1005_A__Ram_Tensioners_Remove_and_Replace_REV_1.doc

DOC document 91 KB Posted

Attached to
USNS WALLY SCHIRRA (T-AKE 8): ROH/DD
Solicitation number
N32205-16-R-4307
Issued by

About this file

Revised work item 1005

View the file

Other files

File Type Posted
N32205-16-R-4307_Amendment_0004.doc DOC document
Work_Item_516_and_Ref.zip ZIP file
0910_B_Dry_Docking_and_Undocking_Vessel.doc DOC document
J-2_and_J-3.zip ZIP file
406_A_Communication_Suite_Groom.docx DOCX document
Work_Item_406_Ref.zip ZIP file
Q_AND_A_Responses_3.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
Q_AND_A_Responses_2.docx DOCX document
Q_AND_A_Responses_1.docx DOCX document
Work_Item_506_Recefernce_2.2.pdf PDF
204_A_Propulsion_Motor_and_Cooler_Cleaning_Inspection_Maintenance.doc DOC document
N32205-16-R-4307_Amendment_00003.doc DOC document
Work_Item_506_Reference_2.1.pdf PDF
Work_Item_204_T9235-AG-MMC-010_Propulsion_Motor.pdf PDF
Amendment_0002_Work_Items_and_referances.zip ZIP file
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_2_Category_A_Items.xls XLS spreadsheet
N32205-16-R-4307_Amendment_00001.doc DOC document
J-6.zip ZIP file
J_Attachments_2-12.zip ZIP file
FBO_J-A-N32205-16-R-4307_ROH-DD_USNS_WALLY_SCHIRRA_(T-AKE_8).doc DOC document
N32205-16-R-4307.doc DOC document
609_LifeBoat_Gel_Coat_Preservation_(3).doc DOC document
610_A_RHIB_Boat_Gel_Coat_Preservation.doc DOC document
N32205-16-R-4307_Non-Disclosure_Agreement.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS WALLY SCHIRRA

(T-AKE 8)

1000-UNREP GEAR

N32205-16-R-4307

02 June 2016

ITEM NO 1005

CATEGORY "A"

PHD-SWC/TODESCA/DGC/CF

RAM TENSIONERS REMOVE AND REPLACE REVISION NO.1

1.0

ABSTRACT:

1.1 This work item describes the requirements for the removal/replacement and testing of seven (7) hydraulic Ram Tensioners. The Contractor will ship the removed Ram Tensioners to the MSC BATS Warehouse in San Diego.

2.0

REFERENCES:

2.1 Operation Technical Manual S9571-A9-MMA-010 Rev-1

Hydraulic Ram Tensioner

2.2 NAVSEA Dwg 6519082 Navy Standard Ram Tensioner.

2.3 NAVSEA Dwg 6651883 Interface Requirements Navy Standard Ram Tensioner

2.4 NAVSEA Dwg 5746880 System Interface Requirements-STREAM Fueling Station 2.5 NAVSEA Dwg 5746882 System Interface Requirements-STREAM Cargo Station

2.6 S9571-AQ-MMA-010 Control, Automatic Ram Sending Unit

3.0

ITEM LOCATION/DESCRIPTION:

3.1 Location/Quantity:

3.1.1 Location: 02 Level

Unrep Station No. 1 Model 6519082-1 Unrep Station No. 2 Model 6519082-1 Unrep Station No. 3 Model 6519082-3 Unrep Station No. 4 Model 6519082-2 Unrep Station No. 5 Model 6519082-1 Unrep Station No. 6 Model 6519082-1 Unrep Station No. 8 Model 6519082-1

3.1.2 Quantity: Seven (7) Ram Tensioners.

3.2 Description/Manufacturer's Data:

3.2.1 Ram Tensioner Assembly

Manufacturer: Naval Sea Systems Command

Drawing: NAVSEA 6519082

Model: 120

WIRE ROPE DIAMETER: 1”, 7/8”, 3/4"

4.0

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government Furnished Equipment (GFE): None

