CVN_74_QASP_and_MATRIX_Attachment_2.docx

DOCX document 26 KB Posted

Attached to
CVN74 FY20 RCOH Shipchecks and Ship Installation Drawing Development
Solicitation number
N4215817RN002
Issued by

About this file

CVN74 QASP & MATRIX Attachment 2

View the file

Other files

File Type Posted
Price_Submission_Worksheet_Amendment_1_Attachment_18.xls XLS spreadsheet
N4215817RN002_Questions_with_Responses_Pt2.docx DOCX document
Price_Submission_Worksheet_Attachment_18.xls XLS spreadsheet
N4215817RN002_Questions_with_Responses.docx DOCX document
N4215817RN0020001.docx DOCX document
CVN74_Tech_Review_Transmittal_Attachment_13.xlsx XLSX spreadsheet
Attachment_15_WD_2015-4341_NC_Virginia.docx DOCX document
CVN74_Analysis_CLIN_Ceiling_Attachment_3.xlsx XLSX spreadsheet
CVN74_SID_MASTER_DRAWING_SCHEDULE_Attachment_6.xlsx XLSX spreadsheet
Past_Performance_Information_Form_Attachment_16.docx DOCX document
CVN74_Interferance_Log_Attachment_9.JPG JPG image
CVN_74_DD254_Attachment_1.pdf PDF
CVN74_TECH_ISSUES_Attachment_4.xls XLS spreadsheet
CVN74_Turnover_Memo_Attachment_12.pdf PDF
Addendum_DD254_Attachment_1a.docx DOCX document
N4215817RN002.docx DOCX document
Past_Performance_Report_Form_Attachment_17.docx DOCX document
CVN74_Shipcheck_Assistant_Attachment_8.JPG JPG image
CVN74_CVN_73_Design_Information_Memo_Attachment_10.pdf PDF
Attachment_14_WD_2015-5525_Kitsap_Bremerton.docx DOCX document
CVN74_DLAR_Attachment_11.pdf PDF
CVN74_In-Client_Roster_Attachment_5.xlsx XLSX spreadsheet
CVN74_Weekly_Hours_Expended_Attachment_7.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE PLAN FOR CVN 74 RCOH

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are use in the administration of the Performance Based Service Contract (PBSC) standards included in this contract and in subsequent task orders issued there under. The intent is to ensure the Contractor performs in accordance with performance metrics set forth in the contract documents the Government receives quality of services called for in the contract while ensuring the Government only pays for the acceptable level of services received.

2. AUTHORITY

Authority for issuance of the QASP is provided under Contract Section E- Inspection and Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in task orders to be accomplished by the Contracting Officer or his duly authorized representatives.

3. SCOPE

The QASP is put in place to provide Government surveillance and oversight of the Contractor’s quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract or task order. The QASP is not a part of the contract nor is it intended to duplicate the Contractor’s Management Plan.

4. GOVERNMENT RESOURCES

The following definitions for Government resources are applicable to this plan:

Contracting Officer- A person duly appointed with the authority to enter into, administer, or terminate contracts and make related determinations and findings on behalf of the Government.

Contracting Officer’s Representative (COR) - An individual designated in writing by the Contracting Officer to act as his authorized representative to assist in administering a contract. The source and authority for a COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.

5. RESPONSIBILITIES

The Government resources shall have responsibilities for the implementation of this QASP as follows:

Contracting Officer- The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the project and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

6. METHODS OF QA SURVEILLANCE

The below listed methods of surveillance shall be used in the administration of this QASP.

Customer Feedback- Customer feedback may be obtained from random customer complaints. Appropriate forms will be made available by the COR for the patrons. The COR shall have sole custody of the suggestion box. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the COR.

Inspections- Each phase of the services rendered under the contract is subject to Government inspection during the Contractor’s operations and after completion of a task. Inspections may be routine functions performed by the COR, Technical Lead or performed by other outside of the NNSY command. The Contractor shall not substitute Government inspection for effective quality control. Government inspections may be conducted in an unannounced manner by the COR or other individuals designated outside the NNSY organization. The COR shall maintain a Contract Discrepancy Report (CDR), a copy of which will be provided to the Contractor. Within three days, the Contractor shall reply in writing to CDR(s) by stating reason(s) for unsatisfactory performance(s) and shall identify the corrective action(s) that will be taken to prevent recurrence(s).

Performance Evaluation Meetings- The Contractor’s Project Manager will meet weekly with the COR . Such meetings will be conducted as least monthly thereafter. The purpose of these meetings will be to review the Contractor’s task order technical issues, funding, progress and performance and will include metrics of all deliverables provided during the proceeding week. A mutual effort will be made to resolve all problems identified.

