RFP-RFQ_Q_and_A_4.docx
DOCX document 26 KB Posted
- Attached to
- USNS SPEARHEAD (T-EPF 1) Emergency Dry-Docking Federal contract opportunity
- Solicitation number
- N32205-16-R-4506
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFP-RFQ_Q_and_A_9.docx | DOCX document | |
| RFP-RFQ_Q_and_A_8.docx | DOCX document | |
| RFP-RFQ_Q_and_A_7.docx | DOCX document | |
| RFP-RFQ_Q_and_A_6.docx | DOCX document | |
| RFP-RFQ_Q_and_A_5.docx | DOCX document | |
| RFP-RFQ_Q_and_A_3.docx | DOCX document | |
| RFP-RFQ_Q_and_A_2.docx | DOCX document | |
| RFP-RFQ_Q_and_A_1.docx | DOCX document | |
| N32205-16-R-4506-0001.doc | DOC document | |
| JA_for_USNS_SPEARHEAD_EDD_6-22-2016.pdf | ||
| USNS_SPEARHEAD_Dimensions.docx | DOCX document | |
| SPHD_EDD_Sources_Sought.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY SEALIFT COMMAND
N32205-16-R-4506
QUESTIONS AND ANSWERS
The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.
NAME OF CONTRACTOR: _______________________
PARAGRAPH / SECTION NO:____2.1.4 & 2.1.5
TITLE: Dry-Docking and Undocking Vessel
Question No. 1:
Can the requirements per 2.1.4 and 2.1.5 be waived if the Contractor can provide the Govenrnment with a Dry-Dock complying with Heger Dry Dock Certficate of Capacity?
BACKGROUND STATEMENT:
Section C - Descriptions and Specifications – C.3.(b) - (Page 6 of 70)
1. The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/off ship production and component/system testing and trials. The contractor shall provide industry certifications such as, Master Ship Repair Agreement (MSRA), Agreement for Boat Repair (ABR), or International Organization for Standardization (ISO) Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate the prospective contractor's ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractors proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award: To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate the prospective contractor’s ability to obtain required resources.
This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award.
The contractors proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm’s eligibility for contract award:
ANSWER:
Potential contractor’s Heger certification is an acceptable industry certification. Contractor is still required to submit dock specifications along with any plans to either deviate from the docking plan provided or provide a loading plan to distribute the keel block loads to the dock structure. NOTE: EPF class vessels do not have centerline keel blocks. Keel blocks are located along each demihull.