes or commitments for the government that will affect price, quality, quantity, delivery and any other terms or conditions outside of the scope of the contract is held by the Contracting
Officer. If the contractor believes these statements change your contractual obligation then the contractor is responsible to
CVN74_CVN73_Design Information Memo_Attachment 10 contact their specific Contract Specialist, COR or ACOR immediately to resolve the issue. The only authority granted by the government to make changes or modifications to this contract is through the Contracting Officer.
File details come from the government source that posted it. Updated .