N3220520R4084-0006.docx

DOCX document 41 KB Posted

Attached to
USNS ZEUS MTA SHIP REPAIR
Solicitation number
N3220520R4084
Issued by

About this file

This solicitation package seeks proposals for midterm availability ship repair work on the USNS ZEUS to be performed from November 16, 2020 for ninety calendar days. Work includes various inspections, repairs, replacements and certifications across eight sections covering hull structure, propulsion machinery, electrical systems, communications and navigation aids, auxiliary systems, outfitting and habitability, sponsor-related items, and heating, ventilation and air conditioning. Proposals are due by June 12, 2020 with award to be made to a contractor capable of performing the full scope of work either organically or via subcontracting and possessing the required facilities, certifications, safety programs and organizational elements.

View the file

Other files

File Type Posted
J - 2 Category A Items - 20-R-4084 REV 9.xlsx XLSX spreadsheet
J - 1 Work Item Package - 20-R-4084 REV 9.docx DOCX document
Conform Amendment 9.docx DOCX document
J - 3 Category B Items - 20-R-4084 REV 9.xls XLS spreadsheet
Mod Amendment 9.docx DOCX document
J - 1 Work Item Package - 20-R-4084 REV.docx DOCX document
J - 2 Category A Items - 20-R-4084 REV.xlsx XLSX spreadsheet
N3220520R4084-008.docx DOCX document
J - 3 Category B Items - 20-R-4084 REV.xls XLS spreadsheet
Conform Copy N3220520R4084-008.docx DOCX document
Conform Copy N3220520R4084-0007.docx DOCX document
N3220520R4084-0007.docx DOCX document
Conform Copy N3320520R4084-0006.docx DOCX document
RFC QandA 10 Solicitation N32205-20-R-4084.docx DOCX document
Conform Copy N3220520R4084-0005.docx DOCX document
RFC QandA 9 Solicitation N32205-20-R-4084.docx DOCX document
N3220520R4084-0005.docx DOCX document
RFC QandA 8 Solicitation N32205-20-R-4084.doc DOC document
N3220520R4084-0004.docx DOCX document
N3220520R4084-0004 Conform Copy.docx DOCX document
RFC QandA 7 Solicitation N32205-20-R-4084.docx DOCX document
RFC QandA 6 Solicitation N32205-20-R-4084.docx DOCX document
N3220520R4084-0003.docx DOCX document
N3220520R4084-0003 Conform Copy.docx DOCX document
N3220520R4084-0002.docx DOCX document
N3220520R4084-0002 Conformed Copy.docx DOCX document
RFC QandA 5 Solicitation N32205-20-R-4084.docx DOCX document
RFC QandA 2 Solicitation N32205-20-R-4084.docx DOCX document
RFC QandA 3 Solicitation N32205-20-R-4084.docx DOCX document
N3220520R4084-0001.docx DOCX document
RFC QandA 1 Solicitation N32205-20-R-4084.docx DOCX document
Revised J - 2 Category A Items - 20-R-4084.xlsx XLSX spreadsheet
RFC QandA 4 Solicitation N32205-20-R-4084.docx DOCX document
N3220520R4084-0001 Conformed Copy.docx DOCX document
Revised J - 1 Work Item Package - 20-R-4084.docx DOCX document
J - 10 Interport Differential - 20-R-4084.doc DOC document
J - 2 Category A Items - 20-R-4084.xlsx XLSX spreadsheet
J - 1 Work Item Package - 20-R-4084.docx DOCX document
J - 13 Past Performance Questionnaire - 20-R-4084.docx DOCX document
J - 8 Request for Spec Clarification - 20-R-4084.doc DOC document
J - 7 MSC Ship Repair Facility Survey - 20-R-4084.docx DOCX document
USNS ZEUS FY20 MTA JA.doc DOC document
J - 12 Past Performance Data - 20-R-4084.doc DOC document
J - 11 Dry Dock Evaluation Form - 20-R-4084.docx DOCX document
J - 4 MSC Government Furnished Property.xlsx XLSX spreadsheet
CDRLForms 3.zip ZIP file
J - 3 Category B Items - 20-R-4084.xls XLS spreadsheet
J - 9 Disclosure of Lobbying Activities - 20-R-4084.doc DOC document
ZEUS MTA Solicitation 4084.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220520R4084

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION / CONTRACT FORM

The required response date/time has changed from 05-Jun-2020 02:00 PM to 12-Jun-2020 02:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C-1 GENERAL

1. The contractor shall prepare for and accomplish the VR, overhaul, or alterations of the USNS ZEUS (ARC 7) as specified herein and IAW the WI package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

(b) Ensuring the timely procurement of CFM/CFP and the timely reporting, receipt, storage, installation, and accountability of GFM/GFP IAW FAR Clause 52.245-1 and DFARs Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004.

