Amendment_0001.pdf

PDF 321 KB Posted

Attached to
Auxiliary Pre-Stage Area Refrigeration System for MSC T-AKE Class Vessels
Solicitation number
N32205-16-T-4327
Issued by

View the file

Other files

File Type Posted
RFP_Q_and_A_6.pdf PDF
Amendment_5.pdf PDF
WORK_ITEM_PREP_GUIDE.pdf PDF
Amendment_0004.pdf PDF
RFP_Q_and_A_5.pdf PDF
Amendment_0003.pdf PDF
RFP_Q_and_A_4.pdf PDF
Amendment_0002.pdf PDF
RFP_Q_and_A_3.pdf PDF
RFP_Q_and_A_2.pdf PDF
RFP_Q_and_A_1.pdf PDF
PAST_PERFORMANCE_QUESTIONNAIRE_Attachment_2.pdf PDF
PAST_PERFORMANCE_DATA_SHEET_Attachment_1.pdf PDF
N32205-16-T-4327.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N623876350N7001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Delete Reimburseable Travel CLIN & Provision and allow for submission of quote to add travel to each CLIN as a f irm-fixed price component of the quote for each CLIN. Quote should breakout the travel costs for each CLIN w / per diem, air ticket, car rental, etc.

2) Modify the SOW para 3.4.1.17, remove para 3.4.1.22 & 3.4.1.23.

3) Extend the Solicitation due date to 14 June 2016 @10am.

4) All other terms and conditions of the original solicitation and amendments issued to date remain unchanged and in full force and affect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N32205-16-T-4327

X 9B. DATED (SEE ITEM 11)

29-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-May-2016

CODE

MILITARY SEALIFT COMMAND NORFOLK

471 EAST C STREET, BLDG SP-64 NAVAL STATI

NORFOLK VA 23511

N32205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N32205-16-T-4327

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0013

The CLIN description has changed from Travel to DELETED.

The CLIN extended description has changed from Travel for entire contract to DELETED.

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

CLIN 0014

The CLIN extended description has changed from Deliverables for base and all options to Design

Deliverables for base and all options.

The following have been modified:

STATEMENT OF WORK

Performance Work Statement

1. BACKGROUND

Military Sealift Command (MSC) has a fleet wide initiative to reduce overall energy consumption by 15% by 2020 as well as support the MSC N7 goal of providing the most productive work environment for operating engineers. In order to reach this goal, significant savings can be found through the installation of stand-alone refrigeration systems to cool the four Freeze/Chill Pre-Staging Areas during low load cargo refrigeration scenarios.

2. SCOPE OF WORK

The Contractor shall provide any and all services and equipment to design, deliver, install, and commission a fully functional stand-alone Auxiliary Pre-Stage Area Refrigeration (APAR) system on twelve (12) T-AKE Class MSC ships. The Contractor shall visit and assess at least two (2) AKE class ship to verify equipment and space variations to support system design. Each individual system installation shall be performed within a 14 day repair availability, and all installs shall be completed within a 36 month period. Each install shall apply lessons learned from previous installs.

3. SPECIFIC TASKS

3.1. Pre-proposal Ship Assessment and Requirements Review: During the solicitation period, potential bidders will be provided with references 4 through 9, and will be permitted to visit and assess an AKE Class vessel in Norfolk, VA or Portland, OR. Upon request, an MSC representative will provide the GFI, and coordinate the ship visit with interested vendors. Ship visits will only be permitted during the following windows of availability:

East Coast Availability (Norfolk, VA): 4 -13 May

West Coast Availability (Portland, OR): 2 - 13 May

3.2. Kick-Off Meeting: The Contractor shall host a Kick-Off Meeting teleconference with the

Contracting Officer’s Representative (COR) and MSC Energy Conservation team within two (2) weeks of Contract award. The Contractor shall contact the COR and arrange a teleconference at a mutually agreeable time for the purpose of reviewing Contract requirements and the technical approach, and presenting a Plan of Action and Milestones (POA&M). The Contractor shall provide Kick-off meeting materials in PowerPoint or PDF format to the COR at least 24 hours prior to the Kick-off date. Additionally, the Contractor shall take meeting notes at the kick-off meeting and provide those to the Contracting Officer’s Representative (COR).

3.3. Ship Checks: The contractor shall coordinate with the COR, or a designated Government

Technical Point of Contact (TPOC) to conduct a ship check of two T-AKE Class ships during the design of the APAR system and within three (3) months of contract award. The specific ships and locations will be identified after award. Assume one trip to Norfolk, VA to and one trip to San Diego, CA. The contractor shall verify agreement with the provided Government

Furnished Information (GFI), perform any necessary cooling and ventilation measurements, and document differences between hulls.

