Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | $0.00 | $0.00 | - 0 | $0.00 | $0 | ||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | $0.00 | $0.00 | - 0 | $0.00 | $0 | ||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | $0.00 | $0.00 | - 0 | $0.00 | $0 | ||||||
| 004 | TESTING AND QUALITY ASSURANCE | $0.00 | $0.00 | - 0 | $0.00 | $0 | ||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | $0.00 | $0.00 | - 0 | $0.00 | $0 | ||||||
| 006 | HEAVY WEATHER PLAN | $0.00 | $0.00 | - 0 | $0.00 | $0 | ||||||
| 007 | COLD WEATHER PLAN | $0.00 | $0.00 | - 0 | $0.00 | $0 | ||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NON-DESTRUCTIVE TESTING (NDT) KINGPOST AREAS (ABS) | |||||||||||
| 102 | DECK NON-SKID RENEWAL | |||||||||||
| 103A | CONTAMINATED DFM TANK RECOAT (3-37-1) | |||||||||||
| 104A | CONTAMINATED JP-5 TANK RECOAT (3-36-2) | |||||||||||
| 105 | STRUCTURAL STEEL REPAIRS | |||||||||||
| 106A | RAS AND FAS Kingpost Support Brackets (T-ALT 0819) | |||||||||||
| 107B | TANK DECK CABLEWAY SHIELDS & BRACKETS BLASTING & RECOATING | |||||||||||
| 108 | TANK DECK LIGHTING BRACKET REPLACEMENT | |||||||||||
| 109A | CARGO POTABLE WATER TANKS BLASTING AND RECOATING | |||||||||||
| 110A | PUMP ROOM BILGE & TANK TOP PRESERVATION | |||||||||||
| 111A | ULTRASONIC THICKNESS GAUGING | |||||||||||
| 112A | STEEL DECK OVER FREEZER BOX Renewal | |||||||||||
| 200 | MAIN PROPULSION | |||||||||||
| 201B | MAIN ENGINE 12K OVERHAUL | |||||||||||
| 202 | MAIN REDUCTION GEAR ANNIAL INSPECTION | |||||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | SWITCHBOARDS AND MOTOR CONTROLLERS CLEANING | |||||||||||
| 302 | CIRCUIT BREAKER INSPECTION AND REPAIR | |||||||||||
| 303 | RECONDITION AC MOTORS | |||||||||||
| 304 | WEATHER DECK KICK PIPES/ STUFFING TUBES/ COLLARS REPLACEMENT | |||||||||||
| 305 | CABLE BULKHEAD COLLAR PACKING MATERIAL REPLACEMENT | |||||||||||
| 400 | COMMUNIC ATION & NAV AIDS | |||||||||||
| 401 | GMDSS RECERTIFICATION ANNUAL | |||||||||||
| 402 | RADAR/ECDIS PREVENTATIVE MAINTENANCE | |||||||||||
| 403 | NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE | |||||||||||
| 404 | MAGNETIC COMPASS ANNUAL | |||||||||||
| 405 | SVDR RECERTIFICATION ANNUAL | |||||||||||
| 406A | 10315U REMOTE SWITCH CONTROL UNIT GROOM | |||||||||||
| 407 | REPLACE ORBIT TVDTS ANTENNA AND SYSTEM | |||||||||||
| 408A | ANTENNA PHOTOGRAPHS | |||||||||||
| 409 | XLI SYSTEM COAXIAL CABLES REMOVAL & REPLACEMENT | |||||||||||
| 500 | AUXILIARY MACHINERY | |||||||||||
| 501A | NO. 3 RESILIENT MOUNT REPLACEMENT | |||||||||||
| 502 | SSDG FLEXIBLE COUPLING ELEMENT REPLACEMENT | |||||||||||
| 503A | DFM CARGO PIPING REPLACEMENT | |||||||||||
| 504A | EVAPORATOR REPLACEMENT TRANS-ALTS | |||||||||||
| 505 | PRESSURE VESSEL INSPECTION AND HYDRO (ABS) | |||||||||||
