406_A_Communication_Suite_Groom.docx

DOCX document 32 KB Posted

Attached to
USNS WALLY SCHIRRA (T-AKE 8): ROH/DD
Solicitation number
N32205-16-R-4307
Issued by

About this file

Work Item 406

View the file

Other files

File Type Posted
N32205-16-R-4307_Amendment_0004.doc DOC document
Work_Item_516_and_Ref.zip ZIP file
0910_B_Dry_Docking_and_Undocking_Vessel.doc DOC document
J-2_and_J-3.zip ZIP file
Work_Item_406_Ref.zip ZIP file
Q_AND_A_Responses_3.docx DOCX document
J_-_2_Category_A_Items.xls XLS spreadsheet
Q_AND_A_Responses_2.docx DOCX document
Q_AND_A_Responses_1.docx DOCX document
Work_Item_506_Recefernce_2.2.pdf PDF
1005_A__Ram_Tensioners_Remove_and_Replace_REV_1.doc DOC document
204_A_Propulsion_Motor_and_Cooler_Cleaning_Inspection_Maintenance.doc DOC document
N32205-16-R-4307_Amendment_00003.doc DOC document
Work_Item_506_Reference_2.1.pdf PDF
Work_Item_204_T9235-AG-MMC-010_Propulsion_Motor.pdf PDF
Amendment_0002_Work_Items_and_referances.zip ZIP file
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_2_Category_A_Items.xls XLS spreadsheet
N32205-16-R-4307_Amendment_00001.doc DOC document
J-6.zip ZIP file
J_Attachments_2-12.zip ZIP file
FBO_J-A-N32205-16-R-4307_ROH-DD_USNS_WALLY_SCHIRRA_(T-AKE_8).doc DOC document
N32205-16-R-4307.doc DOC document
609_LifeBoat_Gel_Coat_Preservation_(3).doc DOC document
610_A_RHIB_Boat_Gel_Coat_Preservation.doc DOC document
N32205-16-R-4307_Non-Disclosure_Agreement.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS WALLY SCHIRRA

(T-AKE 8)

400-COMMUNICATION & NAVIGATION AIDSN32205-16-R-4307
03 January 2016
ITEM NO. 406Category "A"MSC/ N6442/CJ/STD

COMMUNICATION SUITE GROOM

1.0 ABSTRACT:

1.1. Provide the services of a qualified Electronics Technician intimately familiar with the following systems to perform a visual inspection, system preventative maintenance (PM) tasks for systems listed below.

2.0 REFERENCES:

2.1. AN/USQ-155 Manufacturer’s Technical Manual

2.2. US Navy Preventative Maintenance System:

2.2.1. MIP 4416/510_2W-1/M.

2.2.2. MIP 4416/510_S-1

2.2.3. MIP 4411/019 MRCs R-1 and Q-1

3.0 ITEM LOCATION/DESCRIPTION:

3.1. Location: Transmitter Room 07-66-3/ TOPSIDE 08 DECK

3.2. Description:

3.2.1. AN/USC-61(v) DMR SATCOM and LOS Radios

3.2.2. RT-1799(P) Radio Receiver-Transmitter (3) EA

3.2.3. OE-570/WSC Antenna Group (SATCOM) (2) EA

3.2.4. AM-7585 100W RF POWER AMP (8) EA

3.2.5. AM-7584 200W RF POWER AMP (4) EA

3.2.6. OA-9277/SRC UHF LOS MULTICOUPLER (2) EA

3.2.7. AS-1735/SRC UHF ANTENNA GROUP (2) EA

3.2.8. AS-2809/SRC VHF ANTENNA (2) EA

3.2.9. CV-4376 Signal Data Converter (2) EA

3.2.10. HMI- ROC Computer (2) EA

3.3. Location: Naval Communications Center 07-62-1

3.4. Description:

3.4.1. AN/USQ-155 Tactical Variant Switch (TVS)

3.4.2. CorScan Computer (2)

3.4.3. CD-163(P) Interface Control Processor (ICP)

3.4.4. CV-4419(P) Red Analog Port Concentrator Unit

3.4.5. SA-2755(P) Black Tactical Switch Matrix Engine

3.4.6. CV-4417(P) Black D/A Port Concentrator Unit

3.4.7. SA-2777(P) Red Tactical Switch Matrix Engine

3.4.8. CV-4418(P) Red Digital Port Concentrator

3.4.9. AN/SYQ-26(V)2 SMS NAVMAC II

a. DISPLAY TERMINALS (2) EA

b. KBM SWITCH (2) EA

c. COMPUTER CPU (2) EA

d. VME NCC (2) EA

e. LASER PRINTER (2) EA

f. PERSONAL COMPUTER WORK STATION (1) EA

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5.0 NOTES:

