Copy_of_SAMM_Solicitation_QA.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Shipboard Automated Maintenance Management (SAMM)
Solicitation number
N32205-18-R-1000
Issued by

About this file

Answers to Questions

View the file

Other files

File Type Posted
19_SAMM_Support_Sample_Task_Order_1_8.23.2018.docx DOCX document
10_Personnel_Qualifications_8.23.2018.docx DOCX document
Quality_Assurance_Surveillance_Plan.doc DOC document
All_CDRLs_8.23.2018.pdf PDF
08_ABS_RULES_FOR_SURVEY_AFTER_CONSTRUCTION_2018,_Part_7_8.30.2018.pdf PDF
N3220518R1000-0001.docx DOCX document
01_MSC_Maintenance_Management_Philosophy.pdf PDF
03_Vibration_Test_Analysis_Guide_Format.pdf PDF
02_SAMM_System_Description.pdf PDF
16_MSC_General_Technical_Requirements_(GTRs).doc DOC document
Quality_Assurance_Surveillance_Plan.pdf PDF
15_MSC_Computer_Aided_Designed_(CAD)_drawing_standard.pdf PDF
20_Ship_Introduction_Sample_Task_Order_2.docx DOCX document
13_Non-Disclosure_Agreements.docx DOCX document
22_SAMM_Contract_Sample_Task_1_Labor_Hour_By_Labor_Category_Estimate_Contractor.xlsx XLSX spreadsheet
26_MSC_Maintenance_Management_Policy.pdf PDF
07_MSC_Engineering_Professional_Development_Courses.xlsx XLSX spreadsheet
27_Ref_Info_Sheet.docx DOCX document
14_MSC_Technical_Library_Hardware_List.xlsx XLSX spreadsheet
25_Government_Furnished_Property.xlsx XLSX spreadsheet
08_ABS_RULES_FOR_SURVEY_AFTER_CONSTRUCTION_2016,_Part_7.pdf PDF
05_SAMM_System_Feedback_Process,_EPI.pdf PDF
N32205-18-R-1000_-_Solicitation.pdf PDF
06_SAMM_Feedback_Process_Review,_EWI.pdf PDF
04_SAMM_Maintenance_Development,_EWI.pdf PDF
09_Reliability_Centered_Maintenance_Handbook_(S9081-AB-GIB-010).pdf PDF
24_DD_FORM_254_CONTRACT_SECURITY_CLASSIFICATION.pdf PDF
23_SAMM_Contract_Sample_Task_2_Labor_Hour_By_Labor_Category_Estimate_Contractor.xlsx XLSX spreadsheet
Exhibit_A_-_CDRLs.pdf PDF
17_Master_Equipment_List.xlsx XLSX spreadsheet
21_Price_Proposal_Spreadsheet.xlsx XLSX spreadsheet
19_SAMM_Support_Sample_Task_Order_1.docx DOCX document
10_Personnel_Qualifications.pdf PDF
12_Resume_Format.docx DOCX document
Amendment_0001-_Notice_of_Intent_to_Solicit.pdf PDF
Notice_of_Intent_to_Solicit.pdf PDF
N32205-18-R-1000_Revised_Draft_Solicitation_3_May_2018.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Row #Paragraph/sectionContractor Question/CommentGovernment Response
1Section 1.3.1 of the QASPReferences the Quality Assurance Surveillance Plan (QASP) included as an unnumbered attachment to the solicitation. This attachment states “the Government will hold back 10% of the total value (excluding travel costs) until performance is complete” this amount could exceed expected profits, additionally for a task order with a lengthy period of performance this could amount to a significant amount of monies. Does the government really intend to exercise this hold back on a small business?The QASP has been updated. The Government will hold back one (1) percent of the total value (excluding travel costs) until performance is complete.
2QASPMany of the items in attachment 1 of the QASP require further discussion and may be dependent upon actions out of the contractor’s control. Will the contractor and government be able to further define these items after contract award?The QASP is a "living document" that dictates how the Government will surveil a contractor's performance and it can be updated at any time if the surveillance methodologies are not working, become overly burdensome, or the performance indicators change. If after award the contractor wants to provide input on surveillance methodologies they could provide that.
3Attachment 8Attachment 8 of the solicitation provides ABS RULES FOR SURVEY AFTER CONSTRUCTION 2016, Part 7, the most current version was updated in July 2018. This update differs significantly from the 2016 version of the document. Please confirm the government intended to provide the most recent version?Attachment 08 revised with latest version of ABS report
