08_ABS_RULES_FOR_SURVEY_AFTER_CONSTRUCTION_2016,_Part_7.pdf

PDF 11 MB Posted

Attached to
Shipboard Automated Maintenance Management (SAMM)
Solicitation number
N32205-18-R-1000
Issued by

About this file

08 ABS Rules for Survey after Construction 2016

View the file

Other files

File Type Posted
19_SAMM_Support_Sample_Task_Order_1_8.23.2018.docx DOCX document
10_Personnel_Qualifications_8.23.2018.docx DOCX document
Quality_Assurance_Surveillance_Plan.doc DOC document
All_CDRLs_8.23.2018.pdf PDF
08_ABS_RULES_FOR_SURVEY_AFTER_CONSTRUCTION_2018,_Part_7_8.30.2018.pdf PDF
N3220518R1000-0001.docx DOCX document
Copy_of_SAMM_Solicitation_QA.xlsx XLSX spreadsheet
01_MSC_Maintenance_Management_Philosophy.pdf PDF
03_Vibration_Test_Analysis_Guide_Format.pdf PDF
02_SAMM_System_Description.pdf PDF
16_MSC_General_Technical_Requirements_(GTRs).doc DOC document
Quality_Assurance_Surveillance_Plan.pdf PDF
15_MSC_Computer_Aided_Designed_(CAD)_drawing_standard.pdf PDF
20_Ship_Introduction_Sample_Task_Order_2.docx DOCX document
13_Non-Disclosure_Agreements.docx DOCX document
22_SAMM_Contract_Sample_Task_1_Labor_Hour_By_Labor_Category_Estimate_Contractor.xlsx XLSX spreadsheet
26_MSC_Maintenance_Management_Policy.pdf PDF
07_MSC_Engineering_Professional_Development_Courses.xlsx XLSX spreadsheet
27_Ref_Info_Sheet.docx DOCX document
14_MSC_Technical_Library_Hardware_List.xlsx XLSX spreadsheet
25_Government_Furnished_Property.xlsx XLSX spreadsheet
05_SAMM_System_Feedback_Process,_EPI.pdf PDF
N32205-18-R-1000_-_Solicitation.pdf PDF
06_SAMM_Feedback_Process_Review,_EWI.pdf PDF
04_SAMM_Maintenance_Development,_EWI.pdf PDF
09_Reliability_Centered_Maintenance_Handbook_(S9081-AB-GIB-010).pdf PDF
24_DD_FORM_254_CONTRACT_SECURITY_CLASSIFICATION.pdf PDF
23_SAMM_Contract_Sample_Task_2_Labor_Hour_By_Labor_Category_Estimate_Contractor.xlsx XLSX spreadsheet
Exhibit_A_-_CDRLs.pdf PDF
17_Master_Equipment_List.xlsx XLSX spreadsheet
21_Price_Proposal_Spreadsheet.xlsx XLSX spreadsheet
19_SAMM_Support_Sample_Task_Order_1.docx DOCX document
10_Personnel_Qualifications.pdf PDF
12_Resume_Format.docx DOCX document
Amendment_0001-_Notice_of_Intent_to_Solicit.pdf PDF
Notice_of_Intent_to_Solicit.pdf PDF
N32205-18-R-1000_Revised_Draft_Solicitation_3_May_2018.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a r t 7 : R u l e s f o r S u r v e y A f t e r C o n s t r u c t i o n

RULES FOR

SURVEY AFTER CONSTRUCTION

PART 7

(Updated July 2016 – see next page)

American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862

2015 American Bureau of Shipping. All rights reserved.

ABS Plaza 16855 Northchase Drive Houston, TX 77060 USA

Updates

July 2016 consolidation includes:

• February 2016 version plus Notice No. 1 and Corrigenda/Editorials

February 2016 consolidation includes:

• January 2016 version plus Corrigenda/Editorials

R u l e C h a n g e N o t i c e ( 2 0 1 6 )

Rule Change Notice (2016) The effective date of each technical change since 1993 is shown in parenthesis at the end of the subsection/paragraph titles within the text of each Part. Unless a particular date and month are shown, the years in parentheses refer to the following effective dates:

(2000) and after 1 January 2000 (and subsequent years) (1996) 9 May 1996 (1999) 12 May 1999 (1995) 15 May 1995 (1998) 13 May 1998 (1994) 9 May 1994 (1997) 19 May 1997 (1993) 11 May 1993

Listing by Effective Dates of Changes from the 2015 Rules The reference date which is indicated in the parentheses following the title of the requirement in this Part is the date that the requirement becomes effective [e.g., 7-3-2/1.1.8 “Structural Fire Protection” (1 July 2015) is to apply for vessels undergoing survey on or after 1 July 2015].

Notice No. 1 (effective on 1 July 2015) to the 2015 Rules, which is incorporated in the 2016 Rules, is summarized below.

EFFECTIVE DATE 1 July 2015 – shown as (1 July 2015)

Part/Para. No. Title/Subject Status/Remarks 7-3-1/13 Vessels with the SH, SHCM Notation To specify that areas identified as critical areas in the SHCM plan should be specially considered when preforming visual examination of spaces. (Incorporates Notice No. 1)

7-3-2/1.1.8 Structural Fire Protection To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1)

7-4-1/1xvi) <No Title> To clarify the requirements. (Incorporates Notice No. 1)

7-4-1/1xxvi) (New)

<No Title> To align the requirements with Section 3-2-13 of the Steel Vessel Rules. (Incorporates Notice No. 1)

7-4-1/1xxvii) (New)

<No Title> To align the requirements with 4-3-3/9.5 of the Steel Vessel Rules.