(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the CDRL and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variances based on the TPSN submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.

(f) Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

(i) Providing for staging and storing of material (both Government-furnished and contractor-furnished) and LLTM for use in the availabilities from the date of award.

(j) Managing all subcontractors’ performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

(k) Employing good judgment and sound engineering practice and principles, particularly when WIs do not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

(a) The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

(b) The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/offship production and component/system testing and trials. The contractor shall provide industry certifications such as: MSRA, ABR, or ISO Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate its ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award:

a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value, and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating, and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control, and subcontractor control.

b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. The offeror shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package.

e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance, and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards.

h. Safety/Security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage, and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage, and disposal. Appropriate state/federal agency-issued hazardous waste generator number. Disposal records which indicate type of material, date, and place of disposal.

j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place, accessible to the CLASS size ship for birthing

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

k. Agreements. To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate its ability to obtain required resources.

(c) The government reserves the right to perform a site survey(s) for verification of policies, procedures, capabilities and facilities prior to award.

This award consummates the contract which consists of the following documents: (a) the Government’s solicitation and your final proposal revision submitted on 06/12/2020 2:00 PM Eastern inclusive of all discussion and clarifications responses and (b) this award/contract.

C – 2 List of Standard WIs included for this solicitation:

NOT SEPARATELY PRICED (NSP) REQUIREMENTS Category

001INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONSNSP
002TECHNICAL AND MANUFACTURER’S REPRESENTATIVESNSP
003APPROACH, BERTH, AND MOORING REQUIREMENTSNSP
004TESTING AND QUALITY ASSURANCENSP
005ELECTRICAL SAFETY PROCEDURE REQUIREMENTSNSP
006HEAVY WEATHER PLANNSP
007COLD WEATHER PLANNSP
024PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY (NSP)NSP

CATEGORY “A” WORK ITEMS

010FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT)A
011GENERAL SERVICES FOR THE SHIPA
012INFORMATION TECHNOLOGY SERVICESA
013PROJECT PLANNING AND PRODUCTION STATUS MONITORINGA
014WEIGHT AND MOMENT REPORTA
015INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTSA
016FIRE PROTECTION AND SHIP’S SAFETY PROGRAMA
017HANDLING SHIP’S STORESA
018DELIVERY AND REDELIVERY OF THE VESSELA
019SHIPBOARD ACCESS AND SECURITYA
020GAS FREE CERTIFICATESA
021CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACESA
022MACHINERY SPACE TURN-OVER, DOCK TRIALS AND SEA TRIALA
023HAZARDOUS WASTE DISPOSAL AT CONTRACTOR’S FACILITYA

CATEGORY “B” WORK ITEMS

025PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITYB
030CONTINUATION OF SERVICESB

SECTION 100 HULL STRUCTURE Category

CATEGORY “A” WORK ITEMS

0101TANK INSPECTIONS (ABS & USCG)A
0103NON-SKID PRESERVATIONA
0104SUPERSTRUCTURE PRESERVATIONA
0105ULTRASONIC GAUGINGB
0107STEEL REPLACEMENT AROUND PLENUM INTAKEA
0109HATCH REPLACEMENT MISC CABLE AND BOSN STOREROOM (4-16.5-3)A
0110HATCH REPLACEMENT 2ND DECK FWD BOSN STOREROOM (2-14-1)A
0111PANELING REPAIRSA
0112ELECTRICAL CABLEWAY BRACKETA
0114PORT AFT LIFEBOAT CATWALK MODIFICATIONSA
0116PAINT LIFEBOAT DAVITS AND PLATFORMA

