RFC_010_Answer.docx
DOCX document 27 KB Posted
- Attached to
- USNS JOHN LENTHALL (T-AO 189) MTA
- Solicitation number
- N32205-18-R-4006
About this file
RFC 010
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N32205-18-R-4006
USNS JOHN LENTHALL (TAO-189)
REQUEST FOR SPECIFICATION CLARIFICATION
RFC 010
NAME OF CONTRACTOR: ______________________
SPECIFICATION ITEM NO.: _103____________________
PARAGRAPH / SECTION NO:____________________
TITLE: _Contaminated DFM Tank Blasting & Recoating__________________
QUESTION:
Item 103 – Paragraph 4.2 lists the product and directs for two (2) full coats and one (1) stripe coat (Buff, Off White and Off White) to be applied but 7.6.5 says to apply two (2) full coats and two (2) stripe coats (Buff, Off White, Buff and Off White); which is correct?
Item 103 – Paragraph 7.3 directs the contractor to “hand scrape tank to remove large blisters”; can some idea of the amount of effected area be provided i.e. 10% of the tank interior, 25%, more, less?
ANSWER:
See Amendment 0004 and ARMDEC for revised work item 103A. The tank is to be blasted 100% to Sp-11.