(Incorporates Notice No. 1)

7-6-2/1.1.9(g) Fixed Fire Fighting System To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1)

7-6-2/3.1.1(t) (New)

CO2 and Foam Systems To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1)

7-6-2/3.1.1(u) (New)

Fixed Water Spray Systems To provide more detailed instructions for Surveyors. (Incorporates Notice No. 1)

7-9-16 Crew Habitability on Ships To consolidate the survey requirements for ship and workboat Habitability notations in Part 7. (Incorporates Notice No. 1)

7-9-17 Crew Habitability on Ships To consolidate the survey requirements for ship and yacht Comfort notations in Part 7. (Incorporates Notice No. 1)

7-9-18 (New)

Compliance with the ILO Maritime Labour Convention, 2006 Title 3 Requirements

To consolidate the survey requirements for Accommodation notations in Part 7. (Incorporates Notice No. 1)

7-9-19 Yachts To align the requirements with the new Yacht Guide. (Incorporates Notice No. 1)

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 iii

EFFECTIVE DATE 1 January 2016 – shown as (2016)

7-2-1/5.5 Unusual Cases To specify requirements for laid-up vessels.

7-2-1/13 Tailshaft Surveys To update procedures and methods for tailshaft surveys.

7-3-2/5.1.14(e) <No Title> To clarify that only mast connection points are to be examined, not the rigging, sails, or spars.

7-3-2/9.5.2 <No Title> To align the requirements with IACS UR Z10.1, Z10.2, Z10.3, Z10.4, and Z10.5 and to refer to the ABS Health and Safety Manual.

7-3-2/9.5.9 (Deleted)

<No Title> To remove requirements covered by IACS PR 37, which are covered in the ABS Health and Safety Manual.

7-3-2/9.5.10 (Deleted)

<No Title> To remove requirements covered by IACS PR 37, which are covered in the ABS Health and Safety Manual.

7-3-2/11.5.6 <No Title> To align the requirements with IMO Ship Construction File Guidelines.

7-3-2/11.7 (New)

Review of Documentation on Board To align the requirements with IMO Ship Construction File Guidelines.

7-5-1/1 (New)

General To update procedures and methods for tailshaft surveys.

7-5-1/3 (New)

Definitions To update procedures and methods for tailshaft surveys.

7-5-1/5 (New)

Oil Lubricated Shafts or Closed Loop System Fresh Water Lubricated Shafts (Closed System)

To update procedures and methods for tailshaft surveys.

7-5-1/7 (New)

Water Lubricated Shafts (Open Systems)

To update procedures and methods for tailshaft surveys.

7-6-2/1.5.1ii) Operating and Maintenance Instruction Manual

To clarify that the Operating and Maintenance Instruction Manual is not required to be approved.

7-6-2/1.7.1ii) Operating and Maintenance Instruction Manual

To clarify that the Operating and Maintenance Instruction Manual is not required to be approved.

7-6-2/3.1.2(a) Main and Auxiliary Internal Combustion Engines

To specify that medium speed diesels should not be treated differently than slow speed diesels.

7-9-10/3 (New)

Vessels with SPS Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/5 (New)

Offshore Supply Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/7 (New)

Vessels with the Supply HNLS Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/9 (New)

Vessels with the AH, TOW, and AH, TOW Notations

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/11 (New)

Vessels with the ROV Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/13 (New)

Vessels with the ROV Capable and DSV Capable Notations

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/15 (New)

Vessels with the DSV Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/17 (New)

Vessels with the Pipe Lay Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/19 (New)

Vessel with the Heavy Lift Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/21 (New)

Vessels with the Escort or QR Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

iv ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

7-9-10/23 (New)

Vessels with the WIND-IMR Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/25 (New)

Vessels with the Cable Lay Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/27 (New)

Vessels with the WI Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/29 (New)

Vessels with in the WI-Ready Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/31 (New)

Vessels with the WI-Temp Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/33 (New)

Well Intervention Vessels with no Specific Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/35 (New)

OSV Well Stimulation Vessel with no Class Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/37 (New)

Vessels with the WS-Ready Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/39 (New)

Vessels with the WS-Temp Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/41 (New)

Vessels with the WS Notation To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/43 (New)

Vessels with Well Test Systems with no Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/45 (New)

Vessels with the WT-Ready and WT-Temp Notations

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-9-10/47 (New)

Vessels with the Well Test Service Notation

To provide ship-specific requirements for equipment, safety devices, and documentation for OSVs.

7-A-4/Table 2 Individual Wastage Allowances, Conventional Vessels Under 90 Meters (295 Feet)

To align the requirements with IACS and the ABS Steel Vessel Rules.

7-A-12/9 Personnel Requirements To provide reference to applicable standards for operator training and qualification for NDT.

7-A-14/13.1 General To encourage operators to apply planned maintenance activities on their assets.

7-A-14/15.1 General To encourage operators to apply condition monitoring techniques as a part of the maintenance activities on their assets.

7-A-14/15.9.4 Diesel Engine Bearing Wear Monitoring Systems

To clarify that the system to be installed is to be type approved and the technician should know how and where to install the critical sensors for the system.

Listing by Effective Dates of Changes from the 2016 Rules

Notice No. 1 (effective on 1 July 2016) to the 2016 Rules, is summarized below.

EFFECTIVE DATE 1 July 2016 – shown as (1 July 2016)

7-3-1/13 Vessels with the SH, SHCM or CSR, AB-CM Notation To specify that areas identified as critical areas should be specially considered when preforming visual examination of spaces.

(Incorporates Notice No. 1)

7-3-2/3.15.3(a)i) Ballast Tanks To align the requirements with IACS requirements. (Incorporates

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 v

7-3-2/5.7.4(a)iv) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.7.4(b)vi) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.7.4(c)vi) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.7.4(d)vi) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.13.6(b) Note i)

<No Title> To clarify that what is to be included in the tank testing procedure.

(Incorporates Notice No. 1)

7-3-2/5.14.6(b) Note i)

<No Title> To clarify that what is to be included in the tank testing procedure.

(Incorporates Notice No. 1)

7-3-2/5.15.4(a)iii) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.15.4(b)v) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.15.4(c)v) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.15.4(d)v) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.19.4(a)iii) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.19.4(b)iii) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.19.4(b)v) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.19.4(c)iii) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.19.4(c)v) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.19.4(d)iii) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.19.4(d)v) <No Title> To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-3-2/5.21.6(b) Note i)

<No Title> To clarify that what is to be included in the tank testing procedure.