7. INDENTIFIED QA SURVEILLANCE ITEMS

The following PBSC items are identified within the Performance Based Statement of Work (PWS) and are to be monitored under this QASP:

DATA DELIVERABLES:

· Drawing Design and Associated Lists

· SID’s

· Turnover Memo

· Shipcheck Assistant

· Technical Issues

· Design Information Memo

· DLAR

· In Client Roster

· Weekly hours expended

· Weekly Employee Status Report

· Task Order Status Report

· Conference Reports

· Job Summary

· Task Group Instruction

· Re-entry Control Forms

· Engineer Report

· Computer/Machine Products (Special)

CONTRACTOR PERFORMANCE REQUIREMENTS

· Meet scope and performance requirements

· Deliverables submitted timely

· Effectively control costs

· Maintain proper communications with Government

· Invoice in accordance with proper contract procedures

· Attendance and participation in required weekly COR meetings

· Adherence to Joint Travel Regulations

· Provision of skilled personnel as required in the PWS

· Control of employee’s Government badges when not actively employed under this contract

8. DOCUMENTATION

The COR will, in addition to providing documentation to the Contracting Officer, maintain a complete Quality Assurance file. All such records will be retained for the life of this contract. Information in the Quality Assurance file will be considered when completing the annual Contractors Performance Assessment Reporting System report.

The main outcomes anticipated for this contract are outlined in the QASP Matrix. The scale used to evaluate performance is identified below. This scale will also be used to evaluate the contractor’s performance in the CPARS system at the end of each contract period of performance (i.e., Base year, Option 1 ect).

· 91 – 100%= Exceptional

· 81 – 90%= Very Good

· 71 – 80%= Satisfactory

· 51 – 70%= Marginal

· 0 – 50%= Unsatisfactory

· 0%= Not Applicable

Primary Performance Objectives
Performance Standard
Performance Assessment Method
Contractor met the performance requirements of each individual deliverables.
0 to 100% CPARS scale
Gov't will assess this on an annual basis on the CPARS.
The Contractor was able to meet the scope requirements.
0 to 100% CPARS scale
Gov't will assess this based on the types of tasking on annual CPARS.
The Contractor maintained close liaison and good communications with the Government including adequate notice when guidance or technical problems/conflicts arose.
0 to 100% CPARS scale
Gov't will assess this on an annual basis on the CPARS.
DD250's were submitted as required in a timely matter.
0 to 100% CPARS scale
Gov't will track in database and assess periodically, with formal assessment at end of each Lot Year.
Invoices submitted did not list charges without including the applicable receipt.
0 to 100% CPARS scale
Gov't will track in database and assess periodically, with formal assessment at end of each Lot Year.
Monthly progress reports were submitted in a timely manner.
0 to 100% CPARS scale
Gov't will assess periodically, with formal assessment at end of each Lot Year.
Contractors attended weekly COR meetings knowledgeable about, and prepared to discuss each outstanding deliverable items.
0 to 100% CPARS scale
Gov't will assess periodically, with formal assessment at end of each Lot Year.
The Contractor was effective in controlling costs.
0 to 100% CPARS scale
Gov't will assess periodically, with formal assessment at end of each Lot Year.
The Contractor complied with the guidance and requirements.
0 to 100% CPARS scale
Gov't will assess this on an annual basis on the CPARS.
The Contractor was able to provide skilled personnel in each labor category when required.
0 to 100% CPARS scale
Gov't will assess this on an annual basis on the CPARS.
The Contractor controlled employee Shipyard badges when employee was not actively employed on this contract's work.
0 to 100% CPARS scale
The COR will conduct periodic floor checks.
Reports were submitted on time.
0 to 100% CPARS scale
Gov't Task Leader will check for conformity when submittals are checked.
The Contractor maintained close liaison and good communications between various technical disciplines within their organizations
0 to 100% CPARS scale
Gov't will assess this on an annual basis on the CPARS.
The Contractor provided a technically knowledgeable point of contact.
0 to 100% CPARS scale
Gov't Task Leader will evaluate.
Contractor conformed to Quality Assurance requirements
0 to 100% CPARS scale
Gov't Task Leader will check for conformity.
The Contractor submitted deliverables on time.
0 to 100% CPARS scale
Gov't will assess this on an annual basis on the CPARS.
Contractor's deliverables were "ready for issue" .
0 to 100% CPARS scale
Gov't will assess this on an annual basis on the CPARS.
Drawings conform to I.D.E.A. CAD Standards.
0 to 100% CPARS scale
Gov't Task Leader will check for conformity.
Drawings conform to Intelligent Ship Installation Drawing AutoCAD Module template 1.1 or greater requirements.
0 to 100% CPARS scale
Gov't Task Leader will check for conformity.
Drawings conform to Weight and Moment requirements.
0 to 100% CPARS scale
Gov't Task Leader will check for conformity.
Deliverable items were legible and reproducible.
0 to 100% CPARS scale
Gov't Task Leader will check for conformity.

File details come from the government source that posted it. Updated .