18R3508_Atttach_B_Basic_Pricing_Data_amended2.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Worldwide Tankers Long-Term Time Charter
Solicitation number
N32205-18-R-3508
Issued by

About this file

Attach B - Basic Price Data Rev2

View the file

Other files

File Type Posted
18R3508_Atttach_B_Basic_Pricing_Data_amended3.xlsx XLSX spreadsheet
18R3508_RFP_TankTime_PROFORMA_Amend2.docx DOCX document
Amendment_0005.pdf PDF
3508_RFP_Q_AND_A__2.docx DOCX document
N32205-18-R-3508_Amend0004.docx DOCX document
Amendment_0003.pdf PDF
3508_Amend0002.docx DOCX document
18R3508_Attach_D_DD254_Updated.pdf PDF
18R3508_Attach_A_GFP_List.xlsx XLSX spreadsheet
18R3508_Attach_F_TechEval_FarEast_amended2.xlsx XLSX spreadsheet
18R3508_Attach_E_PWS_amended_rev2.pdf PDF
18R3508_RFP_TankTime_PROFORMA_Amend1.docx DOCX document
18R3508_Attach_F_TechEval_ArabianGulf_amended2.xlsx XLSX spreadsheet
18R3508_Atttach_B_Basic_Pricing_Data_amended.xlsx XLSX spreadsheet
18R3508_Attach_O_PAST_PERFORMANCE.docx DOCX document
Amendment_0001.pdf PDF
MSDS_DFM_F-76.pdf PDF
MSDS_Jet_JP-5.pdf PDF
3508_RFP_Q_AND_A_revised.docx DOCX document
MSDS_Jet_A-1.PDF PDF
MSDS_JET_JP-8.pdf PDF
18R3508_Attach_E_PWS.pdf PDF
18R3508_Attach_M_CONSOL_Drawings.pdf PDF
18R3508_SF1449.docx DOCX document
18R3508_Attach_C_Crew_Complement.docx DOCX document
18R3508_Attach_F_TechEval_ArabianGulf.xlsx XLSX spreadsheet
18R3508_Attach_L_Decon_Station_DWG.pdf PDF
18R3508_Attach_H_Wage_Determination__2010-0147,_7.pdf PDF
18R3508_Atttach_B_Basic_Pricing_Data.xlsx XLSX spreadsheet
18R3508_Attach_I_SF_LLL.pdf PDF
18R3508_Attach_G_ATFP_CBRD_and_Training_Requirements.pdf PDF
18R3508_Attach_K_Specs_for_CBR-D_Decon_Station.docx DOCX document
18R3508_Attach_F_TechEval_FarEast.XLS.xlsx XLSX spreadsheet
18R3508_Attach_H_Wage_Determination_201408019.txt TXT text file
18R3508_RFP_TankTime_PROFORMA.docx DOCX document
18R3508_Attach_N_Request_for_Clarification_Question.docx DOCX document
18R3508_Attach_H_Wage_Determination_2014080010.txt TXT text file
18R3508_Attach_J_MECSP_Worksheet.doc DOC document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Pricing Data

Attachment B REV2Vessel:
Basic Pricing DataRFP: N32205-18-R-3508
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Base Period
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 1

Attachment B REV2Vessel:
Basic Pricing DataRFP: N32205-18-R-3508
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 366-day year
Option Period One
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 366 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 2

Attachment B REV2Vessel:
Basic Pricing DataRFP: N32205-18-R-3508
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Two
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 3

Attachment B REV2Vessel:
Basic Pricing DataRFP: N32205-18-R-3508
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 365-day year
Option Period Three
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 365 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Option 4

Attachment B REV2Vessel:
Basic Pricing DataRFP: N32205-18-R-3508
Unless otherwise specified by the offeror, the price and profit identified below will be assumed
(a) allocable to the services of the Vessels under this Charter
(b) in US dollars
(c) based upon a 334-day year
Option Period Four
PRICE PER DAY
1Crew wages, etc., as itemized in Attachment C
2Crew Training, not separately itemized in Attachment C
3Victualling, stores, and water
4Crew transportation/repatriation
5Other crew costs (itemize at lines 5-7)
6
7
8Total crew-related expenses (lines 1-7 above)$ - 0
9Maintenance and repair
10Lubricants
11Survey and classification expenses
12Equipment and materials
13Capitalized costs (Vessel)
14Depreciation (Vessel)
15Other Vessel costs (itemize at lines 15-17)
16
17
18Total Vessel costs (lines 9-17 above)$ - 0
19Protection and indemnity premia
20Protection and indemnity deductibles paid
21Hull and machinery premia
22Hull and machinery deductibles paid
23Other insurance costs (itemize at lines 23-25)
24
25
26Total insurance costs (lines 19-25 above)$ - 0
27Other (itemize at lines 27-30)
28
29
30
31General and administrative expenses
32Profit

33 Total daily costs from above multiplied by 334 $ - 0

34 Days assumed off-hire per year

35 Line 33 divided by the number of days assumed on-hire per year $ - 0

Fuel Consumption Data

Attachment B REV2Vessel:
Fuel Consumption DataRFP: N32205-18-R-3508

Offeror Instructions: Fill in the "Metric Tons/day" used by the vessel proposed, as applicable. Select "Fuel Type" from the drop down menu in the list below. If more than one fuel type is burned either underway or in-port please use extra rows provided.

Box #Description# DaysMetric Tons/dayFuel TypePrice per Metric TonTotal
89Fuel Underway (laden)934$ - 0
Other Fuel Type (if necessary)$ - 0
90Fuel Underway (ballast)280$ - 0
Other Fuel Type (if necessary)$ - 0
92In-Port Loading261$ - 0
Other Fuel Type (if necessary)$ - 0
92In-Port Discharging320$ - 0
Other Fuel Type (if necessary)$ - 0
TOTAL:$ - 0
Notes:
Fuel consumption calculations will be made using the following Defense Logistics Agency – Energy (DLA-E) standard prices and
appropriate fuel conversion factors. The rates to be used are as follows:
MGO:(1) $901.74 per metric ton
IFO-180:(2) $570.11 per metric ton
IFO-380:(3) $565.04 per metric ton
Note: Bunker C will be equated to IFO-380 if necessary. If a Vessel to be offered consumes fuel other than the above, the Offeror shall request,
prior to offers being received, that rates for that fuel be posted via an amendment.

Fuel conversion factors are as follows:

MGO:7.507 barrels per metric ton
IFO-180:6.526 barrels per metric ton
IFO-380:6.468 barrels per metric ton

TOTAL EVALUATED PRICE

TOTAL EVALUATED PRICE
PER DIEM
DAILY CHARTER HIRE RATE# OF DAYSTOTAL PER DIEM/PERIOD
BASE PERIOD$ - 0365$ - 0
OPTION 1$ - 0366$ - 0
OPTION 2$ - 0365$ - 0
OPTION 3$ - 0365$ - 0
OPTION 4$ - 0334$ - 0
FAR 52.217-8 OPTION$ - 0182$ - 0

TOTAL EVALUATED FUEL $ - 0

PORT CHARGES DIFFERENTIAL N/A

DELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

REDELIVERY BONUS (IF ANY) - TO BE PROPOSED BY THE OFFEROR $ - 0

TOTAL EVALUATED PRICE $ - 0

File details come from the government source that posted it.