(Incorporates Notice No. 1) vi ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

7-A-16/Table 7 Minimum Requirements for CLOSE-

UP Examination at Special Periodical Surveys – Bulk Carriers – Non Double Skin ESP and Bulk Carrier Features of Combination Carriers – Non Double Skin ESP

To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates Notice No. 1)

7-A-16/Table 11 Minimum Requirements for CLOSE- UP Examination at Special Periodical Surveys – Tankers ESP (Oil Carriers and Oil Carrier Features of Combination Carriers – Double Hull) and Oil/Fuel Oil Tank Barges – Double Hull 122 meters (400 feet) and over in Length

To clarify the requirements for survey for structural elements.

(Incorporates Notice No. 1)

7-A-16/Table 15 Minimum Requirements for CLOSE- UP Examination at Special Periodical Surveys – Bulk Carriers – Double Skin ESP and Bulk Carrier Features of Combination Carriers – Double Skin ESP

To clarify that vessels’ parts that are inaccessible need not be surveyed or have thickness measurements taken. (Incorporates

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 vii

P A R T F o r e w o r d

Foreword (2001) In an effort to facilitate usage and better maintain survey after construction Rules, ABS has consolidated twenty-two (22) ABS Rules and Guides into this “Rules for Survey after Construction” booklet for 2001.

These requirements apply to and supersede all survey after construction Rules required by the ABS Rules and Guides listed in Chapter 1, Section 1, Subsection 1 “Application” (7-1-1/1) of these Rules. These Rules do not apply to any other ABS Rules or Guide containing survey after construction requirements unless a particular Rule or Guide references any of the survey requirements of the ABS Rules or Guides listed in 7-1-1/1.

Chapters 1 through 8 contains survey Rules that have common requirements for different vessel types and geographical service areas. Where survey requirements differ according to the vessel’s geographical limitation in these Rules, the chapter has been sectioned into Unrestricted Service, Great Lakes Service, and Rivers and Intracoastal Waterways Services.

Where survey requirements are common to different vessel types, each survey type will contain requirements applicable to all vessels. When additional requirements are applicable to a specific vessel type, or are in lieu of the common requirement, they will be listed after the requirements for all vessels. The requirements for vessels in the Enhanced Survey Program (ESP) have been incorporated into each survey type.

Chapter 9 contains survey requirements to maintain a Class Notation for an additional system or service.

Chapters 10 through 12 contain unique survey Rules for Floating Drydocks, Underwater Vehicles and Sailing Yachts not Receiving AMS Notation. The survey interval and survey requirements noted in these chapters only apply to these vessel types.

The Appendix includes several ABS Guides relating to survey after construction and also contains planning, reporting and certification of thickness measurement firms required by the Enhanced Survey Program.

In order to further explain the new formatting contained in these Rules, sample vessels and their applicable survey requirements are illustrated in the table on the following page.

viii ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

Examples:

Sample Vessels:

• À A1 Bulk Carrier, Á, À AMS, À ACCU (ESP)

• À A1 Oil Carrier, Á, À AMS (ESP)

• A1 Container Carrier, AMS, ACCU, OMBO

• À A1 Barge, River, Bay and Sound Service

Survey Type

Bulk Carrier Oil Carrier Container Carrier

Barge

Annual Survey Hull

All Vessel Requirements Specific Vessel requirements

7-3-2/1.1 7-3-2/1.7

7-3-2/1.13

7-3-2/1.5

Intermediate Survey Hull

7-3-2/3.1 7-3-2/3.7

7-3-2/3.17

7-3-2/3.5

Special Periodical Survey Hull All Vessel Requirements Specific Vessel requirements

Thickness Measurement requirements

7-3-2/5.1 7-3-2/5.7

7-3-2/5.7.3

7-3-2/5.13

7-3-2/5.13.4

7-3-2/5.1.14(c)

7-3-2/5.5 7-3-4/1 7-3-4/1.3

Drydocking Survey 7-4-1/1 7-4-1/1 7-4-1/1 7-4-1/1

Tailshaft Survey 7-5-1/1 7-5-1/1 7-5-1/1 Not applicable

Annual Survey Machinery

All Vessel Requirements

OMBO notation

7-6-2/1.1

7-6-2/1.3

7-9-3/1.1

Special Periodical Survey Machinery

7-6-2/3.1

7-6-2/3.3

Boiler Survey 7-7-1 7-7-1 7-7-1 Not applicable

Annual Survey Automation 7-8-1 7-8-1 7-8-1 Not applicable

Special Periodical Survey Automation

7-8-2 7-8-2 7-8-2 Not applicable

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 ix

P A R T T a b l e o f C o n t e n t s

Rules for Survey After Construction

CONTENTS

CHAPTER 1 Conditions for Survey After Construction

Section 1 General Information

CHAPTER 2 Survey Intervals

Section 1 Vessels for Unrestricted Service Section 2 Vessels in Great Lakes Service Section 3 Vessels in Rivers and Intracoastal Waterway Service Section 4 Survey After Ocean Transit Tow

CHAPTER 3 Hull Surveys

Section 1 Requirements for Internal Examination of All Vessels Section 2 Vessels for Unrestricted Service Section 3 Vessels in Great Lakes Service Section 4 Vessels in Rivers and Intracoastal Waterways Service

CHAPTER 4 Drydocking Surveys

Section 1 Survey Requirements

CHAPTER 5 Tailshaft Surveys

Section 1 Survey Requirements Section 2 Allowable Bearing Weardown

CHAPTER 6 Machinery Surveys

Section 1 General Section 2 Survey Requirements Section 3 Vessels in Great Lakes Service

CHAPTER 7 Boiler Surveys

Section 1 Survey Requirements

CHAPTER 8 Shipboard Automatic and Remote-control Systems

Section 1 Annual Surveys Section 2 Special Periodical Surveys x ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