3.4. System Design: The Contractor shall design an APAR system based on the requirements contained in this specification as well as any applicable requirements in the Government

Furnished Information (GFI) references and ship checks. Where any conflicts between this specification and the GFI references are perceived to exist, this specification should be assumed to be in force and the Contractor shall clarify the perceived discrepancy with the Government

TPOC. All design calculations shall be performed in accordance with Reference 4. Design conditions including ambient conditions, space volumes, and cooling and airflow requirements shall be taken from References 4 - 7. The Contractor shall be responsible for verifying the accuracy of all GFI to be used in the design of the APAR system. The design shall only consider equipment and components available Commercially Off The Shelf (COTS). A Design Review teleconference shall be held within three (3) months of contract award to review and discuss the proposed design.

3.4.1. System requirements:

3.4.1.1. The APAR system shall consist of two (2) identical direct-expansion type, air-cooled, Refrigeration Units with a combined nominal rating capable of meeting all the cooling requirements of the four (4) Freeze/Chill Pre-Staging Areas.

3.4.1.2. The system shall be segregated Port/Starboard, with Refrigeration Unit No.1 serving Freeze/Chill Pre-Staging Area No. 1 (1-59-1) and No. 3 (1-62.5-1), and

Refrigeration Unit No. 2 serving Freeze/Chill Pre-Staging Area No. 2 (1-59-2) and

No. 4 (1-62.5-2).

NOTE: The spaces are dual purpose Freeze and Chill, maintained at -9° F and at 33° to 36 ° F, respectively.

3.4.1.3. The nominal rating of each unit shall be capable of maintaining 120% of total volume of the two (2) spaces serviced at either Freeze or Chill conditions.

3.4.1.4. The APAR system shall be capable of maintaining the prescribed conditions with

AIR COOLER AC 1-59-1 & AC 1-59-2 (rated @ 8,475 CFM serving Pre-Staging

Area No. 1 & 2) and AIR COOLER AC 1-62-1 & AC 1-62-2 (rated @ 8,475 CFM serving Pre-Staging Area No. 3 & 4) secured.

3.4.1.5. The Refrigeration Units shall supply coolant to auxiliary air cooler units located in each Pre-Stage space.

3.4.1.6. Each independently controlled air cooler shall be sized with adequate cooling surface to avoid dehydration of the cargo.

3.4.1.7. Each air cooler shall have a fan for air circulation and be equipped with automatic defrosting capability.

3.4.1.8. Refrigeration Unit No. 1 & 2 shall be arranged in the Distributed Systems

Compartment No. 3A (S) 4-58-1 and No. 3A (P) 4-58-2 respectively.

3.4.1.9. The Refrigeration Units shall be arranged to minimize piping runs and provide the required maintenance and removal allowances for the units, and any existing equipment.

3.4.1.10. The coolant lines from the Refrigeration Unit to the respective air coolers shall have 3-way valves allowing for individual control of the coolant supply to each air cooler.

3.4.1.11. The APAR system shall be completely independent of the existing ship’s Cargo

Refrigeration System.

3.4.1.12. The ship shall have the capability to use either the existing Cargo Refrigeration

System or the APAR system to condition the Freeze/Chill Pre-Staging Areas.

3.4.1.13. The Refrigeration Units shall be air-cooled and capable of continuous full-load operation with existing HVAC systems secured.

3.4.1.14. If a design is proposed that adds to the heat load of a space, calculations must be provided to verify that the affected space can be maintained within operational limits without modifications to existing HVAC equipment.

3.4.1.15. The APAR system shall be controlled locally and be designed for automated operation allowing for flexible settings.

3.4.1.16. The automated control shall allow manual start and adjustment of the equipment.

3.4.1.17. The system shall monitor the temperature within the pre-staging areas by 4 -20 mA resistance temperature detectors (RTDs), and shall have summary dry contact output for alarm monitoring.

3.4.1.18. The control system shall be capable of preventing system damage by automatically securing operation in the event system parameters fall outside specified limits.

3.4.1.19. In the event of a shutdown the control system shall indicate the cause of the shutdown.

3.4.1.20. Control of the APAR system shall be independent of the existing ship’s

HVAC&R control systems.

3.4.1.21. Local temperature control shall be provided immediately adjacent to each space.

Load Centers (LC04) located in port side compartment 2-38-1 (Electrical Substation) and

(LC03) located in starboard compartment 2-38-2 (Electrical Substation), shall provide 50Amp, 480Vac, 3ph, 60Hz power for the APAR system.

