RFP_Q_and_A_2.pdf
PDF 36 KB Posted
- Solicitation number
- N32205-16-T-4327
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_Q_and_A_6.pdf | ||
| Amendment_5.pdf | ||
| WORK_ITEM_PREP_GUIDE.pdf | ||
| Amendment_0004.pdf | ||
| RFP_Q_and_A_5.pdf | ||
| Amendment_0003.pdf | ||
| RFP_Q_and_A_4.pdf | ||
| Amendment_0002.pdf | ||
| RFP_Q_and_A_3.pdf | ||
| Amendment_0001.pdf | ||
| RFP_Q_and_A_1.pdf | ||
| PAST_PERFORMANCE_QUESTIONNAIRE_Attachment_2.pdf | ||
| PAST_PERFORMANCE_DATA_SHEET_Attachment_1.pdf | ||
| N32205-16-T-4327.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N32205-16-T-4327
QUESTIONS AND ANSWERS
The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.
QUESTION 1: May the offeror propose a water cooled system vice an air cooled system?
ANSWER:
Only proposals for systems that meet all the specified system requirements will be considered for award. MSC will not consider water cooled systems at this time.
QUESTION 2: Can you please clarify whether or not bidders are required to quote the cost of modifying the MCCS software? If bidders are required to quote this cost, can you provide any additional guidance of the software = requirements that should be flowed down to GE?
ANSWER:
No bidders are not required to quote the cost of modifying the MCCS software. MSC will use an existing contract with the Machinery Centralized Control System (MCCS) manufacturer to contract integration of the APAR system with MCCS.
QUESTION 3: RFP Section 3.4.1.22 states that Load Centers (LC04 & LC03) shall provide 50 Amp 480vac 3 phase power for the APAR system. Has an initial compressor and air handler been sized that draws under 50 Amps?
ANSWER:
No a initial compressor and air handler has not been sized.
QUESTION 4: Will buy American apply to materials and equipment?
ANSWER:
Yes it does apply.
QUESTION 5: Would there be a possibility of extending proposal due date beyond May 31 for perhaps 1-2 weeks?
ANSWER: Yes the solicitation will be extended 2 weeks via amendment.