4Attachment 10Attachment 10 of the solicitation specifies “Post Graduate” experience for qualifications in lieu of a degree for the Senior Vibration Engineer and Vibration Engineer positions please verify this was not the government’s intent.Attachment 10 updated. The qualifications section has been updated. Please note that it was discovered that some cells had been unexpanded and certain criteria were hidden. Please review the entire document
5Sample Task Section 2.10.1References “J-21 – MSC Technical Library hardware list”, does the government intend to reference Attachment “14_MSC_Technical_Library_Hardware_List.xlsx”?Updated Sample Task to reference Attachment 14
6Sample Task Section 2.10.4References J-22 MSC Computer Aided Designed (CAD) drawing standard, does the government intend to reference Attachment “15_MSC_Computer_Aided_Designed_(CAD)_drawing_standard.pdf”?Updated Sample Task to reference Attachment 15
7Sample TaskSection 2.10.4References J-23 MSC General Technical Requirements (GTRs), does the government intend to reference Attachment “16_MSC_General_Technical_Requirements_(GTRs).doc”?Updated Sample Task to reference Attachment 16
8Solicitation SF14491) Block 8 of SF 1449 as well as the posting on FedBizOpps specifies a response date of 0900 September 9, 2018. The solicitation proposal submission information on page 54 states in part “All proposals in response to this solicitation shall be hand delivered or mailed to the address set forth below”. September 9, 2018 falls on a Sunday, would the government consider changing the response date to fall on a normal work day, or is the government requesting the package be delivered by 1700 on September 7? If the government specifies a normal work day, would the government consider changing the time to later in the work day?Response date changed to 0900 September 11, 2018.
9CDRL2) CDRL A033 Invoice Report (No. 19) seems to be geared towards a cost reimbursable contract please confirm that these details are necessary on a Firm Fixed Price contract.CDRL 33 is revised along with the applicable PWS paragrpah
10Section 6.1 of the PWSContract Line Item Number 0003 identifies SAMM Engineering Services – Travel as a Firm Fixed Price line item. However, section 6.1 on page 97 states “The Contractor shall be reimbursed for the reasonable actual cost of transportation, lodging, meals and incidental expenses when required to travel for this contract. Actual costs shall be considered reasonable, allowable, and reimbursable only to the extent that they do not exceed on a daily basis the maximum per diem rate in effect at the time of travel as set forth in the DOD Joint Travel Regulations (JFTR) located at http://www.defensetravel.dod.mil/. Actual cost does not include handling charges, general and administrative cost, overhead, profit or any other indirect cost.”

Please confirm that the Prime and Sub-Contractors are not allowed to add administrative costs to travel expenses in a Firm Fixed Price contract.

Travel is listed as Firm-Fixed-Price in the schedule and is not treated as a cost reimburable CLIN as the rules and regulations in FAR 31 do not apply. It is confirmed that administrative costs cannot be applied to travel.
11Instructions, Conditions and Notices to Offerors Table Page 55 of the PWSUnder the heading of Proposal Submission Information on page 55 the page limit for response to Technical Sub Factor 1 is 20 pages, would the government consider increasing this limit to 30 pages?Limit is increased to 30 pages.
12Instructions, Conditions and Notices to OfferorsTable Page 55 of the PWSUnder the heading of Proposal Submission Information on page 55 the page limit for response to Technical Sub Factor 2 is 30 pages, would the government consider increasing this limit to 50 pages?Limit is increased to 40 pages.
13Some of the questions asked are essential to both the technical and pricing portions of our response. Will the government consider answering these questions on an as soon as possible basis?Yes

File details come from the government source that posted it.