RFP-RFQ_Q_and_A_6.docx

DOCX document 26 KB Posted

Attached to
USNS SPEARHEAD (T-EPF 1) Emergency Dry-Docking Federal contract opportunity
Solicitation number
N32205-16-R-4506
Issued by
Department of the Navy Military Sealift Command

View the file

Other files for this federal contract opportunity

Other files attached to USNS SPEARHEAD (T-EPF 1) Emergency Dry-Docking, newest first.
File Type Posted
RFP-RFQ_Q_and_A_9.docx DOCX document
RFP-RFQ_Q_and_A_8.docx DOCX document
RFP-RFQ_Q_and_A_7.docx DOCX document
RFP-RFQ_Q_and_A_5.docx DOCX document
RFP-RFQ_Q_and_A_3.docx DOCX document
RFP-RFQ_Q_and_A_2.docx DOCX document
RFP-RFQ_Q_and_A_4.docx DOCX document
RFP-RFQ_Q_and_A_1.docx DOCX document
N32205-16-R-4506-0001.doc DOC document
JA_for_USNS_SPEARHEAD_EDD_6-22-2016.pdf PDF
USNS_SPEARHEAD_Dimensions.docx DOCX document
SPHD_EDD_Sources_Sought.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-16-R-4506

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.

NAME OF CONTRACTOR: _______________________

SPECIFICATION ITEM NO.: __General________

PARAGRAPH / SECTION NO:___N/A_________________

TITLE: _Regarding Stern Ramp__________________________________________

QUESTION:

In what position does the Government expect the stern ramp to be while the ship is in dry-dock? For example, will the contractor be able to request up or down as needed?

ANSWER:

The stern ramp is capable of movement while in dry dock however the contractor will be required to provide auxiliary cooling water to the hydraulic system. Movement on the stern ramp shall be limited to pedestal and inner ramp movement and shall not include extension of the outer ramp. The stern ramp shall only be temporarily moved and the only personnel authorized to move the stern ramp is ships force.