CHAPTER 9 Survey Requirements for Additional Systems and Services Section 1 Cargo Refrigeration Systems Section 2 Hull Condition Monitoring System Section 3 One Man Bridge Operated System Section 4 Propulsion Redundancy System Section 5 Quick Release System Section 6 Thrusters and Dynamic Positioning System Section 7 Vapor Emission Control Systems Section 8 Fire Fighting Service Section 9 Safety Standby Service Section 10 Offshore Installations Support Service Section 11 Oil Recovery Service Section 12 Automatic or Remote Control and Monitoring Systems for Vessels in Port Section 13 Bridge Design and Navigational Equipment/Systems Section 14 Integrated Tug-Barge (ITB) Combinations Intended to

Operate on the Great Lakes Section 15 Environmental Safety Section 16 Crew Habitability on Ships and Workboats Section 17 Comfort on Ships and Yachts Section 18 Compliance with the ILO Maritime Labour Convention, 2006 Title 3 Requirements Section 19 Yachts Section 20 Tailshaft Condition Monitoring Section 21 Oil Carriers Equipped for Mooring at Single Point

Moorings Section 22 Inert Gas Systems for Ballast Tanks Section 23 Inventory of Hazardous Materials

CHAPTER 10 Steel Floating Drydocks

Section 1 Survey Interval Section 2 Hull Surveys Section 3 Machinery Surveys

CHAPTER 11 Underwater Vehicles, Systems and Hyperbaric Facilities

Section 1 General Section 2 Survey Interval Section 3 Annual Surveys Section 4 Special Periodical Surveys Section 5 Survey for Transit Damage Section 6 Replacement of Viewports

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 xi

CHAPTER 12 Sailing Yachts not Receiving AMS Notation Section 1 Survey Intervals Section 2 Hull Surveys Section 3 Machinery Surveys Section 4 Comfort on Yachts

APPENDIX

Section 1 Underwater Inspection in Lieu of Drydocking Surveys Section 2 Survey of Voyage Repairs to Hull Structure Section 3 Vessel Lay-up and Reactivation Section 4 Additional Information for Hull Thickness

Measurement Section 5 Procedures for Certification of Firms Engaged in

Thickness Measurement of Hull Structures Section 6 Report on Thickness Measurement of Bulk Carriers –

Non Double Skin (CSR and Non-CSR Vessels) and General Dry Cargo Vessels

Section 7 Report on Thickness Measurement of Oil Carriers – Non Double Hull, Ore/Oil Ships – Non Double Hull and Chemical Carriers, etc

Section 8 Intermediate and Special Periodical Survey Preparation for ESP Vessels

Section 9 Reporting Principles for ESP Vessels Section 10 Bronze and Stainless Steel Propeller Castings Section 11 Repair and Cladding of Shafts Section 12 Ultrasonic Examination of Carbon Steel Forgings for

Tail Shafts Section 13 Report on Thickness Measurement of Oil Carriers –

Double Hull (CSR and Non-CSR Vessels) Section 14 Surveys Based on Preventative Maintenance

Techniques Section 15 Report on Thickness Measurement of Bulk Carriers –

Double Skin (CSR and Non-CSR Vessels) Section 16 Thickness Measurement and Close-up Survey

Requirements at Special Periodical Surveys Section 17 Survey of Portable Industrial Modules xii ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

P A R T C h a p t e r 1 : C o n d i t i o n s f o r S u r v e y A f t e r C o n s t r u c t i o n

C H A P T E R 1 Conditions for Survey After Construction

CONTENTS

SECTION 1 General Information

1 Application

1.1 Chapters 1 through 9

1.3 Chapters 1 and 10 through 12

1.5 Appendix

1.7 Enhanced Survey Program (ESP) Notations

1.9 Expanded Survey (ESDC) Notations

3 Definitions

3.1 Active Corrosion

3.2 Air Pipe Head

3.3 Allowable Corrosion or Wastage Limit

3.5 Bay

3.7 Ballast Tank – All Vessels

3.9 Ballast Tank – Tankers ESP

3.11 Ballast Tank – Bulk Carriers ESP

3.13 Bulk Carrier

3.14 Bulk Carrier – Double Skin

3.15 Cargo Area – Tankers

3.16 Cargo Length Area – All Vessels

3.17 Chemical Carrier

3.19 Close-up Survey

3.21 Coating Condition

3.23 Combined Cargo/Ballast Tank – All Vessels

3.25 Corrosion Prevention System

3.27 Critical Structural Areas

3.28 Edge Corrosion

3.29 Excessive Corrosion

3.31 Extensive Area of Corrosion

3.33 General Dry Cargo Vessel (ESDC)

3.35 Grooving Corrosion

3.36 Lightering Service

3.37 Localized Corrosion

3.39 Oil

3.41 Oil Carrier

3.43 Oil Carrier – Double Hull

3.45 Overall Corrosion

3.47 Overall Survey

3.49 Panel

3.51 Pitting Corrosion

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 1

3.53 Prompt and Thorough Repair

3.54 Renewal Thickness

3.55 Representative Spaces/Tanks

3.56 Ro-Ro Definitions

3.57 Serious/Significant Corrosion

3.59 Spaces

3.60 Special Consideration

3.61 Substantial Corrosion

3.63 Superstructure Deck

3.65 Suspect Areas

3.67 Tanker

3.68 Topside Ballast Tanks

3.69 Transverse Section (Girth Belt/Belt)

3.71 Weld Metal Corrosion

3.73 Wind and Water Strakes

5 Notification and Availability for Survey 7 Damage, Failure and Repair

7.1 Examination and Repair

7.3 Suspension of Classification

7.5 Prompt and Thorough Repairs

7.7 Representation

9 Alterations 11 Welding and Replacement of Materials

11.1 Ordinary and Higher Strength Structural Steels

11.3 Special Materials

13 Incomplete Surveys 15 Vessels Confined to a Specific Location 17 Lay-up and Reactivation

17.1 Vessels for Unrestricted Service and in Rivers and Intracoastal Waterways Services

17.3 Vessels in Great Lakes Service

19 Vessels in Lightering Service 21 Vessels Utilized in Support of Military Operations

FIGURE 1

FIGURE 2

FIGURE 3

FIGURE 4

FIGURE 5

FIGURE 6

2 ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

P A R T S e c t i o n 1 : G e n e r a l I n f o r m a t i o n

C H A P T E R 1 Conditions for Survey After Construction

S E C T I O N 1 General Information

1 Application (2002)

1.1 Chapters 1 through 9 (2013)

The requirements for Survey After Construction contained in Part 7, Chapters 1 through 9 apply to the following ABS Rules and Guides:

