J_-_2_Category_A_Items.xls
XLS spreadsheet 63 KB Posted
- Attached to
- USNS WALLY SCHIRRA (T-AKE 8): ROH/DD
- Solicitation number
- N32205-16-R-4307
About this file
Revised J-2
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | ||
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | Intent, Scope, General Conditions and Definitions | - 0 | $ - 0 | $0 | ||||||||
| 002 | Technical and Manufacturer's Representative | - 0 | $ - 0 | $0 | ||||||||
| 003 | Approach, Berth, and Mooring Requirements | - 0 | $ - 0 | $0 | ||||||||
| 004 | Testing and Quality Assurance | - 0 | $ - 0 | $0 | ||||||||
| 005 | Electrical Safety Procedure Requirements | - 0 | $ - 0 | $0 | ||||||||
| 006 | Heavy Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 007 | Cold Weather Plan | - 0 | $ - 0 | $0 | ||||||||
| 010 | Furnish Office for OMT | - 0 | $ - 0 | $0 | ||||||||
| 011 | Furnish General Services | - 0 | $ - 0 | $0 | ||||||||
| 012 | Telephone Services | - 0 | $ - 0 | $0 | ||||||||
| 013 | Project Planning and Production Status | - 0 | $ - 0 | $0 | ||||||||
| 014 | Preparation of Weight and Moment Report | - 0 | $ - 0 | $0 | ||||||||
| 015 | Integrated Logistics and GFM Support Requirements | - 0 | $ - 0 | $0 | ||||||||
| 016 | Fire Protection and Ship's Safety Program | - 0 | $ - 0 | $0 | ||||||||
| 017 | Handling Ships Stores | - 0 | $ - 0 | $0 | ||||||||
| 018 | Delivery and Re-Delivery | - 0 | $ - 0 | $0 | ||||||||
| 019 | Shipboard Access and Security | - 0 | $ - 0 | $0 | ||||||||
| 020 | Gas Free Certificates | - 0 | $ - 0 | $0 | ||||||||
| 021 | Clean and Gas Free Tanks, Voids, Cofferdams and Spaces | - 0 | $ - 0 | $0 | ||||||||
| 022 | Dock Trials and Sea Trial | - 0 | $ - 0 | $0 | ||||||||
| 023 | Hazardous Waste Disposal | - 0 | $ - 0 | $0 | ||||||||
| 024 | Physical Security at Private Contractor's Facility | - 0 | $ - 0 | $0 | ||||||||
| 100 | HULL STRUCTURE | |||||||||||
| 102 | Station 3, 4, 5, 6 Containment Drains TALT274 | - 0 | $ - 0 | $0 | ||||||||
| 103 | Stack Repair | - 0 | $ - 0 | $0 | ||||||||
| 200 | MACHINERY, PROPULSION | |||||||||||
| 201 | MDG Splash Oil and Test Circuit MOD T-ALT 381 | - 0 | $ - 0 | $0 | ||||||||
| 202 | FME/MAN Annual Automation Testing | - 0 | $ - 0 | $0 | ||||||||
| 203 | No1 MDG Oil Pump Drive Gear Inspection | - 0 | $ - 0 | $0 | ||||||||
| 300 | ELECTRICAL | |||||||||||
| 301 | Installation of General Alarm Contact Maker | - 0 | $ - 0 | $0 | ||||||||
| 302 | Sulfur Dioxide Detection System Installation (T-ALT 404) | - 0 | $ - 0 | $0 | ||||||||
| 303 | SO2 Sensor Calibration Commissioning Certification | - 0 | $ - 0 | $0 | ||||||||
| 304 | Cargo Holds 1-6 Lighting Switch Installation (TALT-246) | - 0 | $ - 0 | $0 | ||||||||
| 305 | Main Generator Maintenance and Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 306 | HV-SS and Emergency Switchboard Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 307 | Shipyard Support for UPS Replacement | - 0 | $ - 0 | $0 | ||||||||
| 308 | PLC and UPS Survey | - 0 | $ - 0 | $0 | ||||||||
| 309 | Thermographic Survey | - 0 | $ - 0 | $0 | ||||||||
| 400 | COMMUNICATION AND NAVIGATIONAL AIDS | |||||||||||
| 401 | Echo Depth Sounder Preventative Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 402 | OE-570 Antenna System Preventive Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 403 | Doppler Preventive Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 404 | Antenna Preservation | - 0 | $ - 0 | $0 | ||||||||
| 405 | GMDSS & VDR Certification Annual Inspection | - 0 | $ - 0 | $0 | ||||||||
| 500 | MACHINERY, AUXILIARY SYSTEMS | |||||||||||
| 501 | No. 1 Fire Sprinkler Pump Mechanical Seal Repairs | - 0 | $ - 0 | $0 | ||||||||
