Amendment_0005.pdf

PDF 122 KB Posted

Attached to
Worldwide Tankers Long-Term Time Charter
Solicitation number
N32205-18-R-3508
Issued by

About this file

Amendment 0005 of RFP N32205-18-R-3508

View the file

Other files

File Type Posted
18R3508_Atttach_B_Basic_Pricing_Data_amended3.xlsx XLSX spreadsheet
18R3508_RFP_TankTime_PROFORMA_Amend2.docx DOCX document
3508_RFP_Q_AND_A__2.docx DOCX document
N32205-18-R-3508_Amend0004.docx DOCX document
Amendment_0003.pdf PDF
18R3508_Atttach_B_Basic_Pricing_Data_amended2.xlsx XLSX spreadsheet
3508_Amend0002.docx DOCX document
18R3508_Attach_D_DD254_Updated.pdf PDF
18R3508_Attach_A_GFP_List.xlsx XLSX spreadsheet
18R3508_Attach_F_TechEval_FarEast_amended2.xlsx XLSX spreadsheet
18R3508_Attach_E_PWS_amended_rev2.pdf PDF
18R3508_RFP_TankTime_PROFORMA_Amend1.docx DOCX document
18R3508_Attach_F_TechEval_ArabianGulf_amended2.xlsx XLSX spreadsheet
18R3508_Atttach_B_Basic_Pricing_Data_amended.xlsx XLSX spreadsheet
18R3508_Attach_O_PAST_PERFORMANCE.docx DOCX document
Amendment_0001.pdf PDF
MSDS_DFM_F-76.pdf PDF
MSDS_Jet_JP-5.pdf PDF
3508_RFP_Q_AND_A_revised.docx DOCX document
MSDS_Jet_A-1.PDF PDF
MSDS_JET_JP-8.pdf PDF
18R3508_Attach_E_PWS.pdf PDF
18R3508_Attach_M_CONSOL_Drawings.pdf PDF
18R3508_SF1449.docx DOCX document
18R3508_Attach_C_Crew_Complement.docx DOCX document
18R3508_Attach_F_TechEval_ArabianGulf.xlsx XLSX spreadsheet
18R3508_Attach_L_Decon_Station_DWG.pdf PDF
18R3508_Attach_H_Wage_Determination__2010-0147,_7.pdf PDF
18R3508_Atttach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3508_Attach_I_SF_LLL.pdf PDF
18R3508_Attach_G_ATFP_CBRD_and_Training_Requirements.pdf PDF
18R3508_Attach_K_Specs_for_CBR-D_Decon_Station.docx DOCX document
18R3508_Attach_F_TechEval_FarEast.XLS.xlsx XLSX spreadsheet
18R3508_Attach_H_Wage_Determination_201408019.txt TXT text file
18R3508_RFP_TankTime_PROFORMA.docx DOCX document
18R3508_Attach_N_Request_for_Clarification_Question.docx DOCX document
18R3508_Attach_H_Wage_Determination_2014080010.txt TXT text file
18R3508_Attach_J_MECSP_Worksheet.doc DOC document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to request for f inal proposal revisions (FPRs), and to incorporate the follow ing changes: (Please see extended description)

1. A revised Attachment B entitled "18R3508 Attach_B_Basic Pricing Data_amended3" is incorporated by w ay of this Amendment. This attachment w as revised to update the formula for FAR 52.217-8 OPTION "Daily Charter Hire Rate" column in the Total Evaluated Price tab

2. Charter Box 5, Laydays changed from "01 June 2018 to 31 August 2018" to "15 August 2018 to 31 October 2018"

3. Charter Box 17 changed from "Reserved" to "Other Costs"

4. Charter Box 92a is revised to change "In-port idle period fuel consumption" into "In-port loading period fuel consumption"

All other terms and conditions remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220518R3508

X 9B. DATED (SEE ITEM 11)

09-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Jul-2018

CODE

MILITARY SEALIFT COMMAND NORFOLK

471 EAST C STREET BLDG T-26

NORFOLK VA 23511

N32205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3220518R3508

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

The purpose of this amendment is to request for final proposal revisions (FPRs).

Discussions shall remain open until FPRs are due. FPRs are due on 25 July 2018 at 1400

Eastern Time.

Final Proposal Revisions shall be in writing. E-mail Final Proposal Revisions to:

manoushka.thompson@navy.mil

The Government intends to make award without obtaining further revisions. Final

Proposal Revisions should acknowledge all amendments to the RFP.

This amendment also includes the following:

1. A revised Attachment B entitled “18R3508 Attach_B_Basic Pricing Data_amended3” is incorporated by way of this Amendment. This attachment was revised to update the formula for

FAR 52.217-8 OPTION "Daily Charter Hire Rate" column in the Total Evaluated Price tab.

2. Charter Box 5, Laydays changed from "01 June 2018 to 31 August 2018" to "15 August 2018 to 31 October 2018"

3. Charter Box 17 changed from "Reserved" to "Other Costs"

Delivery and redelivery bonuses and other costs should be in Box 17.

4. Charter Box 92a is revised to change “In-port idle period fuel consumption” into “In-port loading period fuel consumption”

(End of Summary of Changes)

File details come from the government source that posted it.