• Rules for Building and Classing Steel Vessels

• Rules for Building and Classing Steel Vessels Under 90 Meters in Length

• Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways

• Rules for Building and Classing Bulk Carriers for Service on the Great Lakes

• Rules for Building and Classing Steel Barges

• Guide for Building and Classing Accommodation Barges

• Rules for Building and Classing High Speed Craft

• Rules for Building and Classing Offshore Support Vessels

• Rules for Building and Classing High-Speed Naval Craft

• Guide for Building and Classing Yachts

• Guide for Building and Classing Integrated Tug-Barge (ITB) Combinations Intended to Operate on the Great Lakes

• Guide for the Environmental Protection Notation for Vessels

• Guide for the Environmental Protection Notation for Offshore Units, Floating Installations, and Liftboats

• Guide for Hull Condition Monitoring Systems

• Guide for One Man Bridge Operated (OMBO) Ships

• Guide for Automatic or Remote Control and Monitoring Systems for Vessels in Port

• Guide for Bridge Design and Navigational Equipment/Systems

1.3 Chapters 1 and 10 through 12 (2005)

The requirements for Survey After Construction contained in Part 7, Chapters 1 and 10 through 12 apply to the following ABS Rules and Guides:

• Rules for Building and Classing Steel Floating Drydocks

• Rules for Building and Classing Underwater Vehicles, Systems and Hyperbaric Facilities

• Guide for Building and Classing Yachts

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 3

Part 7 Rules for Survey After Construction Chapter 1 Conditions for Survey After Construction Section 1 General Information 7-1-1

1.5 Appendix (2013)

Additionally, the following Appendices are contained in Part 7:

• Underwater Inspection in Lieu of Drydocking

• Survey of Voyage Repairs to Hull Structure

• Lay-up and for Reactivation of Laid-up Ships

• Hull Thickness Measurement

• Bronze and Stainless Steel Propeller Castings

• Repair and Cladding of Shafts

• Ultrasonic Examination of Carbon Steel Forgings for Tail Shafts

• Preventative Maintenance Techniques Note: SVR references in these Survey After Construction Rules refer to the Rules for Building and Classing Steel Vessels.

1.7 Enhanced Survey Program (ESP) Notations (2005)

Oil carriers including combination carriers, bulk carriers and chemical carriers, as defined in 7-1-1/3, are subject to an Enhanced Survey Program and will be identified in the Record by the notation, ESP. These vessels are to comply with the requirements identified in this Part as ESP vessels (e.g., Bulk Carriers ESP, etc.).

1.7.1 Ship Type and Enhanced Survey Program (ESP) Notations

1.7.1(a) Oil Carrier (1 July 2012). The ship type notation Oil Carrier, or equivalent (e.g., Fuel Oil Carrier), and the notation, ESP is to be assigned to seagoing self-propelled ships which are constructed generally with integral tanks and intended primarily to carry oil in bulk. Refer to definition of oil as noted in 7-1-1/3.39. This type notation is to be assigned to tankers of both single and double hull construction, as well as tankers with alternative structural arrangements, e.g., mid-deck designs. Typical midship sections are given in 7-1-1/Figure 1.

Note: Oil Tankers that do not comply with MARPOL I/19 may be subject to International and/or National

Regulations requiring phase out under MARPOL I/20 and/or MARPOL I/21.

FIGURE 1

1.7.1(b) Bulk Carrier. The ship type notation Bulk Carrier, or equivalent, and the notation, ESP is to be assigned to seagoing self-propelled ships which are constructed generally with single deck, double bottom, hopper side tanks and topside tanks and with single or double side skin construction in cargo length area and intended primarily to carry dry cargoes in bulk. Typical midship sections are given in 7-1-1/Figure 2.

4 ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

FIGURE 2

1.7.1(c) Ore Carrier. The ship type notation Ore Carrier, or equivalent, and the notation, ESP is to be assigned to seagoing self-propelled ships which are constructed generally with single deck, two longitudinal bulkheads and a double bottom throughout the cargo length area and intended primarily to carry ore cargoes in the center holds only. Typical midship sections are given in 7-1-1/Figure 3.

FIGURE 3

1.7.1(d) Combination Carrier (1 July 2012). “Combination carrier” is a general term applied to ships intended for the carriage of both oil and dry cargoes in bulk; these cargoes are not carried simultaneously, with the exception of oily mixture retained in slop tanks. The ship types defined in i) and ii) below are to be considered to be combination carriers.

i) The ship type notation Ore/Oil Carrier, or equivalent, and the notation, ESP is to be assigned to seagoing self-propelled ships which are constructed generally with single deck, two longitudinal bulkheads and a double bottom throughout the cargo length area and intended primarily to carry ore cargoes in the center holds or of oil cargoes in center holds and wing tanks. Typical midship sections are given in 7-1-1/Figure 4.

Note: Ore/Oil carriers that do not comply with MARPOL I/19 may be subject to International and/or

National Regulations requiring phase out.

FIGURE 4

ii) The ship type notation Oil/Bulk/Ore (OBO) Carrier, or equivalent, and the notation, ESP is to be assigned to seagoing self-propelled ships which are constructed generally with single deck, double bottom, hopper side tanks and topside tanks, and with single or double side skin construction in the cargo length area, and intended primarily to carry oil or dry cargoes, including ore, in bulk. Typical midship sections are given in 7-1-1/Figure 5.

Note: Oil/Bulk/Ore carriers that do not comply with MARPOL I/19 may be subject to International and/or National Regulations requiring phase out.

