RFP-RFQ_Q_and_A_2.docx

DOCX document 25 KB Posted

Attached to
USNS SPEARHEAD (T-EPF 1) Emergency Dry-Docking Federal contract opportunity
Solicitation number
N32205-16-R-4506
Issued by
Department of the Navy Military Sealift Command

View the file

Other files for this federal contract opportunity

Other files attached to USNS SPEARHEAD (T-EPF 1) Emergency Dry-Docking, newest first.
File Type Posted
RFP-RFQ_Q_and_A_8.docx DOCX document
RFP-RFQ_Q_and_A_9.docx DOCX document
RFP-RFQ_Q_and_A_5.docx DOCX document
RFP-RFQ_Q_and_A_7.docx DOCX document
RFP-RFQ_Q_and_A_6.docx DOCX document
RFP-RFQ_Q_and_A_4.docx DOCX document
RFP-RFQ_Q_and_A_1.docx DOCX document
RFP-RFQ_Q_and_A_3.docx DOCX document
N32205-16-R-4506-0001.doc DOC document
JA_for_USNS_SPEARHEAD_EDD_6-22-2016.pdf PDF
USNS_SPEARHEAD_Dimensions.docx DOCX document
SPHD_EDD_Sources_Sought.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-16-R-4506

QUESTIONS AND ANSWERS

The following are answers to questions received from potential offerors. The answers provide clarification only and do not constitute an amendment to the solicitation.

NAME OF CONTRACTOR: _______________________

SPECIFICATION ITEM NO.: __0901 – Dry-Docking and Undocking Vessel________

PARAGRAPH / SECTION NO:___7.1.1_________________

TITLE: _Arrangement/Outfitting___________________________________________________

QUESTION:

The work item states that the Contractor shall provide a single section steel or concrete floating dock, marine railway or graving dock certified in accordance with Reference 2.1.5. Offeror has a steel floating dock that is comprised of six (6) sections of structural grade steel with a lift capacity of 40,000LT. It is ABS certified. Will the Government waive the requirement for a single section dock?

ANSWER:

Floating docks comprised of sections will be considered and evaluated on a case by case basis using the contractor provided specifics of the dock. Contractor shall submit the dock qualifications in accordance with the original solicitation.