Amendment_0001.pdf

PDF 126 KB Posted

Attached to
Worldwide Tankers Long-Term Time Charter
Solicitation number
N32205-18-R-3508
Issued by

About this file

18R3508 RFP Amendment 0001

View the file

Other files

File Type Posted
18R3508_Atttach_B_Basic_Pricing_Data_amended3.xlsx XLSX spreadsheet
18R3508_RFP_TankTime_PROFORMA_Amend2.docx DOCX document
Amendment_0005.pdf PDF
3508_RFP_Q_AND_A__2.docx DOCX document
N32205-18-R-3508_Amend0004.docx DOCX document
Amendment_0003.pdf PDF
18R3508_Atttach_B_Basic_Pricing_Data_amended2.xlsx XLSX spreadsheet
3508_Amend0002.docx DOCX document
18R3508_Attach_D_DD254_Updated.pdf PDF
18R3508_Attach_A_GFP_List.xlsx XLSX spreadsheet
18R3508_Attach_F_TechEval_FarEast_amended2.xlsx XLSX spreadsheet
18R3508_Attach_E_PWS_amended_rev2.pdf PDF
18R3508_RFP_TankTime_PROFORMA_Amend1.docx DOCX document
18R3508_Attach_F_TechEval_ArabianGulf_amended2.xlsx XLSX spreadsheet
18R3508_Atttach_B_Basic_Pricing_Data_amended.xlsx XLSX spreadsheet
18R3508_Attach_O_PAST_PERFORMANCE.docx DOCX document
MSDS_DFM_F-76.pdf PDF
MSDS_Jet_JP-5.pdf PDF
3508_RFP_Q_AND_A_revised.docx DOCX document
MSDS_Jet_A-1.PDF PDF
MSDS_JET_JP-8.pdf PDF
18R3508_Attach_E_PWS.pdf PDF
18R3508_Attach_M_CONSOL_Drawings.pdf PDF
18R3508_SF1449.docx DOCX document
18R3508_Attach_C_Crew_Complement.docx DOCX document
18R3508_Attach_F_TechEval_ArabianGulf.xlsx XLSX spreadsheet
18R3508_Attach_L_Decon_Station_DWG.pdf PDF
18R3508_Attach_H_Wage_Determination__2010-0147,_7.pdf PDF
18R3508_Atttach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3508_Attach_I_SF_LLL.pdf PDF
18R3508_Attach_G_ATFP_CBRD_and_Training_Requirements.pdf PDF
18R3508_Attach_K_Specs_for_CBR-D_Decon_Station.docx DOCX document
18R3508_Attach_F_TechEval_FarEast.XLS.xlsx XLSX spreadsheet
18R3508_Attach_H_Wage_Determination_201408019.txt TXT text file
18R3508_RFP_TankTime_PROFORMA.docx DOCX document
18R3508_Attach_N_Request_for_Clarification_Question.docx DOCX document
18R3508_Attach_H_Wage_Determination_2014080010.txt TXT text file
18R3508_Attach_J_MECSP_Worksheet.doc DOC document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See extended description.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220518R3508

X 9B. DATED (SEE ITEM 11)

09-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-May-2018

CODE

MILITARY SEALIFT COMMAND NORFOLK

471 EAST C STREET BLDG T-26

NORFOLK VA 23511

N32205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3220518R3508

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

The purpose of this amendment is to make the following changes to the subject solicitation:

1) The closing date of the RFP is hereby amended. Due dates for proposals have been extended to

16 May 2018 at 2:00 pm Eastern Standard Time (EST) for the Far East Tanker (Lot 1), and 18

June 2018 at 2:00 pm EST for the Arabian Gulf Tanker (Lot 2)

2) Charter Box 6 is revised to incorporate and amend Part V(a) SECURITY CLEARANCE

3) Charter Box 6 is revised to incorporate and amend Part V(l) CONTRACTOR SECURITY (CS)

4) Charter Box 97 is revised to delete reference to “Part XIII(b): DFARS 252.209-7991”

5) Charter Box 97 is revised to add Attachment O “Past Performance Data Sheet”

6) Charter Box 97 is revised to amend Past Performance language under PART X.

INSTRUCTIONS TO OFFERORS and PART XI. EVALUATION--COMMERCIAL ITEMS

7) Charter Box 97 is revised to incorporate cancellation submission language

8) Attachment A “GFP List” and Attachment D “DD Form 254” are hereby incorporated

9) Attachment B “Basic Pricing Data” is revised to include the FAR 52.217-8 option pricing in the

Total Evaluated tab and updated fuel prices

10) The Performance Work Statement (PWS) and Attachment F “Technical Evaluation Worksheet” for the both tankers are revised to change the maximum loading arm height in item f)

11) Attachment F “Technical Evaluation Worksheet” for both tankers are revised to reflect the PWS

12) PWS is revised to change required dates for CBR-D countermeasure Water Wash-down System installation

(End of Summary of Changes)

File details come from the government source that posted it.