RFC_020_Answer.docx
DOCX document 27 KB Posted
- Attached to
- USNS JOHN LENTHALL (T-AO 189) MTA
- Solicitation number
- N32205-18-R-4006
About this file
RFC 020
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-18-R-4006
USNS JOHN LENTHALL (TAO-189)
REQUEST FOR SPECIFICATION CLARIFICATION
RFC 020
NAME OF CONTRACTOR: ______________________
SPECIFICATION ITEM NO.: ____501 _________________
PARAGRAPH / SECTION NO:___5.1_________________
TITLE: ___No. 3 SSDG Resilient Engine Mount Replacement____________
QUESTION:
Paragraph 5.1 of WI 501 says this item is to be worked in conjunction with 501 No. 3 SSDG Overhaul, 502 No. 3 SSDG Turbocharger Overhaul and 504 SSDG Local Control Panel Replacement. Item 501 is SSDG Resilient Engine Mount Replacement, 502 is No. 3 Vulkan Coupling Replacement and 504 is Evaporator Replacement. Please clarify.
ANSWER:
See Amendment 0004 and ARMDEC for revised WI 501A.
ATTACHMENT J - 8
File details come from the government source that posted it.