5.1. The Contractor shall submit a security clearance list to the ship and MSC REP for working in the secure communications room. Contractor personnel shall have a minimum of “secret” security clearance for COMM Center access.

5.2. The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTR) to determine their effect on the work items in this work package, which may be effected by the requirements of this item.

5.3. This ship contains High Voltage (HV) electrical systems. The contractor and subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a contractor or subcontractor approach, work on, or enter a High Voltage area without proper authorization.

5.4. The USNS WALLY SCHIRRA electrical color coding does not follow consistent color scheme. The ship is known to have current carrying conductor’s colored green, blue, black and white. The contractor shall assume all electrical cables are hot until tested otherwise. The contractor shall test all electrical cables to ensure they are dead prior to working on the item.

5.5. All shipboard lockout tag out procedures shall be followed by the contractor.

6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional

7.0 STATEMENT OF WORK REQUIRED:

7.1. AN/USQ-155 Tactical Variant Switch (TVS)

7.1.1. Contractor shall perform a Maintenance Review Assessment (MRA), to include a visual inspection, preventative and corrective maintenance and a full system alignment of the installed AN/USQ-155 Tactical Variant Switch (TVS) system and associated equipment listed in paragraph 3.2 IAW reference 2.1.1, 2.1.2 and 2.1.3.

7.1.2. The contractor shall verify and document all software versions, patches, switch settings and jumpers in all equipment listed in 3.2, IAW references 2.1.1, 2.1.2 and 2.1.3. All documentation shall be submitted to the MSC P/E rep and ships SCO upon completion of this service order.

7.1.3. The contractor shall review HMI computer operations for proper file maintenance or anomalies and recommend corrective actions as necessary.

7.1.4. The contractor shall provide any training assistance as may be necessary if operational discrepancies are noted during the groom.

7.2. AN/SYQ-26 MAVMAC II

7.2.1. Contractor shall perform a Maintenance Review Assessment (MRA), to include a visual inspection, preventative and corrective maintenance and a full system alignment of the installed AN/SYQ-26 NAVMAC II system and associated equipment. Verify operability of VME 1 and 2. Verify system control processing controllers, CVT operability, and data input/output processor board.

7.2.2. The contractor shall verify the operability of the SPARE NAVMAC II console, and document all software versions, patches, switch settings and jumpers in all equipment. All documentation shall be submitted to the MSC P/E and ships SCO upon completion of this service order.

7.2.3. Demonstrate the satisfactory performance (copying) of the Fleet broadcast, CUDIXS circuit, full period termination and email & floppy distribution system.

7.2.4. Inspect the Azimuth wheels within the antenna for wear and proper operation.

7.3. AN/USC-61/SRC DMR

7.4. Inspection/Test:

7.4.1. The contractor shall provide daily briefings to the MSCREP and upon completion of work, submit a detailed written report of all work performed, work outstanding, and recommendations for follow up to ensure a fully functional communication system. The contractor shall complete a performance test on the entire system upon completion IAW with reference 2.1, and 2.2. The Contractor shall demonstrate proper operation of the entire system to the MSCREP and the Ships SCO upon completion of this service order.

7.5. Manufacturer’s Representative (MFR REP):

7.5.1. The contractor shall provide a qualified “Navy trained” Electronic technician or OEM factory trained REP to perform all tasks in this work item. Said representative shall have a minimum of 5 years hands on experience for all equipment listed under paragraph 3 above.

8.0 GENERAL REQUIREMENTS: None Additional.

406-5

File details come from the government source that posted it. Updated .