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 5

FIGURE 5

1.7.1(e) Chemical Carrier. The ship type notation Chemical Carrier, or equivalent, and the notation, ESP is to be assigned to seagoing self-propelled ships which are constructed generally with integral tanks and intended primarily to carry chemicals in bulk. This type notation is to be assigned to tankers of both single or double hull construction, as well as tankers with alternative structural arrangements. Typical midship sections are given in 7-1-1/Figure 6.

FIGURE 6

1.9 Expanded Survey (ESDC) Notations (2005)

General Dry Cargo Vessels as defined by 7-1-1/3.33 are subject to an Expanded Survey and will be identified in the Record by the notation ESDC. These vessels are to comply with the requirements identified in this Part as “General Dry Cargo Vessels (ESDC)”.

3 Definitions (1999)

3.1 Active Corrosion

Active Corrosion means loose scale and evidence of moisture penetration to the steel.

3.2 Air Pipe Head (1 July 2006)

Air Pipe Heads installed on the exposed decks are those extending above the freeboard deck or superstructure decks.

3.3 Allowable Corrosion or Wastage Limit

Allowable Corrosion or Wastage Limit is the acceptable corrosion limit for the vessel’s structure in a given area. Also known as Allowable Limit.

3.5 Bay

Bay is the area between adjacent transverse frames from longitudinal bulkhead to longitudinal bulkhead (or side shell).

3.7 Ballast Tank – All Vessels (1 July 2006)

A Ballast Tank is a tank which is used primarily for the carriage of salt water ballast.

6 ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

3.9 Ballast Tank – Tankers ESP (1 July 2006)

A Ballast Tank is a tank which is used solely for the carriage of salt water ballast.

3.11 Ballast Tank – Bulk Carriers ESP (1 July 2006)

A Ballast Tank is a tank which is used solely for salt water ballast, or where applicable, a space which is used for both cargo and salt water ballast will be treated as a ballast tank when substantial corrosion has been found in that space. A double side tank is to be considered as a separate tank even if it is in connection to either the topside tank or the hopper side tank.

3.13 Bulk Carrier (1 July 2013)

A Bulk Carrier is a ship which is constructed generally with single deck, double bottom, topside tanks and hopper side tanks in cargo spaces, and is intended primarily to carry dry cargo in bulk. Combination Carriers are included. Ore and combination carriers are not subject to the IACS Common Structural Rules.

3.14 Bulk Carrier – Double Skin (1 July 2006)

A Double Skin Bulk Carrier is a ship which is constructed generally with single deck, topside tanks and hopper side tanks in cargo spaces, and is intended primarily to carry dry cargo in bulk, including such types as Ore Carrier and Combination Carrier, in which all cargo holds are bounded by a double-side skin (regardless of the width of the wing space).

3.15 Cargo Area – Tankers (1 July 2006)

Cargo Area is that part of the ship that contains cargo tanks, slop tanks and cargo/ballast pump rooms, cofferdams, ballast tanks, fuel tanks and void spaces adjacent to cargo tanks or slop tanks; and also deck areas throughout the entire length and breadth of the part of the ship over the above-mentioned spaces.

Where independent tanks are installed in hold spaces, cofferdams, ballast or void spaces at the after end of the aftermost hold space or at the forward end of the forwardmost hold space are excluded from the cargo area.

3.16 Cargo Length Area – All Vessels (1 July 2006)

Cargo Length Area is that part of the vessel which contains cargo holds and adjacent areas including fuel tanks, cofferdams, ballast tanks and void spaces.

3.17 Chemical Carrier

A Chemical Carrier is a ship which is constructed or adapted and used for the carriage in bulk of any liquid product listed in the SVR Section 5C-9-17.

3.19 Close-up Survey

A Close-up Survey is a survey where the details of structural components are within the close visual inspection range of the Surveyor, i.e., normally within hand’s reach.

3.21 Coating Condition (1 July 2006)

Coating Condition of hard coatings is defined as follows:

GOOD is a condition with only minor spot rusting.

FAIR is a condition with local breakdown at edges of stiffeners and weld connections and/or light rusting over 20% or more of areas under consideration, but less than as defined for POOR condition.

POOR is a condition with general breakdown of coating over 20% or more of areas, or hard scale at 10% or more of areas under consideration.

Reference is made to IACS Recommendation No.87 “Guidelines for Coating Maintenance & Repairs for Ballast Tanks and Combined Cargo / Ballast Tanks on Oil Tankers”.

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 7

3.23 Combined Cargo/Ballast Tank – All Vessels (1 July 2011)

A Combined Cargo/Ballast Tank is a tank which is used for the carriage of cargo or ballast water as a routine part of the vessel’s operation and will be treated as a ballast tank. Cargo tanks in which water ballast might be carried only in exceptional cases per MARPOL I/18(3) are to be treated as cargo tanks.

3.25 Corrosion Prevention System (2010)

A Corrosion Prevention System is normally considered a full hard protective coating. Hard Protective Coating is usually to be epoxy coating or equivalent. Other coating systems, which are neither soft nor semi-hard coatings, may be considered acceptable as alternatives, provided that they are applied and maintained in compliance with the manufacturer's specification.

3.27 Critical Structural Areas

Critical Structural Areas are locations which have been identified from calculations to require monitoring or from the service history of the subject ship or from similar or sister ships to be sensitive to cracking, buckling or corrosion that could impair the structural integrity of the ship.

3.28 Edge Corrosion (1 July 2013)

Edge Corrosion is defined as local corrosion at the free edges of plates, stiffeners, primary support members and around openings. An example of edge corrosion is shown in 7-A-4/Figure 3.

3.29 Excessive Corrosion

Excessive Corrosion is corrosion that exceeds the allowable limit.

3.31 Extensive Area of Corrosion

Extensive Area of Corrosion is corrosion of hard and/or loose scale, including pitting, over 70% or more of the plating surface in question, accompanied by evidence of thinning.

3.33 General Dry Cargo Vessel (ESDC) (1 July 2014)

A General Dry Cargo Vessel (ESDC) is a vessel carrying solid cargoes other than:

• Bulk carriers, Double Skin or Non-Double Skin, subject to ESP

• Dedicated container carriers

• Ro-ro cargo vessels

• Refrigerated cargo vessels

• Dedicated wood chip carriers

• Dedicated cement carriers

• Livestock carriers

• Deck cargo ships (A deck cargo ship is a ship that is designed to carry cargo exclusively above deck without any access for cargo below deck.)

