18R3508_Attach_J_MECSP_Worksheet.doc

DOC document 28 KB Posted

Attached to
Worldwide Tankers Long-Term Time Charter
Solicitation number
N32205-18-R-3508
Issued by

About this file

ATTACH J

View the file

Other files

File Type Posted
18R3508_Atttach_B_Basic_Pricing_Data_amended3.xlsx XLSX spreadsheet
18R3508_RFP_TankTime_PROFORMA_Amend2.docx DOCX document
Amendment_0005.pdf PDF
3508_RFP_Q_AND_A__2.docx DOCX document
N32205-18-R-3508_Amend0004.docx DOCX document
Amendment_0003.pdf PDF
18R3508_Atttach_B_Basic_Pricing_Data_amended2.xlsx XLSX spreadsheet
3508_Amend0002.docx DOCX document
18R3508_Attach_D_DD254_Updated.pdf PDF
18R3508_Attach_A_GFP_List.xlsx XLSX spreadsheet
18R3508_Attach_F_TechEval_FarEast_amended2.xlsx XLSX spreadsheet
18R3508_Attach_E_PWS_amended_rev2.pdf PDF
18R3508_RFP_TankTime_PROFORMA_Amend1.docx DOCX document
18R3508_Attach_F_TechEval_ArabianGulf_amended2.xlsx XLSX spreadsheet
18R3508_Atttach_B_Basic_Pricing_Data_amended.xlsx XLSX spreadsheet
18R3508_Attach_O_PAST_PERFORMANCE.docx DOCX document
Amendment_0001.pdf PDF
MSDS_DFM_F-76.pdf PDF
MSDS_Jet_JP-5.pdf PDF
3508_RFP_Q_AND_A_revised.docx DOCX document
MSDS_Jet_A-1.PDF PDF
MSDS_JET_JP-8.pdf PDF
18R3508_Attach_E_PWS.pdf PDF
18R3508_Attach_M_CONSOL_Drawings.pdf PDF
18R3508_SF1449.docx DOCX document
18R3508_Attach_C_Crew_Complement.docx DOCX document
18R3508_Attach_F_TechEval_ArabianGulf.xlsx XLSX spreadsheet
18R3508_Attach_L_Decon_Station_DWG.pdf PDF
18R3508_Attach_H_Wage_Determination__2010-0147,_7.pdf PDF
18R3508_Atttach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3508_Attach_I_SF_LLL.pdf PDF
18R3508_Attach_G_ATFP_CBRD_and_Training_Requirements.pdf PDF
18R3508_Attach_K_Specs_for_CBR-D_Decon_Station.docx DOCX document
18R3508_Attach_F_TechEval_FarEast.XLS.xlsx XLSX spreadsheet
18R3508_Attach_H_Wage_Determination_201408019.txt TXT text file
18R3508_RFP_TankTime_PROFORMA.docx DOCX document
18R3508_Attach_N_Request_for_Clarification_Question.docx DOCX document
18R3508_Attach_H_Wage_Determination_2014080010.txt TXT text file
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32205-18-R-3508 ATTACHMENT J

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN WORKSHEET

In accordance with DFARS 252.237-7024, NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES, and Part X of the RFP, offerors are required to submit a Mission Essential Contractor Services Plan (MECSP). Part X section “l. BUSINESS PROPOSAL” of the RFP also requires that offerors on the subject procurement complete and submit this MECSP Worksheet.

For each of the below required elements of a MECSP, set forth by DFARS 252.237-7023, offerors must respond with a narrative description of how the proposed MECSP provides the required information. References to the section and page number of the MECSP in which the requirement is addressed must also be provided. If the required information is not included in the proposed MECSP, the response provided in the below worksheet will be considered an addendum to the proposed MECSP. Please attach additional sheets, if more space is required than provided below.

1. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed (DFARS 252.237-7024(b)(1)).

2. Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (DFARS 252.237-7024(b)(2)(i)).

3. Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (DFARS 252.237-7024(b)(2)(ii)).

4. Address the components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (DFARS 252.237-7024(b)(2)(iii)).

5. Address any established alert and notification procedures for mobilizing identified ``essential contractor service'' personnel (DFARS 252.237-7024(b)(2)(iv)).

6. Address the approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (DFARS 252.237-7024(b)(2)(v)).

MECSP Worksheet

File details come from the government source that posted it.