USNS WALLY SCHIRRA
(T-AKE 8)
600-OUTFIT, FURNISHINGS, AND HABITABILITY
N33205-16-R-4307
03 JANUARY 2016
ITEM NO: 609
CATEGORY “A”
MSC/PM6/SA
LIFE BOAT GEL COAT PRESERVATION
1.0 ABSTRACT:
1.1 This work item describes the requirements to remove the Life Boats and restore the Fiberglass Gel Coat both above and below the waterline.
2.0 REFERENCES:
2.1 Technical Manual TS800-AE-MMC-020, Life Boat Diesel Engine, SABB Type L3.139 LB(Copy Required)
2.2 IMO MSC.1/Circ.1206, Measures to Prevent Accidents with Life Boats
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Location/Quantity:
3.1.1 Location:
3.1.1.1 04 Level, Fr 61 and Fr 65 (Port)
3.1.1.2 04 Level, Fr 63 and Fr 67 (Starboard)
3.1.2 Quantity:
3.1.2.1 Four (4) Life Boats, Motor Propelled
3.2 Item Description/Manufacturer’s Data:
3.2.1 Description:
3.2.1.1 Life Boats – Manufactured by FASSMER, 99 person capacity, Model CL-C 11.5, Length: 11.5M, Hull: Fiberglass Reinforced Plastic, Engine: SABB Diesel Type L3.139 LB, 29 BHP @ 3000 RPM.
3.3 Bill of materials (Contractor Furnished Material):
3.3.1 The Contractor shall provide the necessary tooling, staging, equipment and compound and/or waxing needed to preserve the outer gel coat.
3.3.2 In addition, the contractor shall provide the following material for replacement;
4 each Mechanical Fuel indicators (for lifeboats)
4ea Remote control wire weights (for lifeboat davits)
1 each Instruction Sticker (Part 4012220)
1 each Instruction Sticker (Part 401222)
1 each Instruction Sticker (Part 401213)
1 each Instruction Sticker (Part 401100)
8 each Limit switches (lifeboat davits)
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.
5.0 NOTES:
5.1 The Contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the Contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTRs 1-7.
5.2 The Contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their affect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
5.3 THE USNS TAKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Arrangements and Outfitting;
7.1.1 Upon ship arrival, remove each Life Boat from its stowage location.
7.1.2 Notify the Captain and Chief Mate prior to removal of the Life Boats.
7.1.3 All Life boat shall be transported to a covered or inside work area.
7.1.4 Fabricate a temporary cradle capable of supporting the each Life Boat. Support system shall be high enough to inspect and repair the fiberglass gel coat below the waterline. Take extreme care NOT to damage the cooling coils at keel.
7.1.5 Notify the Chief Mate and/or Port Engineer to perform visual inspections of the Life Boat, above and below the waterline. Deficiencies shall be noted and documented.
7.1.6 Visually inspect the hull integrity.
7.1.7 Visually inspect all gaskets to doors and hatches.
7.1.8 Perform a spray test to doors and hatches to ensure no leaks exist.
7.1.9 Clean and lubricate hatch dogs and castors.
7.1.10 Clean the exterior hull surfaces and fittings. Surface shall be free of salt, grease, dirt, and debris.
7.1.11 Wax Life Boat exterior, above and below the waterline including the top capsule.
7.1.12 Replace recommended items identified as CFM by prior inspection by FASSMER USA.
7.1.13 Reinstall the Life Boats onboard ship.
7.2 Structural: None.
7.3 Mechanical / Fluid: None.
7.4 Electrical: None.
7.5 Inspection and Test:
7.5.1 MSC Rep and Ships Force shall perform final inspection of gel coat restoration as well as marking prior to loading the Lifeboats onboard.
7.6 Preparation of Drawings/Documentation:
7.6.1 Provide a final report and brief the Chief Engineer and Port Engineer prior to leaving the vessel on all findings. Provide an electronic final type written report to the Chief Engineer and Port Engineer.
7.7 Prepare red-line markups: None.
7.8 Painting:
None.
7.9 Markings:
7.9.1 Lifeboats and equipment shall be marked as required by USCG regulations and MSC instructions.
7.9.1.1 Re-apply as necessary all lettering on Life Boats in accordance with USCG rules and regulations.
7.10 Manufacturer’s Representative:
7.10.1 Recommended Source:
FASSMER USA
Carlos Lopez
3650 NW 15th Street
Lauderhill, FL 33311
Tel:305.314.9161
Fax:954.900.2733
8.0 GENERAL REQUIREMENTS: None Additional.