Refrigeration Unit, Evaporator Coil, and supplying Load Center nomenclature and layout shall be as follows:

Location Refrigeration Unit Evaporator

Coil

Load

Center

Freeze/Chill Pre-

Staging Area No. 1

Auxiliary Pre-Stage Refrigeration

Unit No. 1 (Starboard) Coil No. 1 LC03

Freeze/Chill Pre-

Staging Area No. 2

Auxiliary Pre-Stage Refrigeration

Unit No. 2 (Port) Coil No. 2 LC04

Freeze/Chill Pre-

Staging Area No. 3

Auxiliary Pre-Stage Refrigeration

Unit No. 1 (Starboard) Coil No. 3 LC03

Freeze/Chill Pre-

Staging Area No. 4

Auxiliary Pre-Stage Refrigeration

Unit No. 2 (Port) Coil No. 4 LC04

3.4.1.22. The complete APAR system shall be warrantied by the manufacturer for a period of one year, after successful completion of the acceptance test, for each ship installation.

3.4.2. Design Deliverables: The contractor shall develop a complete work package for all 12 T-

AKE ships, with indications of differences between hulls in the corresponding locations on the drawings and in the documents. The following deliverables are the components of a complete work package.

3.4.2.1. Modification Drawings (ABS Approved): The Contractor shall develop modification drawings that detail all structural, electrical, and mechanical modifications onboard the T-AKE Class ships. The modification drawings should show all removals, relocations, and installations. Drawings shall be developed in accordance with Preparation of Computer Aided Design (CAD) Drawings for USNS

Ships (Reference 2).

NOTE: MSC will submit drawings to ABS under an existing ABS contract, and will fund ABS drawing approvals.

The following modification drawing deliverables shall be submitted to the COR within four (4) months of contract award:

A. Electrical Modifications Drawing

B. Structural Modifications Drawing

C. Mechanical Modifications Drawing

D. ABS Required Calculations

E. Equipment Cut Sheets (as required by ABS)

3.4.2.2. Inspection and Test Plan: The Contractor shall furnish an Operational Test Plan before the installation that details the test procedures to be used to ensure the system is fully operational and compliant with specifications in all modes of operation. General testing methods and procedures shall be in accordance with the MSC General

Technical Requirements (reference 3). The test plan shall consider the anticipated conditions at the time of commissioning, and be able to demonstrate how the test results obtained correlate to the expected results.

3.4.3. Installation Requirements: Utilizing the work packages developed under the Base Period, the

Contractor shall install the APAR system on each of twelve (12) T-AKE Class ships.

3.4.3.1. The Contractor shall provide all labor, material, and equipment required to perform installation of a fully functional system meeting the requirements identified in section 3.4 on each vessel.

NOTE: Long term storage of parts and materials can be supported in warehouses at the following addresses.

N32205

MSC BLDG W-143 DWY 10

1968 GILBERT STREET

NORFOLK, VA 23511

MSC BATS WAREHOUSE

9284 BALBOA AVE

SAN DIEGO, CA 92123

N40446

MSC SSU GUAM, N4

BLDG. 3110/K-1 SPAN, US NAVAL BASE

SANTA RITA, GUAM 96915

3.4.3.2. The installation and testing shall be performed during a shipyard availability lasting no less than fourteen (14) days.

3.4.3.3. The Contractor shall work within the rules of the shipyard and not interfere with other work.

3.4.3.4. Testing shall be in accordance with the Test Plan developed and approved under section

3.4.2.2.

3.4.3.5. The execution of the test plan shall be witnessed by the MSC Rep onsite and the final test report shall be submitted to COR for review and approval.

3.4.3.6. The final test report shall include all recorded data and an assessment of that data, and will be signed by the COR and Contractor’s Reps.

3.4.3.7. ABS Approval of Installation Contractor shall ensure that ABS witnesses testing and perform inspections as required by ABS Steel Vessel Rules (SVR).

3.4.3.8. ABS attendance and approval/disapproval shall be documented via shipyard condition report or other alternative means that is agreed to by both COR and the

Contractor.

3.4.3.9. Any component failing to perform its function as specified and documented shall be repaired or replaced by the Contractor at no additional cost to the Government.

3.4.3.10. Items repaired or replaced shall be warrantied for an additional period of at least one year from the date that it becomes functional again.

