Amendment_0004.docx
DOCX document 38 KB Posted
- Attached to
- USNS JOHN LENTHALL (T-AO 189) MTA
- Solicitation number
- N32205-18-R-4006
About this file
Amendment 0004
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220518R4006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard Work Items included for this solicitation:
| ITEM | TITLE | CATEGORY |
| 000 | GENERAL REQUIREMENTS |
| 001 | INTENT, SCOPE, GENERAL CONDITIONS AND DEFINITIONS | NSP | |||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | |||||||
| 003 | APPROACH, BERTH AND MOORING REQUIREMENTS | NSP | |||||||
| 004 | TESTING AND QUALITY ASSURANCE | NSP | |||||||
| 005 | ELECTRICAL SAFETY PROCEDURE REQUIREMENTS | NSP | |||||||
| 006 | HEAVY WEATHER PLAN | NSP | |||||||
| 007 | COLD WEATHER PLAN | NSP | |||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM (OMT) | A | |||||||
| 011 | FURNISH GENERAL SERVIES (TAO) | A | |||||||
| 012 | TELEPHONE SERVICES | A | |||||||
| 013 | PROJECT PLANNING AND PRODUCTION STATUS MONITORING | ||||||||
| REPORTS | A | ||||||||
| 014 | PREPERATION OF WEIGHT AND MOMENT REPORT | A | |||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT REQUIREMENTS | A | |||||||
| 016 | FIRE PROTECTION AND SHIP’S STORES | A | |||||||
| 017 | HANDLING SHIP’S STORES | A | |||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | A | |||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | A | |||||||
| 020 | GAS FREE CERTIFICATES | A | |||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | A | |||||||
| 022 | DOCK TRIALS AND SEA TRIAL | A | |||||||
| 023 | HAZARDOUS WASTE DISPOSAL AT A CONTRACTOR’S FACILITY | A | |||||||
| 024 | PHYSICAL SECURITY AT CONTRACTOR’S FACILITY | NSP | |||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR’S FACILITY | B | |||||||
| 030 | CONTINUATION OF SERVICES | B |
100 HULL STRUCTURE
| 101 | NON-DESTRUCTIVE TESTING (NDT) KINGPOST AREAS (ABS) | A | |||||
| 102 | DECK NON-SKID RENEWAL | A | |||||
| 103A | DFM CONTAMINATED TANK BLASTING AND RECOATING | A | |||||
| 104A | JP-5 CONTAMINATED TANK BLASTING AND RECOATING | A | |||||
| 105A | STRUCTURAL STEEL REPAIRS | A | |||||
| 106A | STATION NO. 4 & 6 KINGPOST FRACTURE T-ALT | A | |||||
| 107B | TANK DECK CABLEWAY SHIELDS AND BRACKETS BLASTING AND | ||||||
| RECOATING | A | ||||||
| 108 | TANK DECK LIGHTING BRACKET REPLACEMENT | A | |||||
| 109A | CARGO POTABLE TANKS PAINT AND COATING | A | |||||
| 110A | PUMP ROOM BILGE PRESERVATION | A | |||||
| 111A | ULTRASONIC THICKNESS GAUGING | A | |||||
| 112A | STEEL DECK OVER FREEZER BOX REPLACEMENT | A | |||||
| 113A | EVAPORATOR STEEL DECK REPLACEMENT | B |
200 MACHINERY, PROPULSION
| 201B | MAIN ENGINE 12K OVERHAUL | A | |
| 202 | MAIN REDUCTION GEAR ANNUAL INSPECTION | A |
300 ELECTRICAL
| 301 | SWITCHBOARDS AND MOTOR CONTROLLERS CLEANING | A | |||
| 302 | CIRCUIT BREAKER INSPECTION AND REPAIR | A | |||
| 303 | RECONDITION AC MOTORS | A | |||
| 304 | WEATHER DECK KICK PIPE REPAIRS | A | |||
| 305 | CABLE BULKHEAD COLLAR MAGNA ROCK REPLACEMENT | A |
400 COMMUNICATION & NAVIGATION EQUIPMENT
| 401 | GMDSS RECERTIFICATION ANNUAL | A | |||
| 402 | RADAR/ECDIS PREVENTATIVE MAINTENANCE | A | |||