| 503 | AFFF Bilge Sprinkler System Piping Replacement | - 0 | $ - 0 | $0 | ||||||||
| 504 | HTFW Cooler Cleaning and Gasket Change TALT 426 | - 0 | $ - 0 | $0 | ||||||||
| 505 | LTFW Cooler Cleaning & Gasket Change (TALT 426) | - 0 | $ - 0 | $0 | ||||||||
| 506 | Distilling Plant 2.5 Year Maintenance | - 0 | $ - 0 | $0 | ||||||||
| 507 | LTFW SW Discharge Valve Replacement | - 0 | $ - 0 | $0 | ||||||||
| 508 | Relief Valves Testing | - 0 | $ - 0 | $0 | ||||||||
| 509 | Industrial Services for SaWs TALT439 | - 0 | $ - 0 | $0 | ||||||||
| 510 | Oily Water Separator Inspect and Groom | - 0 | $ - 0 | $0 | ||||||||
| 511 | Annuals Anchor Windlass Mooring Winches | - 0 | $ - 0 | $0 | ||||||||
| 512 | DG Annual Training | - 0 | $ - 0 | $0 | ||||||||
| 513 | Incinerator Annual Recertification | - 0 | $ - 0 | $0 | ||||||||
| 514 | Appleton Marine Cargo Cranes Insepct Services | - 0 | $ - 0 | $0 | ||||||||
| 515 | Chlorpoac Piping Repairs | - 0 | $ - 0 | $0 | ||||||||
| 600 | OUTFIT, FURNISHINGS AND HABITABILITY | |||||||||||
| 601 | VCHT Tank Coating | - 0 | $ - 0 | $0 | ||||||||
| 602 | Officers Duty Crew & CPO Mess Stratica Deck Covering | - 0 | $ - 0 | $0 | ||||||||
| 603 | Blast and Coat Food Waste Tank | - 0 | $ - 0 | $0 | ||||||||
| 604 | Fassmer Lifeboat RHIB Davits Accom Ladder Annual Inspection | - 0 | $ - 0 | $0 | ||||||||
| 605 | Liferaft Annual Certification | - 0 | $ - 0 | $0 | ||||||||
| 606 | SCBA Recertification | - 0 | $ - 0 | $0 | ||||||||
| 607 | Galley Equipement Calibration | - 0 | $ - 0 | $0 | ||||||||
| 608 | Annual Firefighting Inspection | - 0 | $ - 0 | $0 | ||||||||
| 609 | Life Boat Gel Coat Preservation | - 0 | $ - 0 | $0 | ||||||||
| 610 | RHIB Boat Gel Coat Preservation | - 0 | $ - 0 | $0 | ||||||||
| 611 | Shower Stalls & Head Deck resurface | - 0 | $ - 0 | $0 | ||||||||
| 800 | HEATING, VENTILATION, AND AIR CONDITIONING | |||||||||||
| 801 | Galley Exhaust Duct Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 802 | Laundry Exhaust Duct Cleaning | - 0 | $ - 0 | $0 | ||||||||
| 900 | DRY-DOCKING | |||||||||||
| 901 | Dry-Docking and Undocking | - 0 | $ - 0 | $0 | ||||||||
| Haul Days | - 0 | $ - 0 | $0 | |||||||||
| Lay Days | - 0 | $ - 0 | $0 | |||||||||
| 902 | Polish Bow Thruster Propeller and Trash Bar Repair | - 0 | $ - 0 | $0 | ||||||||
| 903 | Propeller Shaft and Stern Tube Inspection | - 0 | $ - 0 | $0 | ||||||||
| 904 | FWD and AFT Stern Tube Seal Inspection and Overhaul | - 0 | $ - 0 | $0 | ||||||||
| 905 | Zinc Renewal Seachests | - 0 | $ - 0 | $0 | ||||||||
| 906 | Range Paint Ground Tackle | - 0 | $ - 0 | $0 | ||||||||
| 907 | Underwater Hull Cleaning & Painting | - 0 | $ - 0 | $0 | ||||||||
| 908 | Freeboard Cleaning & Painting | - 0 | $ - 0 | $0 | ||||||||
| 909 | Sea Valve Replacements | - 0 | $ - 0 | $0 | ||||||||
| 911 | Bilge Keels Repairs | - 0 | $ - 0 | $0 | ||||||||
| 912 | Inspect and Repair Cathodic Protection | - 0 | $ - 0 | $0 | ||||||||
| 1000 | UNREP GEAR | |||||||||||
| 1001 | Renew Flight Deck Nonskid | - 0 | $ - 0 | $0 | ||||||||
| 1002 | Fueling At Sea Saddle Winch Fairlead Block Refurbishment Station No 3, No 4 | - 0 | $ - 0 | $0 | ||||||||
| 1003 | Fueling At Sea Saddle Winch Fairlead Block Grease Line Fabric. Install Stations No 3 No 4 | - 0 | $ - 0 | $0 | ||||||||
| 1004 | Hauling Winch Lebus Spooling Bushing Refurbishment Replace St No 1, No 2, No 6, No 8 | - 0 | $ - 0 | $0 | ||||||||
| 1005 | Ram Tensioner Refurbishment | - 0 | $ - 0 | $0 | ||||||||
| TOTAL CAT "A" | $0.00 |
&LUSNS WALLY SCHIRRA(T-AKE 8)&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS&RN32205-16-R-4307
&CATTACHMENT J-2
File details come from the government source that posted it. Updated .