3.4.4. Schedule: The Contractor shall work with the Government TPOC and the respective shipyard to develop and provide a Plan of Action and Milestones (POA&M) that outlines the installation schedule. Installation of the APAR systems on all T-AKE vessels shall be completed within 36 months after contract award. The contractor shall work with the TPOC to identify ship availabilities.

Schedule milestones include:

Table 1: Milestone Schedule

MILESTONE DUE DATE

Pre-proposal Ship Visit 2 – 14 May 2016

Kick-off Meeting Teleconference Within two (2) weeks of contract award

Ship Visits Within three (3) months of contract award

Design Review Teleconference Within three (3) months of contract award

APAR System Install As required, but completed on 12 ships with 36 months

3.4.5. Support Requirements: The contractor shall provide the following support:

3.4.5.1. Training: The Contractor shall provide all necessary training for the operation of the APAR systems to ship’s personnel on-site at the ship at each ship installation.

3.4.5.2. Maintenance Support: During the warranty period, the Contractor shall provide onsite maintenance services within a 48 hour window for all parts, labor, and material for both hardware and software. The provisions of this section are not in lieu of, nor relieve the Contractor of, warranty responsibilities. If the result of the service request is the discovery of a system defect covered under the warranty provisions, all costs for the call, including the labor necessary to identify the defect, shall be the responsibility of the Contractor.

3.4.5.3. Logistics Support Documents: The Contractor shall provide/update the following Logistics Support documents:

Documents A-F shall be in accordance with reference 10.

A. Technical Manual: Reference document describing safety precautions, theory of operation, preparation for use, operating instruction, maintenance instructions, parts list data, design calculations, system detail design, and installation drawings.

B. Technical Support Data (TSD): Documentation consisting of a bill of materials/list of all repair parts, assemblies and subassemblies, special tools and test equipment required to maintain, repair or overhaul the equipment/components as specified by an illustrated parts breakdown

C. Repair Parts Support: A pre-priced recommended list of spare parts with delivery of equipment sufficient in range and depth to provide one year of preventive maintenance and 10 years of corrective maintenance support for the APAR systems.

The OEM part number shall not be relabeled with a different part number.

D. Purchase Orders: Copies of all purchase orders for contractor-furnished materials and equipment

E. Provisioning Item Order (PIO) for Supplies (Spare Parts): Proposal for the fixed price and delivery schedule for each item on the repair parts lists

F. Automation Programming: Instructions Instruction for ship operators to modify

ASD programming/automation control parameters

G. System and subsystem warranties: Documents from contractor stating the details of the APAR system warranty, and documents from subsystem components origination from the equipment manufacturers

4. Government Furnished Information (GFI)/References

1. USNS WILLIAM MCLEAN (T-AKE 12) Pre-Stage Refrigeration System Technical Review Report April

3, 2015

2. Military Sealift Command Computer Aided Designed (CAD) Drawing Standard MSC Drawing Number

803-7080803

3. MSC General Technical Requirements (GTR) COMSCINST 4700.16

4. NAVSEA DWG NO 512-7488757_D - HVAC DESIGN CRITERIA MANUAL

5. NAVSEA DWG NO. 512-7488758_D - HEATING & COOLING CALCULATIONS CARGO HOLDS &

ANCILLARY SPACES

6. NAVSEA DWG No. 516-7488756 - CARGO REFRIGERATION SECONDARY COOLANT

CIRCULATION SYSTEM DIAGRAM

7. NAVSEA DWG NO 512-7488981 - HEATING AND COOLING CALCULATIONS CHILL – FREEZE

CARGO HOLDS AND ANCILLARY SPACES

8. MSC DWG NO 8499066 - ELECTRICAL SYSTEM ONE LINE DIAGRAM

9. NAVSEA DWG NO 802-7488866 Rev U - SRD GENERAL ARRANGEMENT

10. MSC’s C3 Logistics Support Requirements

11. Programmable Logic Controller (PLC) Design Standards - N0731-330.00-AQ

12. T-AKE 1 Class Ship’s Index Drawings List

13. Manual No. T9AKE-AJ-MAN-010/AKE-9 - ENGINEER’S OPERATING MANUAL FOR USNS

MATTHEW PERRY (T-AKE 9)PROPULSION AND AUXILIARY MACHINERY GENERAL

INFORMATION AND SYSTEM OPERATING INSTRUCTIONS

5. Shipment/Delivery Instructions

5.1. The Contractor shall prepare all shipments under orders in accordance with ASTM-D-3951-10

“Standard Practice for Commercial Packaging, Preservation, Packaging, Packing and Marking” of all deliverable contract line items and must ensure the material is received in a serviceable, ready for issue condition when received at the ultimate destination.