4.2 Government Furnished Materials (GFM):

Part Description
Part No/NSN
Qty
U/I
Remarks
Ram Tensioner
NAVSEA D6519082-1
5
Each
Rams Provided by NSWC PHD
Ram Tensioner
NAVSEA D6519082-2
1
Each
Ram Provided by NSWC PHD
Ram Tensioner
NAVSEA D6519082-3
1
Each
Ram Provided by NSWC PHD
Fyrquel/MIL-H-19457C
9150-01-113-2047
14
DR
55 Gal Drum PE Furnish
3/4" Spanwire
4010-00-142-6341
1
RO
900 Feet
7/8" Spanwire
4010-00-142-6342
1
RO
900 Feet
1" Highline
4010-01-309-7439
5
Each
800 Feet
Terminal End Fitting, WR 3/4"
4030-01-315-4279
1
Each
Terminal End Fitting, WR 7/8"
4030-01-199-5649
2
Each

PPG Ameron 240

5
Gallons

4.3 Government Furnished Services (GFS):

4.3.1 Port Hueneme Representative will provide technical support/guidance during the accomplishment of this work item.

5.0 NOTES:

5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 24, 27, 28 and 29.

5.2 The Contractor and all subcontractors regardless of tier are advised to review other work items under this contract, including but not limited to Work Items 011, 013, 014 and 021 to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.

5.3 The Contractor shall provide any excess parts/material to the MSCREP at the completion of this repair.

5.4 The Ram Tensioners must be removed from the ship within 14 days from the start of the availability to ensure their refurbishment is in time for the next T-AKE availability 6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED: For each Ram Tensioner

7.1 Arrangement/Outfitting:

7.1.1

The contractor shall remove the Spanwire or Highline from the ram tensioner. At the completion of the work item the contractor shall install a new GFM Spanwire or Highline. The new Spanwire or Highline will be slushed with approved wire rope exposed gear grease during installation.

7.2 Structural: None Additional

7.3 Mechanical/fluid:

7.3.1 Bleed all air from ram tensioner hydraulic system using air bleed valve sight glass. Bleed all air from ram tensioner accumulator using air dump valve. Disconnect HP air piping at tail piece union. Tag-out Ram Tensioner H.P. air charging valve.

7.3.2

Drain hydraulic fluid from ram tensioner and overflow reservoir in accordance with chapter 6-41 of ref. 2.1 into clean containers for possible reuse. If fluid is contaminated and cannot be purified shipyard to properly dispose of fluid as HAZMAT.

NOTE:

Do not mix hydraulic fluid removed from ram tensioner with hydraulic fluid removed from overflow reservoir

CAUTION

WEAR FACE SHIELD, NEOPRENE OR BUTYL RUBBER BOOTS AND GLOVES WHEN CONTACT WITH RAM TENSIONER HYDRAULIC FLUID IS POSSIBLE. IN AN ATMOSPHERE CONTAINING A FINE SPRAY OR MIST OF RAM TENSIONER HYDRAULIC FLUID, FULL FACE PIECE AND CONTINUOUS AIRLINE RESPIRATOR MUST BE WORN.

7.3.4 Remove spanwire/highine from ram tensioner and winch and spool onto a wire rope reel and hold in protected area for reinstallation.

7.3.4 Place a small wooden wedge between Automatic Ram Control (ARC) sending unit wire rope drum and housing to prevent unwinding.

7.3.5 Disconnect and remove sending unit cable clip from ram upper sheave assembly and hold for reinstallation on replacement ram tensioner.

7.3.6 Disconnect Automatic Ram Control sending unit from ram tensioner IAW Ref. 2.6, and hold for reinstallation on replacement ram tensioner.

7.3.7 Remove ram tensioner foundation bolts and remove ram from its foundation IAW Ref. 2.3 and prepare for shipment.

7.3.8 Clean ram tensioner mounting pads and protect machined surfaces on top of ram tensioner foundation and preserve.

7.3.10 Install replacement ram tensioner in accordance with Chapter 8 of Reference 2.1 and Ref. 2.3.

7.3.11 Ream the four corner bolt holes of each foundation and ram approximately 1 ½ inch diameter to suit corner bolts and provide and install four fitted hold-down bolts conforming to MIL-S-1222, Type III grade 5 steel, and zinc plated self locking nuts conforming to MIL-N-25027. Provide and install remaining 18, 1 ½ inch diameter bolts and locking nuts. Torque all nuts to 500 ft. lbs.

7.3.12 Conduct High-Pressure Air Test IAW Chapter 8 of Reference 2.1.

7.3.13 Remove tags from H.P. air system valves and place back into service.

7.3.14 Fill ram tensioner with hydraulic fluid conforming to Fyrquel 220MLT, MIL-H-19457C (SH). Charge ram in accordance with Chapter 8 pera 8-6 of Reference 2.1.

