0910_B_Dry_Docking_and_Undocking_Vessel.doc

DOC document 35 KB Posted

Attached to
USNS WALLY SCHIRRA (T-AKE 8): ROH/DD
Solicitation number
N32205-16-R-4307
Issued by

About this file

Revised work item 910

View the file

Other files

File Type Posted
N32205-16-R-4307_Amendment_0004.doc DOC document
Work_Item_516_and_Ref.zip ZIP file
J-2_and_J-3.zip ZIP file
406_A_Communication_Suite_Groom.docx DOCX document
Work_Item_406_Ref.zip ZIP file
Q_AND_A_Responses_3.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
Q_AND_A_Responses_2.docx DOCX document
Q_AND_A_Responses_1.docx DOCX document
Work_Item_506_Recefernce_2.2.pdf PDF
1005_A__Ram_Tensioners_Remove_and_Replace_REV_1.doc DOC document
204_A_Propulsion_Motor_and_Cooler_Cleaning_Inspection_Maintenance.doc DOC document
N32205-16-R-4307_Amendment_00003.doc DOC document
Work_Item_506_Reference_2.1.pdf PDF
Work_Item_204_T9235-AG-MMC-010_Propulsion_Motor.pdf PDF
Amendment_0002_Work_Items_and_referances.zip ZIP file
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_2_Category_A_Items.xls XLS spreadsheet
N32205-16-R-4307_Amendment_00001.doc DOC document
J-6.zip ZIP file
J_Attachments_2-12.zip ZIP file
FBO_J-A-N32205-16-R-4307_ROH-DD_USNS_WALLY_SCHIRRA_(T-AKE_8).doc DOC document
N32205-16-R-4307.doc DOC document
609_LifeBoat_Gel_Coat_Preservation_(3).doc DOC document
610_A_RHIB_Boat_Gel_Coat_Preservation.doc DOC document
N32205-16-R-4307_Non-Disclosure_Agreement.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS WALLY SCHIRRA

(T-AKE 8)

900-DRYDOCKING AND UNDOCKING

N33205-16-R-0000

03 JANUARY 2016

ITEM NO. 0910

CATEGORY "B"

MSC PM6/SA/NMK

DRY-DOCKING AND UNDOCKING VESSEL

1.0 ABSTRACT:

1.1 Continue dry-docking ship past the scheduled Contract Completion Date.

2.0 REFERENCES:

2.1 Work Item 901, Dry-Docking and Undocking Vessel.

3.0 ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity/ Description: In accordance with reference 2.1 (WI 901 Dry-Docking and Undocking Vessel).

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.

5.0 NOTES:

5.1 The Contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7 and 29.

5.2 The Contractor and all subcontractors, regardless of tier, are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.

7.0 STATEMENT OF WORK REQUIRED:

7.1 Arrangements and Outfitting:

7.1.1 Submit a unit price per day and extended price for up to a maximum of five (5) days to continue all services in accordance with Work Item 901.

7.2 Structural: None Additional.

7.3 Mechanical/Fluids: None Additional.

7.4 Electrical: None Additional.

7.5 Electronics: None Additional.

7.6 Preparation of Documents/Documents: None Additional.

7.7 Inspection/Test: None Additional.

7.8 Painting: None Additional.

7.9 Marking: None Additional.

7.10 Manufacturer’s Representative: None Additional.

8.0 GENERAL REQUIREMENTS:

8.1 If this CAT B Work Item is invoked, the work requirements in this work item shall be finalized and/or completed as required for meeting scheduled milestones as outlined in Work Item 013 “Project Planning and Production Status Monitoring Reports”, paragraph 7.1.7 “Milestones”.

8.2 Offers must provide both a unit price and an extended total price for accomplishing the above paragraph 7 scope of work.

0910 - 2