• (1 July 2012) General dry cargo ships of double side-skin construction, with double side-skin extending for the entire length of the cargo area, and for the entire height of the cargo hold to the upper deck.

3.35 Grooving Corrosion (1 July 2013)

Grooving Corrosion is typically local material loss adjacent to weld joints along abutting stiffeners and at stiffener or plate butts or seams. An example of groove corrosion is shown in the appendix 7-A-4/Figure 4.

3.36 Lightering Service (1 July 2004)

Lightering Service is defined as the side-by-side mooring of two vessels, either while underway or stationary, for the purpose of transferring petroleum cargo, excluding bunkers, from a ship to be lightered to a service vessel. Both the lightered vessel and the service vessel are to be considered in lightering service.

8 ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

3.37 Localized Corrosion

Localized Corrosion is by name local in nature and may be caused by a local breakdown in coating from contact damage, insufficient preparation or at areas of stress concentration.

3.39 Oil

Oil, for the purpose of the Rules, means petroleum in any form including crude oil, fuel oil, sludge, oil refuse and refined products other than petrochemicals which are subject to the provisions of Annex II of

MARPOL 73/78.

3.41 Oil Carrier

An Oil Carrier is a ship which is constructed primarily to carry oil in bulk and includes a ship of similar types such as a Combination Carrier (Ore/Oil), etc.

3.43 Oil Carrier – Double Hull (2004)

An Oil Carrier – Double Hull is a ship which is constructed primarily to carry oil in bulk and includes similar types of ships such as a Combination Carrier (Ore/Oil), etc., which have the cargo tanks protected by a double hull which extends for the entire length of the cargo area, consisting of double sides and double bottom spaces for the carriage of water ballast or void spaces.

3.45 Overall Corrosion

Overall Corrosion appears as a non-protective rust which can uniformly occur on tank internal surfaces that are uncoated, or where coating has totally deteriorated. The rust scale continues to break off, exposing fresh metal to corrosive attack. Thickness cannot be judged visually until excessive loss has occurred.

3.47 Overall Survey

An Overall Survey is a survey intended to report on the overall condition of the hull structure and to determine the extent of additional Close-up Surveys.

3.49 Panel

Panel is the area between adjacent transverse frames from longitudinal stiffener to longitudinal stiffener.

3.51 Pitting Corrosion (1 July 2013)

Pitting Corrosion is defined as scattered corrosion spots/areas with local material reductions which are greater than the general corrosion in the surrounding area. Pitting intensity is defined in 7-A-4/Figure 5.

3.53 Prompt and Thorough Repair

A Prompt and Thorough Repair is defined as a permanent repair completed at the time of the survey to the satisfaction of the Surveyor.

3.54 Renewal Thickness (1 July 2013)

Renewal Thickness (tren) is the minimum allowable thickness, in mm, below which renewal of structural members is to be carried out.

3.55 Representative Spaces/Tanks (1 July 2006)

Representative Spaces/Tanks are those which are expected to reflect the condition of other spaces of similar type and service and with similar corrosion prevention systems. When selecting representative spaces, account should be taken of the service and repair history onboard and identifiable Critical Structural Areas and/or Suspect Areas.

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 9

3.56 Ro-Ro Definitions (2012)

3.56.1 Ro-Ro Ship

A ship which utilizes a loading ramp to enable wheeled vehicles to be rolled-on and rolled-off the ship.

3.56.2 Ro-Ro Passenger Ship(Ro-Pax)

A passenger ship with Ro-Ro spaces or special category spaces.

3.56.3 Ro-Ro Spaces

Spaces not normally sub-divided in any way and normally extending to either a substantial length or the entire length of the ship, in which motor vehicles with fuel in their tanks for their own propulsion and/or goods (packaged or in bulk, in or on rail or road cars, vehicles (including road or rail tankers), trailers, containers, pallets, demountable tanks or in or on similar stowage units or, other receptacles) can be loaded and unloaded normally in a horizontal direction.

3.56.4 Special Category Spaces

Those enclosed vehicle spaces above or below the bulkhead deck, into and from which vehicles can be driven and to which passengers have access. Special category spaces may be accommodated on more than one deck provided that the total overall clear height for vehicles does not exceed 10 m.

3.56.5 Securing Device

A device used to keep the door closed by preventing it from rotating about its hinges.

3.56.6 Supporting Device

A device used to transmit external or internal loads from the door to a securing device and from the securing device to the ship’s structure, or a device other than a securing device, such as a hinge, stopper or other fixed device, that transmits loads from the door to the ship’s structure.

3.56.7 Locking Device

A device that locks a securing device in the closed position.

3.57 Serious/Significant Corrosion

Serious/Significant Corrosion means more than 30% corrosion, and active scale is present. Active scale that is loose or has fallen off the structure.

3.59 Spaces (1 July 2008)

Spaces are separate compartments including holds, tanks, cofferdams, and void spaces bounding cargo holds, decks, and the outer hulls.

3.60 Special Consideration (1 July 2006)

Special Consideration or Specially Considered (in connection with close-up surveys and thickness measurements) means sufficient close-up inspection and thickness measurements are to be taken to confirm the actual average condition of the structure under the coating.

3.61 Substantial Corrosion

Substantial Corrosion is an extent of corrosion such that assessment of the corrosion pattern indicates a wastage in excess of 75% of the allowable margins, but within the acceptable limits.

Note: Wastage allowances may be found in 7-A-4/Table 1 and 7-A-4/Table 2.

(1 July 2013) For vessels built under the IACS Common Structural Rules, substantial corrosion is an extent of corrosion such that the assessment of the corrosion pattern indicates a measured thickness between tren + 0.5 mm and tren.

3.63 Superstructure Deck

For gauging purposes, a Superstructure Deck is a deck over an enclosed superstructure i.e., the first tier deck.