| 403 | NAVIGAT X GYRO SYSTEM PREVENTATIVE MAINTENANCE | A | |||
| 404 | MAGNETIC COMPASS ANNUAL | A | |||
| 405 | SVDR RECERTIFICATION ANNUAL | A | |||
| 406A | 10315U REMOTE SWITCH CONTROL UNIT GROOM | A | |||
| 407 | REPLACE ORBIT TVDTS ANTENNA AND SYSTEM | A | |||
| 408A | ANTENNA PHOTOGRAPHS | A | |||
| 409 | XLI SYSTEM COAXIAL CABLES REMOVAL & REPLACEMENT | A |
500 MACHINERY, AUXILIARY
| 501A | SSDG NO. 3 RESILIENT MOUNT REPLACEMENT | A | ||||||||
| 502 | NO. 3 VULKAN COUPLING REPLACEMENT | A | ||||||||
| 503A | DFM CARGO PIPING REPLACEMENT | A | ||||||||
| 504A | EVAPORATOR REPLACEMENT TRANS-ALTS | A | ||||||||
| 505 | PRESSURE VESSEL INSPECTION AND HYDRO (ABS) | A | ||||||||
| 506A | VESSEL RELIEF VALVE OVERHAUL | A | ||||||||
| 507 | CLAYTON BOILER PM | A | ||||||||
| 508A | SMOKE INDICIATING SYSTEM T-ALT | 914 | A | |||||||
| 509 | VAF CARGO OIL CONTENT MONITOR INSTALLATION I T-ALT | A | ||||||||
| 510 | REFRIDGERATION & AIR CONDITIONING SYSTEMS REPAIR & | |||||||||
| GROOM | A | |||||||||
| 511 | ENGINE ROOM OIL CONTENT MONITOR CALIBRATION | A | ||||||||
| 512A | ARMORY AC REPLACEMENT | A | ||||||||
| 513 | ERC AC REPLACEMENT | A | ||||||||
| 514A | CT WINCH 1, 5 & 6 REPAIR | A | ||||||||
| 515 | INCINERATOR INSPECTION AND MAINTENANCE | A | ||||||||
| 516A | BOILER UPTAKE CLEANING | A | ||||||||
| 517A | GAUGE, METER, TEST & MEASURING EQUIPMENT CALIBRATION | A | ||||||||
| 518 | SEWAGE PIPING ACID FLUSH | A | ||||||||
| 519A | REDUCTION GEAR LUBE OIL COOLER CLEANING | A | ||||||||
| 520A | MAIN ENGINE LUBE OIL COOLER CLEANING | A |
600 OUTFITTING, FURNISHING & HABITABILITY
| 601 | ANNUAL INSPECTION & REPAIR OF FIRE FIGHTING EQUIPMENT | A | ||||
| 602 | ANNUAL INSPECTION OF FIRE AND AFFF HOSES | A | ||||
| 603 | ANNUAL LIFERAFT RECERTIFICATION | A | ||||
| 604 | INSPECTION & REPAIR OF FASSMER LIFEBOATS | A | ||||
| 605 | INSPECTION & REPAIR OF RESCUE BOATS | A | ||||
| 606 | PORT RHIB DAVIT ANNUAL SERVICING | A | ||||
| 607 | INSPECTION OF LIFEBOAT DAVIT WINCHES (ABS) | A | ||||
| 608 | MRD 5850 DAVIT INSPECTION/REPAIR CERTIFICATION (ABS) | A | ||||
| 609 | ANNUAL SCBA COMPRESSOR/REFILL STATION SERVICING | A | ||||
| 610 | ANNUAL INSPECTION OF SCBA EQUIPMENT | A | ||||
| 611 | ANNUAL PERSONNEL ELEVATOR RECERTIFICATION | A | ||||
| 612 | ANNUAL SERVICING OF IMMERSION SUITS | A | ||||
| 613 | FREEZER BOX INSULATION REPLACEMENT | A | ||||
| 614 | DEEP FAT FRYER REPLACEMENT | A | ||||
| 615 | ANNUAL INSPECTION OF ACCOMMODATION LADDERS (ABS) | A | ||||
| 616A | T-AO AFFF CONVERSION, NATIONAL TO ANSULITE 3X3 | A |
800 HEATING, VENTILATION AND AIR CONDITIONING
801 VENTILATION SYSTEMS DAMPERS A
1000 UNREP EQUIPMENT
| 1001 | SLIDING BLOCK BUMPER REPLACEMENT | A | |||
| 1002 | WINCH ELECTRIC MOTOR CLASS “B” OVERHAUL | A | |||
| 1003 | SLIDING BLOCK CHAIN REPLACEMENT | A | |||
| 1004 | HIGH PRESSURE AIR RELIEF VALVE CALIBRATION | A | |||
| 1005 | SADDLE WINCH SHAFT REPLACEMENT/REPAIR | A | |||
| 1006A | ANTI-SLACK DEVICE (ASD) FRAME AND FOUNDATION | ||||
| REFURBISHMENT | A | ||||
| 1007 | REFURBISH ANTI-SLACK DEVICE (ASD) FRAME AND FOUNDATION | A | |||
| 1008A | WINCH CONTROL BOOTH WINDOW AND STEEL REPLACEMENT | A |
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it.