SECTION 200 PROPULSION MACHINERY

CATEGORY “A” WORK ITEMS

0201SSDG 1 REPAIR AND MAINTENANCE SUPPORTA
0203SSDG 3 REPAIR AND MAINTENANCE SUPPORTA
0204SSDG 4 REPAIR AND MAINTENANCE SUPPORTA
0205SSDG 5 REPAIR AND MAINTENANCE SUPPORTA
0206ANNUAL MCCS AUTOMATION GROOMA
0208MDG RESILIENT MOUNT AND SNUBER REPLACEMENTA
0209GENERATOR CLEANING AND INSPECTIONA
0210BOW AND STERN THRUSTER MOTOR CLEANINGA
0211MOTOR BEARING FWD AND AFT INSPECTIONA
SECTION 300ELECTRICAL
CATEGORY “A” WORK ITEMSCategory
0301SWITCHBOARD CLEANINGA
0302MMR1_Regulated_Power_PanelA
0399MISC. MOTOR OVERHAULB

SECTION 400 COMMUNICATION AND NAVIGATIONAL AIDS Category

CATEGORY “A” WORK ITEMS

0401GMDSS SAFETY RADIO ANNUAL CERTIFICATIONA
0402RADAR AND ECDIS ANNUAL INSPECTIONA
0403GYRO COMPASS AND STEERING SERVICEA
0405SHIP’S DIAL TELEPHONE SYSTEM SERVICE AND GROOMA
0407SHIP’S WHISTLE REPAIRA

SECTION 500 AUXILIARY SYSTEMS Category

CATEGORY “A” WORK ITEMS

0501HALON AND CO2 EXTINGUISHERS SYSTEMS ANNUAL INSPECTA
0502PORTABLE EXTINGUISHER TEST AND INSPECTA
0503FIRE ALARM ANNUAL INSPECTIONA
0505 FIRE DAMPTER INSPECTIONA
0506FLEX HOSE REPLACEMENT – ALL 5 SSDGSA
0508ANNUAL OILY WATER SEPARATOR INSPECTION AND TESTINGA
0514ANCHOR WINDLASS BRAKE PADS REPLACEMENTS
0516VENT AND DRAIN PIPING REPAIRSA
0520MISC. PIPING REPLACEMENTB
0522STBD FWD CABLE DRUM PRESERVATIONA
0523PORT CABLE DRUM FWD-AFT, SHOE BRAKES REPLACEMENTSA
0524PORT CABLE FWD-AFT CALIPER BRAKE REPLACEMENTSA

SECTION 600 OUTFIT, FURNISHINGS AND HABITABILITY Category

CATEGORY “A” WORK ITEMS

0601ANNUAL ACCOMMODATION LADDER INSPECTION AND TESTA
0602ANNUAL SCBA COMPRESSOR RECERTIFICATIONA
0604ANNUAL FIRE HOSE HYDROSTATIC TESTA
0605CARGO ELEVATOR INSPECTION AND CERTIFICATIONA
0606ANNUAL LIFERAFT CERTIFICAITONA
0607ANNUAL RESCUE BOAT AND DAVIT INSPECTIONA
0608ANNUAL LIFEBOAT AND DAVIT INSPECTIONA
0609FORWARD CRANE ANNUAL INSPECTIONA
0610AFT CRANE ANNUAL CERTIFICATIONA
0613INSTALL PRC IN VARIOUS LOCATIONSA
0614REPLACE TERRAZZO DECKINGA
0615ELECTRIC MATTING IN AFT DO/HB RMA
0616TILE REPLACEMENTA
0655IMMERSION SUIT SERVICEA

SECTION 700 SPONSOR RLEATED Category

CATEGORY “A” WORK ITEMS

0701480V RECEPTACLE LINE CONDITIONERA
0702RELOCATION CHE INSTRUMENTATION CABLES AND CONTROLLERSA
0703PROVIDE CRANE, FORKLIFT, RIGGING AND JLG SERVICESA
0704CCTV MONITOR CHANGEOUTA
0706REPAIR FIBER AND ETHERNET CABLE RUNSA

SECTION 800 HEATING, VENTILATION AND CONDITIONING Category

CATEGORY “A” WORK ITEMS

0801REPLACE PREHEATERA
0802HVAC DUCT REPAIRS AND REBALANCINGA
0803VENTILATION DUCT CLEANING AND REBALANCINGA
0804FAN OVERHAUL SI-29-2 & S1-35-1A

(End of Summary of Changes) image1.wmf