10 ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

3.65 Suspect Areas

Suspect Areas are locations showing substantial corrosion and/or are considered by the Surveyor to be prone to rapid wastage.

3.67 Tanker

A Tanker is a ship which is constructed primarily to carry liquid cargo in bulk. Oil Carriers, Combination Carriers, Chemical Carriers and Liquefied Gas Carriers are included in this category.

3.68 Topside Ballast Tanks (2005)

Topside Ballast Tanks are ballast tanks in bulk carriers that normally extend along the length of the vessel’s side and occupy the upper corners of the cargo hold.

3.69 Transverse Section (Girth Belt/Belt) (1 July 2006)

A Transverse Section includes all longitudinal members such as plating, longitudinals and girders at the deck, sides, bottom, inner bottom, longitudinal bulkheads, hopper sides, inner sides and bottoms of topside tanks. For transversely framed vessels, a transverse section includes adjacent frames and their end connections in way of transverse sections.

3.71 Weld Metal Corrosion

Weld Metal Corrosion is defined as preferential corrosion of the weld deposit. The most likely reason for this attack is galvanic action with the base metal which may start as pitting and often occurs on hand welds as opposed to machine welds.

3.73 Wind and Water Strakes

Wind and Water Strakes are the two (2) strakes located in the vicinity of the load waterline. Due to vessel’s trim, the strakes may vary over the length of the vessel.

5 Notification and Availability for Survey The Surveyors are to have access to classed vessels at all reasonable times. The Owners or their representatives are to notify the Surveyors on all occasions when a vessel can be examined in dry dock or on a slipway.

The Surveyors are to undertake all surveys on classed vessels upon request, with adequate notification, of the Owners or their representatives and are to report thereon to the Committee. Should the Surveyors find occasion during any survey to recommend repairs or further examination, notification is to be given immediately to the Owners or their representatives in order that appropriate action may be taken. The Surveyors are to avail themselves of every convenient opportunity for carrying out periodical surveys in conjunction with surveys of damages and repairs in order to avoid duplication of work. See also 1-1-8/5 of the ABS Rules for Conditions of Classification (Part 1).

7 Damage, Failure and Repair

7.1 Examination and Repair

7.1.1

Damage, failure, deterioration or repair to hull, machinery or equipment, which affects or may affect classification, is to be submitted by the Owners or their representatives for examination by a Surveyor at first opportunity. All repairs found necessary by the Surveyor are to be carried out to the Surveyor’s satisfaction.

7.1.2 Where repairs to hull, machinery or equipment, which affect or may affect classification, are planned in advance to be carried out, a complete repair procedure including the extent of proposed repair and the need for Surveyor’s attendance is to be submitted to and agreed upon by ABS reasonably in advance.

Note: The above paragraph applies also to repairs during voyage. See Appendix 7-A-2.

ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016 11

The above paragraph is not intended to include maintenance and overhaul to hull, machinery and equipment in accordance with the manufacturer's recommended procedures and established marine practice and which does not require ABS approval; however, any repair as a result of such maintenance and overhauls which affects or may affect classification is to be noted in the ship's log and submitted to the Surveyor, as required by 7-1-1/7.1.

Material, components and equipment used in the course of a repair for which the Rules require certification are to be provided with the required certificates. For internal combustion engines with bores 300 mm (11.8 inches) or less, certification of the connecting rods is at the owner’s discretion unless the Surveyor has a concern about the source of the connecting rods based on the condition of the replacement parts. Refer to 7-1-1/9 and 7-1-1/11.

7.1.3 (1 July 2012) When deemed necessary by the Surveyor, testing as a result of damage, failure, deterioration or repair to the hull, machinery or equipment may be required. Tests are to be carried out in the presence of the Surveyor, and are to be in accordance with Section 3-7-1 of the Rules, as well as the Guide for Nondestructive Inspection of Hull Welds, where applicable.

7.3 Suspension of Classification

Failure to submit a damage, failure, deterioration or repair governed by 7-1-1/7.1.1 to a Surveyor for examination at first opportunity, or failure to notify ABS in advance of the repairs contemplated by 7-1-1/7.1.2, may result in suspension of the vessel’s classification from the date of arrival at the first port of call after the initial damage, failure, deterioration or repair until such time as the damage, failure or deterioration is repaired to the Surveyor’s satisfaction, or the repair is redone or evidence is submitted to satisfy the Surveyor that the repair was properly carried out.

7.5 Prompt and Thorough Repairs (1 July 2012)

Notwithstanding 7-1-1/7.1 and 7-1-1/7.3, any damage in association with wastage over the allowable limits (including buckling, detachment or fracture), or extensive areas of wastage over the allowable limits, which affects or may affect the vessel's structural, watertight or weathertight integrity, is to be promptly and thoroughly repaired. Areas to be considered include:

• Side shell frames, their end attachments and adjacent shell plating

• Deck structure and deck plating

• Bottom structure and bottom plating

• Inner bottom structure and inner bottom plating

• Watertight and oiltight bulkheads

• Hatch covers and hatch coamings, where fitted

• Weld connection between air pipes and deck plating

• Air pipe heads installed on the exposed decks

• Ventilators including closing devices, if any

• Bunker and vent piping systems

For double hull tankers and double skin bulk carriers subject to the Enhanced Survey Program, the following additional areas are to be considered:

• Side structure and side plating

• Inner side structure and inner side plating

• Longitudinal bulkhead(s) structure and longitudinal bulkhead(s) plating, where fitted

• Transverse watertight or oiltight bulkheads structure and transverse watertight or oiltight bulkheads plating

12 ABS RULES FOR SURVEY AFTER CONSTRUCTION . 2016

For locations where adequate repair facilities are not available, consideration may be given to allow the vessel to proceed directly to a repair facility. This may require discharging the cargo and/or temporary repairs for the intended voyage.

Additionally, when a survey results in the identification of structural defects or corrosion, either of which, in the opinion of the Surveyor, will impair the vessel’s fitness for continued service, remedial measures are to be implemented before the ship continues in service.

Wh…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.