| 506A | VESSEL RELIEF VALVE OVERHAUL | |||||||||||
| 507 | AUXILIARY BOILERS INSPECTION AND REPAIR | |||||||||||
| 508A | T-ALT 0914 Stack Monitor Replacement | |||||||||||
| 509A | ANNUAL OCM SERVICE, CALIBRATION, AND REPLACEMENT T-ALT 0766 | |||||||||||
| 510 | REFRIDGERATION & AIR CONDITIONING SYSTEMS REPAIR & GROOM | |||||||||||
| 511 | ENGINE ROOM OIL CONTENT MONITOR CALIBRATION | |||||||||||
| 512A | ARMORY AC REPLACEMENT | |||||||||||
| 513 | ERC AC REPLACEMENT | |||||||||||
| 514A | Overhaul No.1, No.5, & No.6 Constant Tension Winches | |||||||||||
| 515 | INCINERATOR INSPECTION AND REPAIR | |||||||||||
| 516A | BOILER UPTAKE INSPECTION PLATES & CLEANING | |||||||||||
| 517 | GAUGE, METER, TEST & MEASURING EQUIPMENT CALIBRATION | |||||||||||
| 518 | VACUUM SWAGE SYSTEM PIPING ACID CLEANING | |||||||||||
| 519A | REDUCTION GEAR LUBE OIL COOLER CLEANING | |||||||||||
| 520A | MAIN ENGINE LUBE OIL COOLER CLEANING | |||||||||||
| 600 | HABITABILITY | |||||||||||
| 601 | ANNUAL INSPECTION & REPAIR OF FIRE FIGHTING EQUIPMENT | |||||||||||
| 602 | ANNUAL INSPECTION OF FIRE AND AFFF HOSES | |||||||||||
| 603 | ANNUAL LIFE RAFT RECERTIFICATION | |||||||||||
| 604 | INSPECTION & REPAIR OF FASSMER LIFEBOATS | |||||||||||
| 605 | INSPECTION & REPAIR OF RESCUE BOATS | |||||||||||
| 606 | PORT RHIB DAVIT ANNIAL SERVICING | |||||||||||
| 607 | INSPECTION OF LIFE BOAT DAVIT WINCHES (ABS) | |||||||||||
| 608 | MRD 5850 DAVIT INSPECTION/ REPAIR AND PRESERVATION (ABS) | |||||||||||
| 609 | ANNUAL SCBA COMPRESSOR/REFILL STATION SERVICING | |||||||||||
| 610 | ANNUAL INSPECTION OF SCBA EQUIPMENT | |||||||||||
| 611 | ANNUAL PERSONNEL ELEVATOR RECERTIFICATION | |||||||||||
| 612 | ANNUAL SERVICING OF IMMERSION SUITS | |||||||||||
| 613 | FREEZER BOX INSULATION REPLACEMENT | |||||||||||
| 614 | DEEP FAT FRYER REPLACEMENT | |||||||||||
| 615 | ANNUAL INSPECTION OF ACCOMMODATION LADDERS (ABS) | |||||||||||
| 616A | T-AO AFFF CONVERSION, NATIONAL TO ANSULITE 3X3 (USCG, ABS) | |||||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | VENTILITAION SYSTEMS CLEANING | |||||||||||
| 1000 | UNREP EQUIPMENT | |||||||||||
| 1001 | SLIDING BLOCK BUMPER REPLACEMENT | |||||||||||
| 1002 | WINCH ELECTRIC MOTOR CLASS “B” OVERHAUL | |||||||||||
| 1003 | SLIDING BLOCK CHAIN REPLACEMENT | |||||||||||
| 1004 | HIGH PRESSURE AIR RELIEF VALVE CALIBRATION | |||||||||||
| 1005 | SADDLE WINCH SHAFT REPLACEMENT/REPAIR | |||||||||||
| 1006 | SADDLE WINCH REFURBISHMENT | |||||||||||
| 1007 | ANTI-SLACK DEVICE (ASD) FRAME AND FOUNDATION REFURBISHMENT | |||||||||||
| 1008 | WINCH CONTROL BOOTH WINDOW AND STEEL REPLACEMENT | |||||||||||
| TOTAL |
&"Times New Roman,Regular"USNS JOHN LENTHALL
| CONTRACTOR PRICE BREAKDOWN | |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-18-R-4006 |
ATTACHMENT J-2