5.2. All shipments using coniferous and non-coniferous wood pallets, skids, load boards, pallet collars, boxes, reels, dunnage, crates, frames and cleats constructed of non-manufactured wood shall be constructed from Heat Treated (HT to 56 Centigrade for 30 minutes) or fumigated

(using methyl bromide) material and certified by an accredited agency recognized by the

American Lumber Standards Committee (ALSC) in accordance with Wood Packaging Material

Regulations both dated 13 November 2009.

5.3. The delivery location will be provided with each option exercise; see tentative install schedule.

6. PERIOD OF PERFORMANCE

36 Months

7. CONTRACT TYPE

This will be a Firm Fixed Price contract

8. DELIVERABLES

8.1. Kick-off Meeting Materials (PowerPoint or PDF), as specified in section 3.2, shall be delivered 24 hours prior to Kick-off date.

8.2. Kick-off Meeting Minutes, as described in section 3.2, shall be delivered within one (1) week of Kick-off meeting.

8.3. Design Review Materials (PowerPoint or PDF), as specified in section 3.4, shall be delivered 24 hours prior to the Design Review Teleconference.

8.4. Modification Drawings, as described in section 3.4.2.1, shall be delivered within four (4) months of contract award.

8.5. Inspection and Test Plan, as described in section 3.4.2.2, shall be delivered two (2) weeks prior to any installation.

8.6. Test Report, as specified in section 3.4.3.6, shall be delivered within two (2) weeks of any completed install.

8.7. Logistic Support Documents, as described in section 3.4.5.3, shall be delivered within two (2) weeks of any completed install.

9. CONTRACTING OFFICER’S REPRESENTATIVE (COR) DESIGNATION

The person named below is the COR for this Contract:

NAME:

CODE:

PHONE: To be provided upon award

MOBILE:

EMAIL:

The COR will represent the Contracting Officer in the administration of technical details within the scope of this contract and will perform inspection and acceptance of all deliverables. The COR is not otherwise authorized to make any representations or commitments of any kind on behalf of the Contracting Officer or the

Government. The COR does not have the authority to alter the Contractor's obligations or change the specifications in the contract or issue Delivery Orders. If, as a result of technical discussions, it is desirable to alter contract obligations or statements of work, a modification must be issued in writing and signed by the

Contracting Officer. The COR is responsible for reviewing the invoices submitted by the Contractor and informing the Contracting Officer of areas where exceptions are to be taken. The COR authority is nondelegable. The COR may be personally liable for unauthorized acts.

Tentative Install Schedule for the Auxiliary Pre-stage Area Refrigeration System Sequence Hull Vessel Name Install Date Availability Type Availability Range Location

1 T-AKE 5 ROBERT E. PEARY November-16 MRT 11/8/2016 - 12/5/2016 Norfolk

2 T-AKE 7 CARL BRASHEAR December-16 ROH / DD (MSC) 12/21/2016 - 2/16/2017 San Diego

3 T-AKE 13 MEDGAR EVERS February-17 ROH (MSC) 2/23/2017 - 4/23/2017 Norfolk

4 T-AKE 11

WASHINGTON

CHAMBERS

March-17 MTA (MSC) 3/21/2017 - 4/17/2017 Guam

5 T-AKE 9 MATTHEW PERRY April-17 ROH / DD (MSC) 4/18/2017 - 6/1/2017 San Diego

6 T-AKE 3 ALAN SHEPARD April-17 ROH / DD (MSC) 4/9/2017 - 6/24/2017 San Diego

7 T-AKE 6 AMELIA EARHART June-17 MTA (MSC) 6/6/2017 - 7/3/2017 Guam

8 T-AKE 14 CESAR CHAVEZ July-17 ROH / DD (MSC) 7/1/2017 - 9/15/2017 San Diego

9 T-AKE 4 RICHARD E. BYRD October-17 ROH / DD (MSC) 10/1/2017 - 12/15/2018 San Diego

10 T-AKE 12 WILLIAM MCLEAN October-17 MTA (MSC) 10/16/2017 - 11/12/2017 Norfolk

11 T-AKE 8 WALLY SCHIRRA June-18 MTA (MSC) 6/26/2018 - 7/23/2018 San Diego

12 T-AKE 10 CHARLES DREW June-18 ROH / DD (MSC) 6/1/2018 - 7/16/2018 San Diego

Performance Location and Period of Performance dates provided are best known locations and dates at time of submission of these requirements and are subject to change. A condition report shall be submitted to the Port Engineer and Contracting Officer requesting modification of the contract due to travel costs.

(End of Summary of Changes)