RFP_Q_and_A_2.pdf

PDF 36 KB Posted

Attached to
Auxiliary Pre-Stage Area Refrigeration System for MSC T-AKE Class Vessels
Solicitation number
N32205-16-T-4327
Issued by

View the file

Other files

File Type Posted
RFP_Q_and_A_6.pdf PDF
Amendment_5.pdf PDF
WORK_ITEM_PREP_GUIDE.pdf PDF
Amendment_0004.pdf PDF
RFP_Q_and_A_5.pdf PDF
Amendment_0003.pdf PDF
RFP_Q_and_A_4.pdf PDF
Amendment_0002.pdf PDF
RFP_Q_and_A_3.pdf PDF
Amendment_0001.pdf PDF
RFP_Q_and_A_1.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE_Attachment_2.pdf PDF
PAST_PERFORMANCE_DATA_SHEET_Attachment_1.pdf PDF
N32205-16-T-4327.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-16-T-4327

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.

QUESTION 1: May the offeror propose a water cooled system vice an air cooled system?

ANSWER:

Only proposals for systems that meet all the specified system requirements will be considered for award. MSC will not consider water cooled systems at this time.

QUESTION 2: Can you please clarify whether or not bidders are required to quote the cost of modifying the MCCS software? If bidders are required to quote this cost, can you provide any additional guidance of the software = requirements that should be flowed down to GE?

ANSWER:

No bidders are not required to quote the cost of modifying the MCCS software. MSC will use an existing contract with the Machinery Centralized Control System (MCCS) manufacturer to contract integration of the APAR system with MCCS.

QUESTION 3: RFP Section 3.4.1.22 states that Load Centers (LC04 & LC03) shall provide 50 Amp 480vac 3 phase power for the APAR system. Has an initial compressor and air handler been sized that draws under 50 Amps?

ANSWER:

No a initial compressor and air handler has not been sized.

QUESTION 4: Will buy American apply to materials and equipment?

ANSWER:

Yes it does apply.

QUESTION 5: Would there be a possibility of extending proposal due date beyond May 31 for perhaps 1-2 weeks?

ANSWER: Yes the solicitation will be extended 2 weeks via amendment.