7.3.15 Reinstall Automatic Ram Control sending unit. Install sending unit cable clip on upper sheave assembly of ram tensioner and adjust in accordance with Chapter 8 of reference 2.6

7.3.16 Install Contractor provided test wire ropes and accomplish special static structural weight test in accordance with reference 2.2 and 2.3. Install test wire rigged as in service, dead-ended to itself around Spanwire/Highline winch drum so as to not apply torque to the drum. Protect drum with wood dunnage.

Note

Verify winch wire rope drum jaw clutch is disengaged

7.3.17 Upon completion of special static structural testing, reconfigure test wire rope to accomplish rated load operational test. Install test wire rigged as in service with wire dead ended to drum and wire on average lay.

7.3.18 Upon completion of rated load test, remove test wire and install ship’s wire rope and accomplish preoperational test in accordance with Chapter 8 para 8.7.

7.4 Electrical:

7.4.1 Tag out spanwire winch prior to ram tensioner removal.

7.4.2 Energize spanwire winch upon completion of installation to accomplish operational testing of new ram tensioner.

7.4.3 Adjust ARC sending unit switches in accordance with reference 2.6.

7.5 Electronics: None Additional

7.6 Preparation of Drawings: None Additional

7.7 Inspection/Test:

7.7.1 Conduct Post installation inspection as per

Ref 2.1 chapter 8 paragraph 8-5.

7.7.2 Conduct High-Pressure Air test IAW

Chapter 8 of Reference 2.1. Ensure higline end fitting is connected to a 50,000 lb statically tested attachment point or spanwire end fitting to a 36,000 lb statically tested attachment point. Using the highline or spanwire winch, remove all wire rope slack.Remove accumulator drain plug (figure 7-1, sheet 8, 145) and O-ring (146). Connect a hose to accumulator drain port; place free end of hose in a bucket of water. Verify that replenishing shutoff valve (figure 7-1,sheet 6,86) from fluid storage tank is shut. Shut air bleed (dump) valve (figure 7-1, sheet 2, 161); slowly open charging/air supply valve and apply high pressure air at 2,000 psi to accumulator for 10 minutes.Observe free end of hose. A steady stream of air bubbles indicates an accumulator piston seal leak. An occasional bubble during the test can be ignored.Shut air supply valve and open air dump valve. Apply low-pressure air to accumulator drain to move piston back up in accumulator. Remove low-pressure air and remove and replace piston seal (paragraph 6-7.19.2 through 6-7.19.5).Remove hose and reinstall accumulator drain plug (145) and O-ring (146).Repeat high-pressure air test (steps 1 through 8 above) to verify replacement seal does not leak.

7.7.3 Conduct special structural static test of

completed ram tensioner installation by applying 36,000 lb.load for Spanwire, 50,000lb.load for Highline,for 10 minutes to Test wire in as rigged condition withram tensioner piston in secured position.

7.7.4 Conduct rated load operational test with test wire

rope by cycling ram 100 cycles at working flask pressure of 1550 psi,for Spanwire, and 1950 psi, for Highline, using the spanwire/highline winch to let the ram piston extend up and haul down.

7.7.5 All test shall be conducted in presence of

Govt/PHD rep. Provide completed test memo to ship and

Govt/PHD rep. Install test label plate in vicinity of each Ram Tensioner listing test completed, test facility and date.

7.8 Painting:

7.8.1 Apply two overall coats of PPG Ameron 240 or MSC

approved equal surface tolerant epoxy primer to a DFT of 10 mils. Apply one overall finish coat of Amershield paint to a DFT of 4 mils in way of prepared and primed surfaces.

7.8.2 Paint all new and disturbed surfaces to match

surrounding areas.

7.9 Marking:

None

7.10 Manufacturers Representative: None.

7.11 Crating and Shipping

7.11.1 Unpack and reuse the crates and shipping materials that the supplied Ram Tensioners were packed in to prepare for shipment and ship to:

MSC BATS Warehouse 9284 Balboa Avenue San Diego, CA 92123 POC: Blake Nam, Tel: 619.553.6053 blake.name@navy.mil 8.0 GENERAL REQUIREMENTS: None Additional 1005-1